Making Structure Making Future ASCON Ref: 77-142/R-1//2024 Date: 18-01-2025 Annexure – B FORM – 2 [see Regulation 3] ENGINEER’S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated account – Project wise) To, The M/s Siyara Realty Pvt. Ltd. Mr. Kapil P. Patel B/913-914, Lodha Business District, Gate No 2, Akbar Camop Road, Thane (W) - 400 607 Subject: Certificate of Cost Incurred for Development of Building Plot A - [ Siyara Avenue - (Building-A, Building-B, Building-C)] [Having Basemen + Ground + 23 Upper Floor] S. No. 11 & 14, CTS No 700 (p), 706 (p), Final Plot No. 126-A, At Village : Kaneri , Taluka BHIWANDI District, THANE PIN 421302 having MahaRERA Registration Number P51700076976 (Only Applicable after project Registration) being developed by The M/s Siyara Realty Pvt. Ltd. Sir, 1 I J. N. Chaudhari has undertaken assignment of certifying Estimated Cost for Building Plot A - [ Siyara Avenue - (Building-A, Building-B, Building-C)] [Having Basemen + Ground + 23 Upper Floor] having MahaRERA Registration Number P51700076976 (Only Applicable after project Registration) being developed by The M/s Siyara Realty Pvt. Ltd. 2 We have estimated the cost of civil. MEP and allied works required for completion of the apartments and proportionate completion of internal & external works of the project as per specifications mentioned in agreement of sale. Our estimated cost calculations are based on the drawings plans made available to us for the project under reference by the Developer / Consultants. The Schedule of items and quantity required for the entire work as calculated by ___________________ Quantity Surveyor* appointed by Developer / Engineer, the assumption of the cost of material labour and other inputs made by developer and the site inspection carried out by us to ascertain / confirm the above analysis given to us. 3 We estimated Rs1,26,13,75,000.00 (Total of Table A and B) at the time of Registration. The estimated Total Cost of project is with reference to the Civil, MFP and Allied works required for completion of the apartments and Proportionated completion of internal & external works, as per specifications mentioned in agreement of sale and for purpose of obtaining occupation certificate / completion certificate for the Building(s) / Wing(s) / layout / Plotted Development from the being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. Making Structure Making Future ASCON 4 The Estimated cost incurred till date is calculated at Rs5,75,00,000.00 (Total of Table A and B). The amount of Estimated Cost Incurred is calculated on the basis of input materials / services and units cost of these items. 5 The Balance Cost of Completion of the Civil, MEP and Allied works for completion of the apartments and proportionate completion of internal & external works, as per specifications mentioned in agreement of sale, of the project is estimated Rs1,20,38,75,000.00 (Total of Table A and B) 6 I certify that the Cost of the Civil, MEP and allied work for the apartments and proportionate internal & external works, as per specifications mentioned in agreement of sale, of the aforesaid Project as completed on the date of this certificate is as given in Table A and B below:- TABLE A Building bearing Number Building Plot A - Siyara Avenue (to be prepared separately for each Building / Wing / layout / Plotted Development of the Real Estate Project) Sr. No Particulars Amounts 1 Total Estimated cost of the Building / Wing / Layout / Rs1,25,43,75,000.00 Plotted Development as on date of Registration is 19-04-2024 2 Cost incurred as on date of certificate Rs5,75,00,000.00 18-01-2025 3 Work done in percentage (as percentage of the estimated cost) 4.58% 4 Balance Cost to be Incurred (Based on estimated Cost) Rs1,19,68,75,000.00 5 Cost Incurred on Additional / Extra Items not included Rs0.00 in the Estimated Cost (Table – C) TABLE B Internal & external Development Works in Respect of the Registered Phase Sr. No Particulars Amounts 1 Total Estimated cost of the Internal and External Development Rs70,00,000.00 works including amenities and Facilities in the Layout as 19-04-2024 Date of Registration is 2 Cost incurred as on date of certificate Rs0.00 18-01-2025 3 Work done in percentage (as percentage of the estimated cost) 0.00% 4 Balance Cost to be Incurred (Based on estimated Cost) Rs70,00,000.00 5 Cost Incurred on Additional / Extra Items not included 18-01-2025 Rs0.00 in the Estimated Cost (Table – C) Making Structure Making Future ASCON TABLE C List of Extra / Additional / Deleted Items considered in cost (which were not part of the original Estimated of Total cost) Sr. No List of Extra / Additional / Deleted Items Amounts 1 Rs0.00 2 Rs0.00 Yours faithfully For, ASCON Aarna Structural Consultants (J.N.Chaudhari) Director Chartered Structural Engineer IEI Regd. No. AM-150767-5 Lic. No.BMC/STR/C/61 Agreed and Accepted by…. JANAK Digitally signed by JANAK PUNJALAL PATEL DN: c=IN, o=PERSONAL, title=6359, pseudonym=275beb72ab584f9e84040cb15b7d c54e, PUNJALAL 2.5.4.20=b2208fcaa2bd2cc38f6a44aea2713df58 6341f02068e4b7bfe0e80153fb42236, postalCode=400607, st=Maharashtra, serialNumber=b3e93df8fe79bd4438a4518cbb3 PATEL 6a8a77a1bc4b03a7c7e0b73b13f1ff0edbb28, cn=JANAK PUNJALAL PATEL Date: 2025.01.18 12:39:01 +05'30' Name : The M/s Siyara Realty Pvt. Ltd. Date : 18-01-2025 *Note 1 The scope of work is to complete Registered Real Estate Project as per drawings approved from time to time and as per specification mentioned in a agreement of sale 2 (*) Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor, whose certificate of quantity calculated can be relied upon by the Engineer. In case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (*) and in case quantity are being calculated by office of Engineer, the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (*) 3 (**) Balance Cost to be incurred (4) may very from Difference between Total estimated Cost (1) and Actual Cost incurred (2) due to deviation in quantity required / escalation of cost etc. As this is an estimate cost, any deviation in quantity required for development of the Real Estate Project will result in amendment of the cost incurred / to be incurred. 4 All components of work with specifications are indicative and not exhaustive. 5 Please specify if there are any deviations / qualifications. Example : Any deviations in input materials used from specifications in agreement of sale.