SCons.c0.In ssconscse@gmail.com consult_ssonly@rediffnail.com, 28578 +91-98704 Mob.: India. 602. 400 (w)-Thane Panchpakahadi, Chandanwadi, Shakha, Shivsena Opp.Heritage, Samrin Floor, 1st 17, Office: Supervisor Site as Sddiqui AliWajid Mr. (iv) Consultant MEP as Mane Pravin Mr. (ii) Consultant Structural as Bhonde RajkumarK. Shri (i ) Architect. an as Charpe Sachin Mr. (i) Owner: appointed by professionals are technical Following 1. Realty." Seher "M/s. developed by being area sq.mts. 3511.00admeasuring 400612; Pin Thane- Mumbra, Sonkhar, Village 69/3 68/3, S.No. bearing Plot the situated on Awaited) (Number numberRegistration MahaRERA having Residency" Mawadah Al "Known as " 6 to 1No, Building " MahaRERA, being underegistered be proposed to Project Estate Real Subject the for Cost Estimated certifying assignment of taken under have Bhonde Krishna Rajkumar Mr. I, Sir, NumberRegistration MahaRERA Ref: Realty." Seher "M/s. developed by being area sq.mts. 3511.00 admeasuring 400612; Pin Thane- Mumbra, Sonkhar, Village 69/3 68/3, S.No, bearing Plot the situated on Awaited) (Number numberRegistration MahaRERA having Residency" Mawadah Alas" Known to6" Building 1No, the"Developmentof Incurred for Cost Certificate of Subject: 400612 Thane- Mumbra, village, Sonkhar Road, Mittal Hospital, TMC Near 69/3, No.Survey Realty, Seher M/s. To, 30-09-2024 Date: CERTIFICATE ENGINEER'S FORM-2 SSCONSengineers structural Consulting estimated and underentireDeveloper, of the the being project The TMC Completion Cost for from Cost. developer, aforesaid is project B). of the project from aforesaid Totalcompleted building(s) and EstimatedBuilding(s) Our for by A Certificate asProject the quantity project. Certificate/ appointed estimated Table B). by for the be Total and made the to the of below: aforesaid the us and of of of A building(s) The for (Total Table of to itemsSurveyor Occupation inputs required amount worksCompletion available Building(s) whose the jurisdiction certificate B B), and of other and Nil Allied of the Schedule works of Total for A quantity the Rs. base Table obtain made and A completion and / ( work the of Tableallied at the Certificate 17,27,72,975/- completion calculated MEP alliedin to of the as labour Drawings/plans on given works, completion and Siddiqui of and calculated Total Civil, and material, / under Planning Authority MEP certificate Occupation as Consultants is MEP is Allied of ( date the Rs. certificate Ali Cost 17,27,72,975/- Civil, is of the Wajidof us. till Incurred Completion at Civil, and the Estimated occupation estimated of cost by Incurred obtain cost MEP on and the the this Mr. the out basedDevcloper to Cost of of the Civil, catried reference by of TotalRs. Cost of to is Cost date estimated are assumption obtaining Estimatedcost project Authority) calculated as Bstimated the the the calculations itispection TMC the being the reference estimate with implemented. Balance that on of subject have Certificate,by of of (planningcertify Completed referencc as the is purpose The amount The We work thesite We underproject and the I cost 4. 5. 6. 2. 3. /Rs. 5,62,93,691 /Rs. 5,62,93,691 3,37,44,289 /Rs. Rs.3,37,44,289/ Amounts Amounts (3) NIL NIL NIL NIL Nil NiI (3) 20/06/2024 is Items is Items Registration ) Registration ) cost the cost the Additional/Extra building /Extra Particulars building in Particulars in 30/09/2024 estimated included 30/09/2024 cost ) estimated Estimated included A) ) A) cost Additional Incurred Incurred (2) the Cost) (Annexure the Estimated(Annexure 2) Cost) Percentage 1) (2) of Percentage No. of ofdate Estimated No. of date not cost the Estitmätednot cost on the Building on be 30/09/2024 30/09/2024 Building 30/09/2024 of be Estimatedas 30/09/2024 to on Cost Estimatedas of Percentage (as to on Cost incurred Incurred incurred in Percentage (based onthe Cost Incurred the in Cost done on (Based Estimated (For on done on Estimated (For Balance Balance (Based Totalon Cost (bascd Work on Cost Totalon Cost Work Coston A as as A as (as as TABLE TABLE Sr. No No Sr. (1) (1) 2 3 5 2 3 4 5 3,37,44,289 /Rs. Rs.3,37,44,289/ 3,37,44,289 /Rs. 3,37,44,289/ Rs. Amounts Amounts (3) Nil NIL Nil NIL NiI (3) Nil Items Items is is the Registration ) the Registration ) cost cost /Extra Particulars building /Extra Particulars building in in 30/09/2024 estimated included 30/09/2024 estimated included ) ) cost cost Incurred Additional IncurredAdditional 3) (2) the PercentageCost) 4) (2) the Percentage Cost) of Estimated No. of of Estimated No. of date not cost the Estimäted not Building cost date on the Estimated Building on be 30/09/2024 Estimatedas be of to on 30/09/2024 30/09/2024 Estimated as of to on 30/09/2024 the in Percentage incurred Cost Incurred the in Percentage incurred Cost Incurred (For on done on (For on done on Balance (Based (based Balance (Based (based Work Total on Cost Work Coston Totalon Cost Coston A (as A (as TABLE as as TABLE as as No Sr. Sr. No (1) (1) 2 3 4 5 1 2 3 4 5 1 48,20,622 /Rs. Rs.48,20,622/ 48,10,357 /Rs. Rs.48,10,357/ Amounts Amounts (3) Nil NIL NIL (3) NIL NIL NIL Items is Items is Registration ) the Registration )cost the building cost /Extra building /Extra Particulars in Particulars in 30/09/2024 estimated included 30/09/2024 estimated included ) ) ost Additional cost Additional Incurred 5) (2) the of Incurred PercentageCost) 6) (2) the of PercentageCost) Estimatd No. of Estimated No: of date date the Estimäted not cost the Estimatednot Building cost on Building on be 30/09/2024 of be on 30/09/2024 30/09/2024 as of to on 30/09/20244 Estimatedas Estimated to Percentage th» in Percentage incurred Cost Incurred the in Cost Incurred incurred on done on (For on done on (For Work Balance (based (Basedon Totalon Cost Work Balance (based (Based Cost on Total on Cost Cost A A as (as as (as as TABLE as TABLE Sr. No Sr. No (1) (1) 2 3 4 5 1 2 3 4 TMCB/R/2024/APL/00325.) Rajkutar K.Bhonde 1Rs. 56,15,438 56,15,438 /Rs. Yours Faithfully, Amounts (3) NIL NIL NIL : No. (Regn. External and andamenities 30/09/2024 Items estimated cost). the /Extra ParticularsInternal including30/09/2024 in Engineers cost). A). included on Cost).Additional(Annexure Incurred (2) the as Percentage Estimated ) of layout is Structural SEHEA REALTY FOR PARTNERS Date- Project cost Works Registration on the be Estimated not TMCB/RI2024APLO0325 No. BC by: 3u\os\2924 Realty Estimated as of to on 30/09/2024 Facilities in the in Percentage Incurred Cost CAnsltingBhonde Accepted Promoter the Developmentincurred the Cost Seher done on Estimated For on of (based Balance Work (Based K. M/s. B( Total dateCost Cost on and ofSignature (as as For$CONS Raikuar TABLE Agreed Name: Sr. No. (1) R. 2 3 4 5 Note: 1. The scope of work is to complete entire Real Estate Project as per drawings approved from time to time so as to obtain Occupation Certificate/Completion Certificate. 2. () Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor, whose certificate of quantity calculated can be relied upon by the Engineer. In case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (") and in case quantity are beirng calculated by office of Engineer, the name of the person in the office of Engineer, who is responsible for the quantilty calculated should be mentioned at the place marked (). 3. (**) Balance Cost to be incurred (4) may vary from Difference between Total estimated Cost (1) and Actual Cost incurred (2) due to deviation in quantity required/estimation of cost etc. 4. As this is an estimated cost, any deviation in quantity required for development of the Real Estate Project will result in amendmernt of the cost incurred/to be incurred 5. All components of work with specifications are indicative and not exhaustive. 6. Please specify if there are any deviations/qualifications. Example: Any deviations in input material used from specifications in agreement of sale. Table C List of Extra/Additional/ Deleted Items considered in Cost (which were not part of the original Estimate of Total Cost) Sr. No. List of Extra/ Additional / Deleted Items Amount (In Rs,) 1. 2.