BASAVARAJS. GADEKAR BE (CIvil) VIJAYALAXMIB. GADEKAR DArch Consulting Civl Enginears & Asst. Architects CoNsulTANTS Mob: 9820196711 Of: 9019905711 E-mail consultingarchitect9@gmail com Ref. No.: AR 6122015s Date Form 1 (See Regulation 3) cONSULTUNG CIYIL ENGINEER &ASST. ARCHITECTS CERTIEICATE (To be submitted at the time of Registration of Ongoing Project and Withdrawal of Money from Designated Account) To, M/s. ). K. Associates Sheetal Dhara, Sheetal Nagar, MiraRoad (East), Tal. & Dist,-Thane. Subject: Certificate of percentage of completion of construction work of building Wing -A & B, of the Project "Sheetal Dhara" (MahaRERA Registration Number P51700076937) situated at (old) Survey No. 733/Pt, (New) Survey No. 124/Pt, Plot No. 121, 122, 139, 140; of Village - Bhayandar, Taluka- Thane, District- Thane, PIN- 401107. Admeasuring Total Plot area 1,800.00 Sq, mtrs. and Total approved built up area 4,592.07 Sq.mt., being developed by M/s. J.K. ASSOCIATES. Sir, , Shri. Basavaraj S.Gadekar (M/s. Tej's' Consultants) have undertaken assignment as Consulting Civil Engineer of certifying percentage of completion of construction work of the building "Wing -A & B of the Project "Sheetal Dhara" (MahaRERA Registration Number PS1700076937) being developed by M/s. J.K. ASSOCIATES.. Based on Site Inspection, with respect to the building Wing A & B of the aforesaid Real estate project "Sheetal Dhara, I certify that as on the date of this certificate, the percentage of work done for each of the building of the Real Estate Project as registered vide number P51700076937 under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire Project is detailed in Table B. Contd...2 1002, Nakshatra Tower, Behind Balaji Hospital, Golden Nest Circle, Mira Road (East), Dist. Thane - 401 107. BASAVARAJ S.GADEKAR BE (Civil) VIJAYALAXMI B. GADEKAR DArch. Consulting Civil Engineers & Asst. Architects CoNSulTANTS Mob: 9820195711 Off:9619905711 E-mal: consultingarchitect9@gmail.com Ref. No. AR-Gi2]o2 Date: 3o/6]202 ..2... TABLE- A Wing -A of the project "Sheetal Dhara" Sr. Tasks /Activity Percentage of Work Done No. 1. Excavation 100% 2. Plinth 100% 3. Podiums (if any) 0% 4. Stilt Floor 100% 5. Slabs of Super Structure 90.90% Number of slab- 10 /11 No. of slab (Part Ground +1st Podium+ 2nd to 10th Part Floor) 6. Internal walls, Internal Plaster, Flooring, Doors and 0% Windows within Flats/Premises 7. Sanitary Fittings within the Flat/Premises 0% 8. Staircases, Lifts wells and Lobbies at each Floor level 0% Overhead and Underground Water Tanks 9. External Plumbing and external plaster, elevation, 0% completion of terraces with waterproofing of the Building /Wing. 10. Installation of Lifts, water pumps, Fire Fighting 0% Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall and allother requirements as may be required to complete project as per specification in agreement of Sale. Any other activities. Contd...3 1002, Nakshatra Tower, Behind Balaji Hospital, Golden Nest Circle, Mira Road (East), Dist. Thane - 401 107. BASAVARAJ S. GADEKAR BE (Civil) VIJAYALAXMIB. GADEKAR DArch. Consulting Civil Engineers & Asst. Architects CONSulTANTS Mob:9820195711 Off: 9619905711 E-mail : consultingarchitect9@gmail.com Ref. No.: AR-b12lpo. Date: aalsl202s TABLE- A Wing -B of the project "Sheetal Dhara" Sr. Tasks /Activity Percentage of Work Done No. 1. Excavation 100% 2. Plinth 100% 3. Podiums (if any) 100% 4. Stilt Floor 100% 5. Slabs of Super Structure 100% Number of slab- 12 /12 No. of slab (Stilt +1st Podium+ 2nd to 11h Floor) 6. Internal walls,Internal Plaster, Flooring, Doors and 100% Windows within Flats/Premises 7. Sanitary Fittings withinthe Flat/ Premises 100% 8 Staircases, Lifts wells and Lobbies at each Floor level 100% Overhead and Underground Water Tanks 9. External Plumbing and external plaster, elevation, 100% completion of terraces with waterproofing of the Building /Wing. 10. Installation of Lifts, water pumps, Fire Fighting 100% Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other requirements as may be required to complete project as per specification in agreement of Sale. Any other activities. Contd....4 1002, Nakshatra Tower, Behind Balaji Hospital, Golden Nest Circle, Mira Road (East), Dist. Thane - 401 107. BASAVARAJS. GADEKAR BE (Civil) VIJAYALAXMIB. GADEKAR DArch. Consulting Civil Engineers & Asst. Architects CONSulTANTS Mob: 9820195711 Off:9819905711 E-mail : consultingarchitect9@gmail.com Ref. No.: AR612ho1 Date : 30,63026 .4.. TABLE- B. Internal & External Development works in respect of the cntire Registered Phase Wing -A &B of the project "Sheetal Dhara" Sr. Common areas and Facilities Proposed Percentage of Actual Details (5) No. (Yes /No) Work Done (1) (As on date of the Certificate) (4) 1, Internal Roads & Footpaths YES 100% 2. Water Supply YES 100% (Wing B) By MBMC After 0C 0% (Wing A) 3. Sewerage (Chamber, lines, Septic Tank, YES 100% (Wing B) STP). 0%(WingA) 4. Storm Water Drains YES 100% (Wing B) 0%(Wing A) 5. Landscaping & Tree Planting YES 0% 6. Street Lighting YES 100% 7. Community Building NA NA 8. Treatment and disposal of sewage and NA NA sullage water 9. Solid Waste management & Disposal NA NA 10. Water conservation /Rain water YES 100% (Wing B) harvesting 0%(Wing A) 11. Energy management YES 100% (Wing B) 0% (Wing A) 12. Fire protection and fire safety YES 100% (Wing B) requirements 0%(Wing A) 13. Electrical meter room, sub-station, YES 100% (Wing B) receiving station 0% (Wing A) 14. Others (Option to Add More) NA NA Yours faithfully, For TEJ'S CONSULTANTS DsybyAMATPAANLA BASAVARAJ SIDDAPPA GADEKAR CONSULTING CIVIL ENGINEER & ASST. ARCHITECTS (BASAVARAJ GADEKAR) MBMC/R/2024/APL/00032 Agreed and accepted by: M/S. J. K. ASSOCIATES (Director) Date: MIRA ROAD (East) SHEETTAL . 1002, Nakshatra Tower, Behind Balaji Hospital, Golden Nest Circle. Mira Road (East), Dist. Thane - 401 107.