NIRMA lJlRTS Architects, Interior Designers & Project Consultants . Off. : L·002, Sanghavl Estate, New RTO Road, Khadakpada, Near Clnemax, Kalyan (W) 421301 Office Contact: 0251·2232510, 7900093679, Mob. : 982056S376, Email:• nlrmalarts2016@gmal.com Resl. Add : "Sitaram Niwa~" Near Datta Mandlr, Golavall VIiiage, Kalyan•Shll Road, MIDC, Oombivli (E.) 421 203 Rcf.:-NA/KD/39N/25 Date:- 31/03/2025 FORM-1 ARCHITECT'S CERTIFICATE To, Ws. Shree Sai Malhar Developers Shree Malang Road, at post Pisavli, Tal. Kalyan, Dist. Thane Subject: Certificate of Percentage of Completion of Construction Work of "Anandi Vrindavan" Wing A & B of the Project [Maha RERA registration number P51700Q76958] situated on land bearing S. No. 28, H. No. 3, Village Pisavli, Tai. Kalyan, Dist. Thane PIN - 421301 admeasuring area 1240.00 sq. mt being developed by Mis. Shree Sai Malhar Developers. Sir, . I, Sandeep P. Patil have undertaken assignment as Architect of certifying Percentage of Completion of Construction Work of "Anandi Vrindavan", Wing A & B of the Project [Maha RERA registration number P51700076958] situated on land bearing Survey No. 28, Hissa No. 3, Village Pisavli, Tai. Kalyan, Dist Thane PIN - 421301 admeasuring area 1240.00 sq.mt being developed by Mis. Shree Sai Malhar Developers. Based on Site Inspection, with respect to Layout / each of the Building/Wing of the aforesaid Real Estate Project I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. NIRMA l ARTS Architects, Interior Designers & Project Consultants. Off.: L-002, Sanghavl Estate, New RlO Road, Khadakpada, Near Clnemax, Kalyan (W) 421301 Office Contact: 02S1·2232S10, 7900093679, Mob.: 9820565376, Email:- nirmalarts2016@gmal.com Rest. Add: "Sitaram Niwas Near Datta Mandir, Golavali Village, Kalyan•Shil Road, MIDC, Dombivli (E.) • 421203 11 TABLE-A Wing- 'A' Percentage of actual Tasks / Activity Sr. no Work done (As on (1) ' ., date of the certificate) (2) (3) 1. Excavation 85% 2. Basement ( if any ) NA 3. Podiums ( if any ) NA 4. Plinths 0% 5. Stilt Floor 0% 6. Slabs of Super Structure 0% 7. Internal walls, Internal Plaster, Floorings, Doors 0% and windows within Flats/Premises 8. Sanitary Fittings within the Flat/Premises 0% Staircases Lifts Wells and Lobbies at each Floor 0% 9. level Overhead and Underground Water Tanks External plumbing and external plaster, elevation, completion of terraces with 0% 10. ' waterproofing of the Building/ Wmg. Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s. plinth 11. protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other 0% requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. NI RM Al AR TS Arch itec ts, Inte rior Des igne rs & Proj ect Con sult ants . x, Kalyan (W) 421301 Off. : L-002, Sanghavi Estate, New RTO Road, l