Annexure A FORM 1 [See Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) To, M/s. QUBA TRADELINKS LLP H. No. 137/0, Opp. Darul Falah Masjid, Millat Nagar, Nashik Road, Vanjarpatti Naka, Bhiwandi - 421302 Subject: Certificate of Percentage of Completion of Construction Work of “UNITY TOWERS” having MahaRERA Registration Number P51700076917 being developed by M/s. QUBA TRADELINKS LLP. (For 01/04/2026 to 30/06/2026 i.e. Quarter 1 of F.Y. 2026-2027) Sir, I, Mr. Waheed Ahmad Hameed Ahmad Ansari of M/s. H.K. Design & Consultants, have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of “UNITY TOWERS” having MahaRERA Registration Number P51700076917 being developed by M/s. QUBA TRADELINKS LLP. Based on Site inspection. With respect to Layout / each of the Building/Wing of the aforesaid Real Estate Project. I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE A Building – UNITY TOWERS Sr. No Tasks / Activity Percentage of Actual (1) (2) work done (As on date of the certificate) (3) 1. Excavation 100% 2. Basement (if any) 100% 3. Podium (if any) N.A. 4. Plinth 100% 5. Stilt Floor NA. 6. Slabs of Super Structure 10.71% 7. Internal walls, Internal Plaster, Floorings, Doors and 0% windows within Flats/Premises 8. Sanitary Fittings within the Flat/Premises 0% 9. Staircases. Lifts Wells and Lobbies at each Floor level 10.71% Overhead and Underground Water Tanks 10. External plumbing and external plaster, elevation, 0% completion of terraces with waterproofing of the Building/wing, 11. Installation of Lifts. Water pumps, Fire Fighting 0% Fittings and Equipment as peer CFO NOC, Electrical fittings, Mechanical equipment, and compliance to conditions of environment/CRZ NOC. Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. TABLE B Common Areas (Internal and External Development Works) in respect of the Registered Phase. Sr. No Common areas and facilities Proposed (Yes/No) Percentage of Details (1) (2) (3) Actual Work Done (5) (As on date of the Certificate) (4) 1. Internal Roads & Footpaths No – – 2. Water Supply Yes 0% – 3. Sewerage (Chamber, lines, Yes 0% - Septic Tank, STP) 4. Storm Water Drains Yes 0% – 5. Landscaping & Tree Planting No – – 6. Street Lighting No – – 7. Community Buildings No – – 8. Treatment and disposal of No – – sewage and sullage water. 9. Solid Waste management & No – – Disposal 10. Water conservation / Rain Yes 0% – water harvesting 11. Energy management No – – 12. Fire protection and fire safety Yes 0% – requirements 13. Electrical meter room, sub- Yes 0% – station, receiving station 14. Others (Option to Add more) No – – Yours Faithfully, Agreed and Accepted by the Promoter: For M/s H.K. Design & Consultant For M/s. QUBA TRADELINKS LLP Name: Mr. Waheed Ahmad Ansari Signature of Promoter (License No. STATE/R/2025/APL/16598) Name: Shahnawaz Farooque Ahmed Momin Date: 30/06/2026 Date: 30/06/2026