Annexure A FORM 1 [See Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) To, M/s. QUBA TRADELINKS LLP Ground Floor, H. No. 137/0, Alrazi Nursing Home, Old Agra Road, Opp. Darul Falah Masjid, Gulzar Nagar, Bhiwandi, Thane, Maharashtra-421302 Subject: Certificate of Percentage of Completion of Construction Work of “UNITY TOWERS” having MahaRERA Registration Number P51700076917 being developed by M/s. QUBA TRADELINKS LLP. (For 01/07/2024 to 30/09/2024 i.e. Quarter 2 of F. Y. 2024-25) Sir, I, Waheed Ahmed Ansari of M/s H K Design Consultant, have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of “UNITY TOWERS” having MahaRERA Registration Number P51700076917 being developed by M/s. QUBA TRADELINKS LLP. Based on Site inspection. With respect to Layout / each of the Building/Wing of the aforesaid Real Estate Project. I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activities of the entire phase is detailed in Table B. TABLE A Sr. Tasks / Activity Percentage of Actual No (2) work done (As on (1) date of the certificate) (3) 1. Excavation 80% 2. Basement (if any) 0% 3. Podium (if any) 0% 4. Plinth 10% 5. Stilt Floor 0% 6. Slabs of Super Structure 0% 7. Internal walls, Internal Plaster, 0% Floorings, Doors and windows within Flats/Premises 8. Sanitary Fittings within the 0% Flat/Premises 9. Staircases. Lifts Wells and Lobbies at 0% each Floor level Overhead and Underground Water Tanks 10. External plumbing and external 0% plaster, elevation, completion of terraces with waterproofing of the Building/wing, 11. Installation of Lifts. Water pumps, 0% Fire Fighting Fittings and Equipment as peer CFO NOC, Electrical fittings, Mechanical equipment, and compliance to conditions of environment/CRZ NOC. Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. TABLE B Common Areas (Internal and External Development Works) in respect of the Registered Phase. Sr. Common areas and Proposed Percentage of Details No facilities (Yes/No) Actual Work (5) (1) (2) (3) Done (As on date of the Certificate) 0(4) 1. Internal Roads & NO - Footpaths 2. Water Supply YES 0% 3. Sewerage (Chamber, lines, YES 0% Septic Tank, STP) 4. Storm Water Drains YES 0% 5. Landscaping & Tree NO - Planting 6. Street Lighting NO - 7. Community Buildings NO - 8. Treatment and disposal of NO - sewage and sullage water. 9. Solid Waste management NO - & Disposal 10. Water conservation / Rain YES 0% water harvesting