Architecture I Planning i Liasoning tr Prqiect Management I lnteriors www, hk-design.in Annexure A FORM 1 [See Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) To, M/s. QUBA TRADELINKS LLP Ground Floor, H. No. 13710, t\lraziNursing Home, Old Agra Road, Opp. Darul Falah Masjid, Gulzar Nagar, Bhiwandi, Thane, Maharashtr a-421302 Subject: Certificate of Percentage of Completion of Construction Work of "UNITY TOWERS" having MahaRERA Registration Number P51700076917 being developed by M/s. QUBA TRADELINKS LLP. (For 01/07 nA25 tu 3010912025 i.e. Quarter 2 of F. Y.2025-2026) Sir, I, Waheed Ahmed Ansari of M/s H K Design Consultant, have undertaken assignment as Architect /Licensed Surveyor of certifiring Percentage of Completion of Construction Work of *UNITY TOWERS" having MahaRERA Registration Number P51700076917 being developed by M/s. QUBA TRADELINKS LLP. Based on Site inspection. With respect to Layout I each of the Building/Wing of the aforesaid Real Estate Project. I certifu that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activities of the entire phase is detailed in Table B. 0ffice No. 106, 1st Floor, Sanghvi Parrsssva Classic, Temghar, bhiwandi-Kalyan Road, Near Sai Baba Temple (Bhiwandi-Kalyan Bypass). Opp TVS Showroom, Bhiwandi - 421 308 90 11 1l 05 03 offic@hk-design.in hkdesign.consultants@gmail.com Architecture I Planning i l-iasoning t Project Management I lnteriors ECSt{SIJL-rAl\J'l*g rrrww.hk-de s n n TABLE A Sr. Tasks / Activity Percentage of Actual work done No (As on date of the certificate) (2) (1) (3) 1 Excavation t00% 2. Basement (if any) N.A. ^) Podium (if any) N.A. 4. Plinth 100% 5 Stilt Floor 0% 6 Slabs of Super Structure 14.28% (lsr SLAB COMPLETED) 7 Interrral walls, Intemal Plaster, Floorings, 0% Doors and windows within Flats/Premises 8. Sanitary Fittings within the Flat/Premises 0% 9 Staircases. Lifts Wells and Lobbies at 14.28% each Floor level Overhead and Underground Water Tanks 10. External plumbing and external plaster, 0% elevation, completion of terraces with waterproofing of the Building/wing, Office No. 1 06, 1 st Floor, Sanghvi Parrsssva Classic, Temghar, bhiwandi-Kalyan Road, Near Sai Baba Temple (Bhiwandi-Kalyan Bypass) 0pp. TVS Shourroom, Bhiwandi - 421 308 90 11 11 05 03 office@hk-design,in hkdesign.consultants@gmail.com ll'-.irtl|r'- tf-r ''i.ili t'tr 'i i r:,r -;, ,,'-. r"r;;1; ".111,1']a l'tirt'ri 1.tll.'l.r': Ctr l\l5uL-TAf\'l-f S WWtrY. e 11. Installation of Lifts. Water pumps, Fire 0% Fighting Fittings and Equipment as peer CFO NOC, Electrical tittings, Mechanical equipment, and compliance to conditions of environment/CRZ NOC. Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. 0ffice No. 1 05, 1 st Floor, Sanghvi Parrsssva Classic, Temghar, bhiwandi-Kalyan Road, Near Sai Baba Temple (Bhiwandi-Kalyan Bypass). Opp. WS Showroom, Bhiwandi - 421308 90 11 11 05 03 office@hk-design.in hkdesign.consultants@gmail.corn Architecture I Planning I Liasoning I Project Management i fnteriors ctrtt$5uL-rArv-r5 lqJw!$. h l{-d 65 n n TABLE B Common Areas (Internal and Extemal Development Works) in respect of the Registered Phase. Sr. Common areas and facilities Proposed Percentage of Details No (Yes/l.{o) (2) Actual Work Done (s) (1) (3) (As on date of the Certi{icate) 0(4) 1 Internal Roads & Footpaths NO 2. Water Supply YES 0% 3 Sewerage (Chamber, lines, Septic YES 0% Tank, STP) 4 Storm Water Drains YES 0% 5 Landscaping & Tree Planting NO 6 Street Lighting NO 7 Community Buildings NO 8 Treatment and disposal of sewage NO and'sullage water. 9 Solid Waste management & NO Disposal 10. Water conservation / Rain watel YES 0% harvesting 11 Energy management NO T2 Fire protection and fire safety YES 0% Requirements 13. Electrical meter room, sub-station, YES 0% Office No, 106, 1st Floor, Sanghvi Parrsssva Classic, Temghar, bhiwandi-Kalyan Road, Near Sai Baba Temple (Bhiwandi-Kalyan Bypass). 0pp. TVS Showroom, Bhiwandi - 421 308 90 11 11 05 03 offic@hk-design.in hkdesign.consultants@gmail.com