I Archite cts, NIRMAL ARTS Interio r Design ers & Projec t Consu ltants. Off.: L-002, Sanghavi Estate, New RTO Road, Khadakpada, Near Clncrnax, Kalyan (W) 421301 Office Contact: 02S1·2232510, 7900093679, Mob.: 9820SGS37G, Emnll :• nlrmalarts20l6@gma1.com - Resi. Add : "Sitaram Niwas" Near Datta Mandir, Golavall VIiiage, Kalyan•Sh1I Road, MIOC, Oomb1vlt (E.) • 421 203 Ref.:- NAIKD/110125 Da tc:- 30/09/2025 l◄ORM-l ARCHITECT'S CERTIFICATE To, Mis. Shree Sai Malhar Developers Shree Malang Road, at post Pisavli, Tal. Kalyan, Dist. Thane Subject: Certificate of percentage of completion of construction work of "Anandi Vrindavan" Wing A & B of the Project [Maha RERA registration number PSl 700076958] situated on land bearing S. No. 28, H. No. 3, Village Pisavli, Tai. Kalyan, Dist. Thane PIN - 421301 admeasuring area 1240.00 sq. mt being developed by Mis. Shree Sai Malhar Developers. Sir, I, Sandeep P. Patil have undertaken assignment as Architect of certifying Percentage of Completion of Construction Work of "Anandi Vrindavan", Wing A & B of the Project [Maha RERA registration number PSl 70007695 8] situated on land bearing Survey No. 28, Hissa No. 3, Village Pisavli, Tal. Kalyan, Dist. Thane PIN - 421301 admeasuring area 1240.00 sq.mt. being developed by Mis. Shree Sai Malhar Developers. Based on Site Inspection, with respect to Layout / each of the Building/Wing of the aforesaid Real Estate Project I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein belo,,·. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. NIRMAL ARTS Arch itect s, Inte rior Des igne rs & Proj ect Con sulta nts. Off.: L 002, sanghavi E~tate, New RlO Road, Khadakpada, ~Jcar Cinemax, Kalyan (W) 421301 Office Contact: 0251·2232510, 7900093679, Mob.: 9820565376, Emall :• nlrmalarts2016@gmal.com Resi. Add; "Sitarani Niwas" Near Datta Mandlr, Golavall VIiiage , Kalyan•Shil Road, MIDC, Domblvfi {E.) • 421 203 TABLE-A Wing- 'A' Tasks I Activity Percentage of actual Sr. no Work done (As on (1) date of the certificate) (2) (3) 1. Excavation 100% 2. Basement ( if any ) NA 3. Podiums ( if any ) NA 4. Plinths 50% 5. Stilt Floor 0% 6. 4th slabs of Super Structure 0% 7. Internal walls, Internal Plaster, Floorings, Doors and windows within Flats/Premises 0% 8. Sanitary Fittings within the Flat/Premises 0% Staircases Lifts Wells and Lobbies at each Floor 9. level Overhead and Underground Water Tanks 0% External plumbing and external plaster, elevation, completion of terraces with 0% I0. waterproofing of the Building/ Wing. Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ 11. NOC, Finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other 0% requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. NIR Architects, Interio MAl ARTS r Desig ners & Project Consultants. Off.: L-002, Sanghavi l state, New HTO Road, Khadakpada, Near Cmemax, Kalyan (W) 421301 Office Contact: 02S1-2232510, 7900093679, Mob.: 9820565376, Emall :• nlrrnalarts20l6@gmal.com .._____Resl. Add: "Sitaram Niwas'' Near Datta Mondlr, Golavoli Village, Kalyan-5hil Road, MIDC, Domb,vli (E.) ,.;.::::.:. • 421 203 :.:.,;:.::. :....:.:.;~ -----.;:.. :.;.;,;.;., :.;.:.:.:,: ~~~:...; .:.~__,; .-----__ ._.,;--_. .;..------ TABLE - A Wing- 'B' Sr.no Tasks I Activity Percentage of actual (1) (2) Work done (As on date of the certificate) (3) l. Excavation 1----- - 100% ? -· Base1uent (if any ) NA 3. Podiums (if any ) NA 4. Plinths 0% 5. Stilt Floor 0% 6. 3rd Slabs of Super Structure 50% 7. Internal walls, Internal Plaster, Floorings, Doors 0% and windows within Flats/Premises 8. Sanitary Fittings within the Flat/Premises 0% 9. Staircases Lifts Wells and Lobbies at each Floor 0% level Overhead and Underground Water Tanks 10. External plumbing and external plaster, 0% elevation, completion of terraces with waterproofing of the Building/ Wing. 11. Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s. plinth 0% protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. - NIRMJ\l ARTS ! \rch itec ts, Inte rior Des ign ers & Pro ject Con sul tan ts. Off. : 1-002, Sangha,11 Estate, New RTO Road, Khada kpada, Near Cincmax, Kalyan (W) 4213 01 Office Contact: 0251-2232510, 7900093679, Mob. : 9820565376, Email :- nlrma1arts2016@gmai.com Resi. Add: "Sitaram Nlwas" Near Datta Mandir, Golavali Village , Kalyan-Shll Road, MIOC, Oombivli (E.) - 421 203 TABLE- B Con1mon Areas (Internal and External Development Wor ks) in respect of the Rc2istcrcd Phuse / Project Number Sr.no Comn1on areas and Facilities Proposed % of actual Deta ils (1) (2) (Yes/No) Work done (3) (as on date of the certificate) (4) I. Internal Roads & Footpaths 2. Wate r supply No - - Yes 0% - Sewerage (Chamber lines, Septic 3. Tank, STP). Yes 0% - 4. Storm Water Drains 5. Landscaping & Tree Planting Yes 0% - 6. Street Lismting Yes 0% - No 0% - 7. Community Buildings No NA - 8. Treatment and disposal of sewage - and sullage water No NA 9. Solid Waste management & - Disposal No NA 10. Water conservation/ Rain water Yes - harvesting 0% 11. Energy management No NA - Fire protection and fire safety 12. Yes - requirements 0% Electrical meter room, sub-station, 13. Receiving station. Yes 0% - 14. Others (Option to Add more). No NA Aggregate area of recreational - 15. No NA Open Space - Ar. and ep P. Patil Reg. No. CA/2008/42512 For SHREE SAi M,\LHAR DEVELOPERS Agreed and Accepted by t.....-;:::;' ,/ ,/ . • Signature of Promoter ' PARTNER Name: Mis. Shree Sai Mnlhnr Developer:,; through Mr. Prm in Sonnwane Date : J0-0 9 .. 2025