Drawing Sheet No.: 01/08 Owner Details Owner Name Postal Address Contact Number Mohan Sky Ville,Flat M/S SQYLINES no-402,4th 8149549222 BUILDERS LLP Floor,,Kalyan,Thane, Maharashtra-421301 M/s Sqylines Builders Llp,SMT Aanusaya Mohan Bhoir And Others And Mr Sharad Waman Karbhari And Others P.O.A KALYAN M/S Sqylines Builders LLP Partner Trust Through Mr Mohan H Tharwani And Mokshay P Sadhwani, Reserved for Stamps of Approval plan 26.93 Garden land to be handed over to KDMC 70% (2168.0sm) = 1517.60sm +496.0(For Access Road in gardenReservation) = 2013.60sm. .62 21 M C 36 o KD . 07 49 No 6.0 DT . K sm 8 OWC PLANT ROOM FOR .3 WING-A, CAP-190 kg/day 13 AREA-17.6 SQM . 0 DM Ex 5/ C ch 6.00 4 PA NE 09 /E a L ar G HT AR EA RM U SH UT R TE /2 S ng 10 N IN G 0 TIO TR 0 K LL RO -1 VA de SU BSLT TA IO N 02 TA e n EW AT IV AY ST DR M B O SU 6.00 M 10 HT FR R UT 4. TE are M 00 50 M AL TE SH KV +7 IC .W. DR -1 A = IN G Re TR T L VE LE L EC TR RO LL s EL IVE W 12 A FP RE /M a H S6 .9 REQUIRED R.G. ST CK A -2 G SH TE UT R LA XA TIO Y H. 5 G G -39 FP -1 RO LL IN N 8. AREA =636.00 SQ.M -4 UK a .0 Flu 8.6 ST 0 No sh W Ca .Ta F ate p-1 nk 9m 69 AC K A/ ndo S6 S x G . H. To ree r D 14 - A TA G G -37 6.0 G -15 -4 6 0 l D a th um in CKMH ta Bo ep C W D' G 0M 1/ 1 TOTAL GARDEN LAND HANDED OVER TO KDMC H. No 0.8 SU 00 CT -1 STH AC ep rd-0 -5 th .3 .0M -5 0 g -3 8 M H G S G -44 -45 G G -15 -1 0 51 =5 2.1 3 N o CT x0.6 IO 0 N 0D M K G .3 m M G -46 S7 5 -4 S9 ST AC ST AC 4M D.G 91 ve ( 2 PIT E (T PTH G -35 -3 K K UP 7 .1 .1/6 0x 3.9 S6 yp .) ST M AHC 6 S6 AC 2. .T 8' 52 OI- 3" x1 2 AREA =2014.00 SQ.M /8 C X4' .3 K MH MH K 6" 8 6. r t G S1 ST E' 9'13.0 .W CO L 0" 0 x .C G -33 -3 S5 G G -48 O X 3.0 . 9'1 0 METER ROOM-2 TO MM IL ER SIN S2 4 -4 0" ETS C G lush.T BA IA S6 S4 9 0x 0.80 DU H L 3.2 OF S4 C T M AS G F-re2Wa9teCap-1 ank - H S3 SU 0x CK CT W O/F CT 0.60 IO 0 10 7 T - '9 X 1 15 -1 ST N PI DEPT - T3o e B r De 40 A W ST A 2. .T "x .4 ST 0tal D oard pth Cum in AC ep -0 -5.0 g K S5 S3 AY G G -50 -5 4.79 T( Do Ty H p.) M H DU CT C 7' 13 OI- 0" x1 1 X3' .2 11 0 " 4'1 8 0" S 3.2 HO 10 7 P - '9 X 4 15 ACMH th .3 G S1 1 H M 26 mes "x 14 .50 K F -5 0m M .3 G -31 M S2 F' W ST AC K + 8 C tic T 0.3 UM a 00 - nk DU L 2.7 OF 9'0 5 X T - '9 " -3 m HT - B CT H M "x 1.4 14 S8 MH R W C .W ST 2 H M VE O/ F fre - W e 4.2 IN bo 0 G ard M M H 4'1 8 0" S 2.7 HO Fre ate ap-7 .H T A 9'0 5 X P - To e r D 7 C an K C RI H M 2 .C L 2.4 OF "x 4.5 14 G ta Bo ep u k G 8'2.50 . 1 8'2 8 X T - 14 '9 0 AC K G -27 l D ard th m ep -0 -5.0 S1 G -52 -5 "x X0.7 &2 L 3.0 OF "x 1.4 13 " -2 2'6 5 S9 ST 8 th .3 M -5 0m .3 MH S1 2 .D S2 S3 3 4. SU 790x CKCT 0.80 30 Fir M H G " 10 5 X T - '0 2 12 "x .4 4'1 8 0" S 2.4 HO Nala M ST IO N 0x 8'0 3 46 S6 MH S8 A S1 PIT( 0.600 + 0C eW " 8'2 8 X P - STACK STACK STACK STACK STACK STACK G-144 STACK STACK STACK STACK STACK STACK STACK STACK FIL TE G-1 47 G-1 MH S1 0 S1 3 CH 250 AN MM NE .W S4 G G -54 -55 M H S7 S9 0 Typ. DEPT ) H 0.3 UM a 00 - ter m HT Ta fre - nk e 4.2 O/F M H DU CT "x 4 13 14 .5 '9 0 " G-145 6.00 M.W. DRIVE WAY L (SL WI G-1 G-3 G-5 G-7 G-9 G-11 G-13 G-15 G-17 G-19 G-21 G-23 G-25 R UN IT S1 4 S1 1 M DE OP DR E-1 AIN :20 0) S1 0 ST AC K S4 bo 0 ard M M H CT DU -2 L 2.1 OF S 3.0 HO 10 5 P - '0 X 7 12 "x .3 0 FIR G 6'1 0 X T - 24 7 UP 12.00 80 4. E. G-2 G-4 G-6 G-8 G-10 G-12 G-14 G-16 G-18 G-20 G-22 G-24 G-26 F NE SU MM MP Ø VE DE E G -56 SU 890x EL 1"x 1.9 11 '2 " S8 12 LUS 2. PU 5 X 6. DR RT AIN IC 0 PIP AL E SU 1.0 MP PT PU H MP :-5 R .1 O 00 O -5 7 1C0 S8 S7 S5 H M CT 0. IO 800x N PI 0.60 T( Ty 0 DE 6'4 2 " S 2.1 HO + CU .T 0(W PIT M M K p.) PT -2 L 6'1 0 P - )x0 -1. ST S9 2.7 OF 1"x X 5 11 0.3 M an IN M 2. .1. 00(L) 20 ET SA M H FD ER G T 19 .84 ON ST P RO5 M 0(H H )M 9'0 5 X - 1 S3 00 - k - M '2 CE AL CU G -58 S3 DU "x 1.9 0 6'4 2 " S1 m HT CO THELATI OM EQTOUT -5 CT " fre - M IN ON UI FO 9 NE MM L (SL WI S 2.7 HO ASC1 DE F OP DR O/ H e 2.0 M ST AN PM 9'0 5 X P - E-1 AIN M 10 K0 :20 25 S2 bo 0 ER ALLA D BE ENTR OM TO ST AN 0) Do O/F "x 5 10 CH 250 19 .8 X8 EX UT FO G 13 me '2 4 ard M C TI FI G -60 HA S9 s " PU 00 ON LL US R T -6 + 7 C tic H 2.5 LO MP MM IA IS ED 1 S8 0.3 UM Ta F' F S7 00 - nk 8'5 7 X T - L H DO AC "x 1.4 9 RO CU m HT - A M 3.0 LO S4 S5 K fre - W F 4'9 6 ST e 4.5 IN DR 10 5 X T - " S6 bo 0 G IV '0 2 8 "x .4 ST S6 ard M2.4 RO E 8'0 3 2.5SHO D' AIR 8'2 8 x O R'S " 8'5 7 X P - "X 2.4 M S3 CA "x 4.4 9 G-84 G-82 G-80 S5 TO FIRE UT SE 8'0 4 M " CT 14 5 '7 " G-85 G-83 G-81 FO WING-A 0x PI R H DU 0.8 PE 3.0 LOF CU M SU 00 MM O/ F M CT x0.4 50 10 5 X T - S 3 O 7' 13 O '0 3.0 HO "x 2.4 7 H 10 .27 OF C. X3 0" x1 I IO 50 2. C.T 00 X3' .2 N 8'0 3 10 5 P '9 x F. 15 S PIT DE RO "X 3 11 0 " '0 X 7 - 8 "x .3 STACK STACK STACK P (T TH OM 12 .65 " 24 8 G-152 UPyp '0 '2 .) EN E' " IN CCT " M43.71=M00.6 x m98.2 NOITAXALER a G-153 1.5 x0 TR C nk TE V .800 Y FR 0.3 USMT - C RC & CT 00 -AH om O UP G-78 G-76 G-74 G-72 G-70 G-68 G-62 Do SUCT x0.6 OM m IR T m M DU S ST D 3.0 HO G-66 G-64 fre -C4 erc G-79 G-77 G-75 G-73 G-71 G-69 G-63 m ION 00 DE AI U 2.3 LIF e A.5S ial 10 5 P UP STACK MP R C 7'9 6 X T-5 '0 X 7 - 7 es bo 0E "x .3 G-67 G-65 PU 2.1 LIF PI tic T(Ty PTH 1.50 20 T ard M "x 1.9 6'5 7 2.5 LOF 24 8 '2 " 1.2 L.V 7'1 5 X T-2 p.) " + UP T 3'1 0X .D 8'5 7 X T - "x 2.7 1"x 1.3 "x 1 6 2.89 STACK STACK STACK 9'0 5 4'7 9 4'1 .4 2.75 x 1.34 " " 0" 7 SOC. STACK 2.7 LOF S 6.00 M.W. DRIVE WAY OFF. CT 2.5 HO METER 2.57 x 3.79 8'5"X12'5" UP DU 9'0 5 X T - "x 1.9 5 6'4 2 8'5 7 X P - "x 4.4 6 14 6 H CLUB HOUSE ROOM 4.05 x 2.45 LV ROOM 2.45 x 3.49 8'0"X11'5" WING-A ENTRANCE D.G. UNIT FIRE TOWER ET ROER O -1 1.8 2 M .W ID E 2.1 LO F " S 2.7 HO 9'0 5 X P - "x 5.8 5 19 4 '7 " .N o LOBBY LOBBY 2.65 x 3.67 M 6'1 0 X T - '2 4.40 x 2.90 M AG 1"x 1.9 4 " 8'8"X12'1" 14'5"X9'6" 8.05 x 5.41 26'5"X17'9" E 6'4 2 .1 3. DUCT LIFT-1 LIFT-3 LIFT-4 SS 2.9 LOF " DUCT DUCT 2.15 X 2.45 2.15 X 2.45 2.15 X 2.45 PA 9'6 0 X T - S 2.1 HO DUCT "x 2.4 3 /1 2.00 M.W. DRIVE WAY 3.44 x 3.07 RAMP UP 7'1"x8'0" 7'1"x8'0" 7'1"x8'0" 8'0 3 6'1 0 P DUCT " 1"x X 5 - 4 19 .84 '2 00 DUCT DUCT " LIFT S TO 1ST 2.15 x 2.44 2.9 HO 7'1"X8'0" PASSAGE 2.30 M. WIDE CT 9'6 0 X P - PASSAGE 1.52 M. WIDE DU 2.4 LO "x 7 3 F 24 .3 8'0 5 X T - '2 7 " "x 1.8 2 6'1 6 " PODIUM F.D. F.D.-1 G.C. 1&2 1.20X1.39 DUCT DUCT 3'11"x3'11" UP 2.50X1.39 3'11"x4'7" DUCT 1.20X1.20 S LIFT-1 LIFT-2 8'2"x4'7" DUCT 2.4 HO 2.15 x 2.45 2.15 x 2.45 30 8'0 5 X P - UP Dead Wall 7'1"X8'0" 7'1"X8'0" 1 2.7 LOF "x 5.6 2 DUCT DUCT 18 5 28 DUCT 9'0 5 X T - '7 " H. S.N "x 1.8 1 R UP 26 3 5 C.TOI. 1.20X1.83 WING-B 6'1 6 " G es. 3'11"x6'0" 24 ENTRANCE 6.00 30 FIRE 2.7 SHO 7 LOBBY TOWER 9'0 5 X P - No o. 28 1 LIFT-3 2.75 x 2.15 DUCT 22 9 STACK STACK 5.24 x 6.07 17'2"X19'11" STACK "x 5.6 1 18 5 RELAXATION MARGIN STATEMENT (A-Wing) 3 20 '7 . 3 ar 95 26 5 9'0"X7'1" 18 11 O.W.C. STACK " 6( 4 24 13 3.00 x 3.00 de 22 7 9 1 3 5 7 9 11 13 15 16 15 9'10" X 9'10" G106 G108 G109 G110 G111 G112 G113 G114 WATCH P) n 20 11 STAIRCASE G115 CABIN STAIRCASE 18 UP 13 G107 16 13.67 15 30 28 26 24 22 20 18 16 DRIVER'S DUCT ROOM STAIRCASE 2.75 x 2.14 9'0"X7'0" UP REQUIRED DEFICIT 6. SINGLE SINGLE STACK STACK STACK STACK STACK STACK STACK STACK STACK G102 STACK G104 WING-B P.S. (94) MARGIN REQUIRED PROVIDED Relaxation IN mt 6.00 0 G-154 G-155 G-86 G-87 G-88 G-89 G-90 G-91 G-92 G-93 G-94 G-95 G-96 G-97 G-98 G-99 G100 G101 G103 G105 .M 6.00 M.W. DRIVE WAY .W EAST 12.00m. 12.00m. Nil Nil 12.00 SW RELAXATION 13.67 x 6.00M=82.02M . 6.00 M.W. DRIVE WAY S W Ex is DOMESTIC & FLUSHING P. WEST 12.00m. 12.00m. Nil. Nil ti UG TANK FOR S. Re 15 SE NW .0 ng G142 G143 G140 G141 G138 G139 G136 G137 G134 G135 G132 G133 G130 G131 G128 G129 G126 G127 G124 G125 G122 G123 G120 G121 G118 G119 G116 G117 COMMERCIAL USE .9 s M Ro NORTH Nil Nil. Nil. .W STACK STACK STACK STACK STACK STACK STACK STACK STACK STACK STACK STACK STACK STACK 4 Bld. Joint .D ad P. . 15 .0 WING-C E NE N R M SOUTH 12.00m. 6.00m. 6.00m. 17.34m oa d FLUSHING & RAIN WATER DOMESTIC & FIRE FIGHTING .W 4.00 MHADA .D HARVESTING TANK FOR WATER UG TANK TANK FOR .P WING-A&B WING-A&B .R DUCT oa 2 1/ H d TOI. .N . No 1.71X1.22 SOC.OFFICE 2.77 X 3.02 o H. .1 /2 RELAXATION MARGIN STATEMENT (B-Wing) LIFT 1.82 x 1.82 W.B. REQUIRED DEFICIT MARGIN REQUIRED PROVIDED UP ENTRANCE LOBBY Relaxation IN mt 2.75 X 4.27 STAIRCASE SITE UNDER REFERENCE 4.00 AREA STATEMENT Sq.Mt. METER RM. 2.75 X 2.75 EAST Bld. Joint Nil Nil Nil Zo R. 1. Area of plot (Minimum area of a, b, c to be considered) n WEST 6.00m. 90 CWC 87 4.00 e 12.00m. 6.00 52.14m (a) As per ownership document (7/12, CTS extract) 10,820.00 MM Proforma I : Area Statement 91 PG 3.00 NORTH 1. Area of plot (Minimum area of a, b, c to be ------- . 92 MT 12.00m 6.00m 6.00 82.02m (b) as per measurement sheet VM DISP& 93 15 . 3.22 considered) or area of subplot with sanctioned layout No. 10743.000 MT MARUTI MH 94 and subplot No. DHAM T. PO PS R-Zone 15 SOUTH 12.00m. 12.00m. Nil. Nil. (c) as per site 10,743.00 (a) As per ownership document (7/12, CTS extract) M 15 M 100 10820.000 15 T. PS 2. Deductions for (b) as per TILR or City Survey measurement sheet 10820.000 . EP-3 15 M (c) as per Demarcated drawing area 11202.341 M-9/3 EP-4 T MT . Form of Statement 3 30 AGRAWAL (a) Proposed D.P./ D.P. Road widening Area.(15.00 M.W.) 522.00 LESS 97 96 95 G T. EX . EP-11 COLLEGE [Sr. No.9 (g)] 2.Area not in possession 0.000 15 M R 1695.00 SITE PLAN 24 M T. SWP HS LODHA O AD Area details of Apartment (b) D.P. Reservation of (School) P.S. 94. Area 3. Entire area (1-2) 10743.000 'R' HERITAGE 20 98 24 M 24 MT. M-36/3 m t. 4.Deductions for - PS T. EP-11 112 EXTN.TO Apartment Carpet area of Area of Balcony Area of Double (c) D.P. Reservation of (Garden)G-95 2168.00 (a) Proposed D.P./ D.P. Road widening Area /Service 15MT. 522.000 PS SHREE COMPLEX M-8/3 R ZONE 24 M T. PS SC.1:500 Building No. Floor No. No. apartment attached to height terraces Road / Highway widening EP-3 M T. Apartment attached to flat (d) D.P. Reservation of Any ------ (b) Any D.P. Reservation area 3863.000 15 MT 15 . CARPET AREA STATEMENT(WING-A) (c) Green Belt 0.000 15M T. M-38/3 (TYP.6/11/16/21/26 Refuge Floor) (1) (2) (3) (4) (5) (6) (Total a+b+c+d) T. 4385.00 Total (a+b+c) 4385.000 M Wing-A 5.Balance area of plot (3-4) 6358.000 FLAT No. RERA CARPET BAL. AREA 31 957.07sm ----- 30 183 9647.31sm. T. 3. Balance area of plot (1-2) 6358.00 6. Amenity Space 0.000 15 M C-1 ZONE EP-1 . Sq.Mt. Sq.Mt. Wing-B 6850.81sm. (Applicable if (1) > 20000 sqmt 12MT 15 141 694.88sm ----- - 30 M T. GANPATI 1 ---- ---- Wing-C 7 1023.12sm. 4. Amenity Space (if applicable) (Required -(a) Upto 20000 sqmt - Nil - 99 28 64.75sm ----- (b) Above 20000 sqmt - (a) + 5 % of Total area 0.000 CHOWK 30 MT HEENA SITE (a) Required - 5% (more than 20,000) Nil. KDMC MAYOR RESI. M T. NIKKI PARK . 30 MT GARDEN M-18/3 2 91.16 5.59 7. Net Plot Area (5-6 ) 6358.000 24 . 8. Recreational Open Space - 113 120 3 37.78 3.05 (b) Adjustment of 2(b), if any - ------ (a) If area (6) is more than 4000 sqmt - 10 % of (6) is 635.800 required. (c) Balance Proposed - Nil. 4 52.39 5.83 Proposed___ 635.997 LOCATION PLAN 5 52.46 5.83 Form of Statement 2 [Sr. No.9 (a) ] 5. Net Plot Area (3 - 4 (c)) 6358.00 (b) If area is less than 4000 sqmt -Check - i) If it is full number like 1,2,125,419,etc. As per 7.12 abstract or City Survey Number - No Recreational open - - 6 52.44 5.83 Proposed Building 5.a) Add for FSI as per Accomodation Reservation policy (2c) 2168.00 space is required ii) If it is subdivision like 1/2 ,2/5 , 125/1 419/1 etc.then 7 53.18 5.83 b) Consider Area For Basic FSI (5+5a) 8526.00 recreational open space is required. - Total Built-up Area (A) 10 % Subject to minimum 200 sqmt Building No. Floor No. 0.000 of floor,as per outer 6. Recreational Open space (if applicable) Proposed ______________ 635.997 AP construction line. (B) Exemption to leave open space subject to availing A AP BALC. 2.57 X 1.00 AP (a) Required - 10% (5)(Physical) 635.80 basic F.S.I of 75 % (C) Exemption to leave open space subject to payment - BALC. BALC. 2.57 X 1.00 (1) (2) (3) (b) Proposed 635.80 of 10 % land value of land at (7) as per annual - 2.50 X 1.00 AP statement of rate. Wing-A 31 15,009.28sm. 7. Internal Road area N.A AP KIT BED KIT Certificate of Area: 2.45 X 2.60 2.75 X 3.45 2.57 X 2.45 KIT BED Wing-B 15 10,522.42sm. 8. Plotable area (if applicable) N.A Certified that the plot under reference was surveyed by me on 2.57 X 2.45 2.75 X 3.45 DUCT KIT 2025-08-01 and the dimensions of sides etc. of plot stated onplan are BALC. 2.50 X 2.91 M.BED BALC. BALC. BALC. 9. Built up area with reference to Basic F.S.I. as per front road width 1.10% (Sr.No.5b xbasic FSI) 9378.60 2.96 X 1.00 2.75 X 2.91 LOFT ABOVE 2.90 X 1.00 AP LOFT ABOVE 3.05 X 1.00 3.05 X 1.00 TOTAL = 25,531.70sm. (8526.00 x 1.10) as measured on site and the area so worked out tallies with the area M.BED - 1 BED stated in document of Ownership/ T.P. Scheme Records/Land 3.26 X 3.20 LOFT ABOVE AP 10. Addition of FSI on payment of premium Records Department/City Survey records. 2.75 X 3.20 LOFT ABOVE PASS. 0.91 M.W. PASS. 0.91 M.W. Signature AT.TOI. C.B. UTILITY PASS. 0.91 M.W. (a) Maximum permissible premium FSI - based on road width /TOD Zone.(0.50x1c) 5371.50 (Name of Architect/ Licensed Engineer/ Supervisor.) 1.20X2.13 1.15 X 0.60 1.91 X 0.60 M.BED 1.12 X 0.60 (10,743 x 0.50) Owner's Declaration - AT.TOI. 3.65 X 2.90 1.83X1.20 C.TOI. AT.TOI. C.TOI. UTILITY 1.12 X 0.60 M.BED (b) Proposed FSI on payment of premium. 2417.17 I/We undersigned hereby confirm that I/We would abide by plans 1.20X1.83 LIVING 1.20X1.83 1.20X1.83 LIVING LIVING 3.65 X 2.90 approved by Authority / Collector. I/We would execute the structure 2.90 X 4.43 3.05 X 4.43 3.05 X 4.43 C.TOI. AT.TOI. 1.50 PASS. 0.91 M.W. DUCT 1.20X1.83 1.20X1.83 11. In-situ FSI / TDR loading (10,743 x 0.90) = 9668.70sm. as per approved plans. Also I/We would execute the work under DUCT supervision of proper technical person so as to ensure the quality UTILITY E.D. DUCT M.BED - 2 1.16 X 0.60 LIVING (a)In-situ area against D.P. road [2.00 x Sr. No. 2 (a)], if any 1044.00 and safety at the work site. 1.94X2.77 AP 1.38 3.65 X 2.89 2.96 X 6.09 DUCT 1 AT.TOI. C.TOI. L.V.D (i) In-situ area against P.S.-94 Reservation (2.00 x Sr. No. 2(b)) 3390.00 Adjoining B-Wing 1.20X2.13 1.20X2.13 1.20X1.39 Owner (s) name and signature DUCT DUCT 3 (ii) Proposed T.D.R. Area. NIL. Architect/ Licensed Engineer/ Supervisor name and signature 4 5 2.65 FRD FRD (b)In-situ area against Amenity Space if handed over [2.00 or1.85 x Sr. No. 4 (b)and /or(c)], ------ Job No. DUCT 2.30 PASS. 1.52 M.W. DUCT 4 (c) T.D.R. From Market ----- 2 4.16 1.35 4434.00 FRD FRD FRD FRD (d) Total in-situ / TDR loading (a+b+c) 7 6 4.55 3.95 0.31 1.00 Postal Address : Mohan Sky Ville,Flat no-402,4th DUCT G.C. 1&2 F.D. 2 3 6 12. Additional FSI area under Chapter No. 7 N.A 1.50 C.TOI. 1.00X1.39 DUCT Floor,,Kalyan,Thane,Maharashtra-421301,KALYAN 1.20X1.83 UP 2.50X1.39 2.43 DUCT LIFT-1 LIFT-2 5 13. Total entitlement of FSI in the proposal BED 2.15 x 2.45 2.15 x 2.45 4.16 X 3.05 1 19 DUCT LIVING LIVING C.TOI. 1.20X1.83 AT.TOI. 1.20X1.83 1.65 (a) [9 + 10(b)+11(d)] or 12 whichever is applicable. 16,229.77 DESCRIPTION OF PROJECT : 3 17 AT.TOI. DUCT C.TOI. 3.05 X 4.43 3.05 X 4.43 M.BED A-WING 1.52 (b) Permissible Ancillary Area FSI upto 60%Or 80% (Maximum)with payment of charges. Type of Proposal : Mixed 1.20X2.13 1.20X2.13 (REFUGE FLOOR AREA DEDUCTION) 5 151.53 M.BED UTILITY 1.12 X 0.60 3.65 X 2.90 6/11/16/21/26th Floor 16,229.77 - 268.57 = 15,961.20SM. 9791.57 BUILDING ON CTS. NO./SURVEY NO.-33 RESIDENTIAL = 15,961.20SM. x 60% =9576.72SM FIRE 3.65 X 2.90 LIFT LOBBY 7 13 UTILITY 1.12 X 0.60 PASS. 0.91 M.W. WING-A STANDARD ADDITION:- COMMERCIAL=268.57SM x 80%=214.85SM. SITE ADDRESS : LIFT-3 2.75 x 2.15 9 11 DEDUCT AREA @ 6/11/16/21/26th FLOOR 1) 1.50 x 1.38 = 2.07sm. (c) Total entitlement (a+b) 26,021.34 REFUGE AREA = 32.74 sm. DUCT PASS. 0.91 M.W. PROPOSED BUILDING ON S. No.33, STAIRCASE P-LINE AREA DIAGRAM 2) 2.30 x 3.95 = 9.08sm. 14 1.50 LOFT ABOVE AP 3) 2.65 x 4.55 = 12.05sm. FRD AP LOFT ABOVE BALC. BALC. SC.1:100 15. Total Built-up Area in proposal. (excluding area at Sr.No.17 b) 3.05 X 1.00 3.05 X 1.00 4) 1.35 x 0.31 = 0.41sm. Name Of Architect : VIJAY R PANDEY 1 3 5 7 9 KIT BED 2.57 X 2.45 5) 1.65 x 2.43 = 4.00sm. (a) Previous Approved Built-up Area. 16,247.37 LOGO ADDRESS OF OFFICE CHAJJA 1.53 FRD 2.75 X 3.45 KIT STAIRCASE BED UP 2.75 X 3.45 2.57 X 2.45 6) 4.16 x 1.00 = 4.16sm. OFFICE - AP CHAJJA TOTAL = 31.77sm. (b) Proposed Built-up Area (as per 'P-line') 9284.33 303,Raj-kamal Tower,Above Kotak Mahindra Bank,Santoshi Mata WING-A 19 17 15 13 11 BALC. 25,531.70 Road,Kalyan-(W).421301 1.52 2.57 X 1.00 (c) Total (a+b) TYP. 6/11/16/21/26th FLOOR PLAN(REFUGE) 1.50 1.50 BALC. 2.57 X 1.00 P-LINE AREA 6/11/16/21/26th FLOOR = 522.63 - 31.77 = 490.86sm. OWNERS SIGN - TECHNICAL PERSON SIGN SC.1:100 AP 16. F.S.I. Consumed [15 / 13](should not be more than serial No.14 above.) ---- Verified by applicant A AP 17. Area for Inclusive Housing, if any (As per Old Approval) ----- (a) Required (20% of Sr.No.5) SCALE - 1:100 Date: 10/09/25 1398.76 JOB NO - KDMCC-24-ENTRY-127716 CHECK BY - - (b) Proposed 1399.09 SUBMISSION DRAWING Drawing Sheet No.: 02/08 Reserved for Stamps of Approval plan UP G-78 G-76 G-74 G-72 G-70 G-68 G-79 G-77 G-75 G-73 G-71 G-69 G-66 G-64 G-67 G-65 FRD UP 2.75 x 1.34 STACK FRD SOC. STACK 6.00 M.W. DRIVE WAY OFF. 2.57 x 3.79 METER ROOM LV 4.05 x 2.45 ROOM 2.45 x 3.49 WING-A CLUB HOUSE ENTRANCE LOBBY LOBBY 4.40 x 2.90 8.05 x 5.41 DUCT DUCT DUCT 2.00 M.W. DRIVE WAY 3.44 x 3.07 RAMP UP DUCT DUCT DUCT Adjoining B-Wing LIFT TO 1ST 2.15 x 2.44 FRD FRD PASSAGE 1.52 M. WIDE WING-A FRD FRD FRD FRD SUMMARY (WING-A) PODIUM FRD G.C. 1&2 F.D. 1.50 DUCT DUCT LIFT-1 LIFT-2 UP 2.50X1.39 1.20X1.39 DUCT PROPOSED P-LINE AREA STATEMENT 2.15 x 2.45 2.15 x 2.45 30 28 1 DUCT DUCT Proposed P-Line 26 3 C.TOI. FLOOR Area UP 1.53 1.20X1.83 24 5 C.TOI. (SQ.M.) 30 FIRE 1.53 7 2.13 2 1 TOWER LIFT-3 22 1.50 GROUND (Driver Rm+Soc.office) 28 2.75 x 2.15 DUCT 9 STACK 44.75 (LOBBY)+69.51(Clubhouse stair+Lobby) 3 20 STACK A-WING (DRIVERS RM.) 26 11 5 O.W.C. STACK 01 PODIUM PARKING 24 18 3.00 x 3.00 STANDARD ADDITION:- 13 7 16 22 FRD 15 G108 G110 3.65 1) 3.65 x 2.44 = 8.90sm. 02 PODIUM PARKING 9 1 3 5 11 13 15 1.52 7 9 20 1.50 G106 G109 G111 1 2.44 2) 1.50 x 2.13 = 3.19sm. 1.52 11 1.50 03 PODIUM PARKING 18 UP TOTAL = 12.09sm. 1.53 13 G107 16 04 15 DRIVER'S 297.88(Resi.)+634.90(Club) 1.52 20 30 28 26 24 22 18 16 DUCT ROOM WING-A 1.50 STAIRCASE 3.35 x 2.14 05 257.80(Resi)+274.91(Club) 1.50 DRIVERS RM. GR.FLOOR 3.65 P-LINE AREA DIAGRAM 06 490.86 STACK STACK SC.1:100 STACK STACK STACK STACK STACK STACK STACK STACK 07 522.63 A-WING (SOC.OFFICE.) G102 G104 STANDARD ADDITION:- 08 522.63 G-86 G-88 G-90 G-92 G-94 G-96 G-98 G100 G103 G105 1) 2.87 x 4.09 = 11.73sm. 09 522.63 G-87 G-89 G-91 G-93 G-95 G-97 G-99 G101 10 522.63 2.87 490.86 11 8.05 WING-A 12 522.63 GROUND FLOOR PLAN 1 4.09 1 AP SC.1:100 13 522.63 5.56 A AP BALC. 2.57 X 1.00 AP STANDARD ADDITION:- BALC. BALC. 1) 8.05 x 5.56 = 44.75sm. 14 522.63 2.57 X 1.00 2.50 X 1.00 AP 15 522.63 AP KIT 2.45 X 2.60 BED 2.75 X 3.45 KIT 2.57 X 2.45 BED WING-A KIT KIT 2.57 X 2.45 2.75 X 3.45 SOC. OFFICE GR.FLOOR 16 490.86 DUCT BALC. 2.96 X 1.00 2.50 X 2.91 M.BED LOFT ABOVE BALC. 2.90 X 1.00 BALC. 3.05 X 1.00 BALC. 3.05 X 1.00 P-LINE AREA DIAGRAM WING-A 2.75 X 2.91 AP LOFT ABOVE SC.1:100 17 522.63 M.BED - 1 3.26 X 3.20 BED 2.75 X 3.20 LOFT ABOVE AP GR.FL. ENTRANCE LOBBY LOFT ABOVE PASS. 0.91 M.W. PASS. 0.91 M.W. P-LINE AREA DIAGRAM 18 522.63 BUILT UP AREA CALCULATION AT.TOI. C.B. UTILITY PASS. 0.91 M.W. SC.1:100 1.20X2.13 1.15 X 0.60 1.91 X 0.60 AT.TOI. M.BED 1.12 X 0.60 A-Wing Typ.6th To 31st FLOOR 19 522.63 3.65 X 2.90 UTILITY M.BED 1.83X1.20 C.TOI. AT.TOI. C.TOI. 1.12 X 0.60 1.20X1.83 LIVING 1.20X1.83 1.20X1.83 LIVING LIVING C.TOI. AT.TOI. 3.65 X 2.90 4.40 20 522.63 2.90 X 4.43 3.05 X 4.43 3.05 X 4.43 PASS. 0.91 M.W. DUCT 1.20X1.83 1.20X1.83 Proforma I : Area Statement DUCT 490.86 E.D. DUCT 21 1. Area of plot (Minimum area of a, b, c to be 3.05 M.BED - 2 UTILITY LIVING 1 1.16 X 0.60 1.94X2.77 AP 3.65 X 2.89 2.96 X 6.09 considered) or area of subplot with sanctioned layout No. 10743.000 DUCT AT.TOI. C.TOI. L.V.D 22 522.63 and subplot No. Adjoining B-Wing 1.20X2.13 1.20X2.13 1.20X1.39 (a) As per ownership document (7/12, CTS extract) 10820.000 DUCT DUCT 3 4 5 23 522.63 (b) as per TILR or City Survey measurement sheet 10820.000 FRD FRD (c) as per Demarcated drawing area 1.94 11202.341 DUCT 24 522.63 LESS PASS. 1.52 M.W. DUCT 2 2.Area not in possession 0.000 FRD FRD FRD FRD 2 2.75 25 522.63 3. Entire area (1-2) 10743.000 1 7 6 4.Deductions for - F.D. 490.86 AT.TOI. DUCT C.TOI. 1.50 UP G.C. 1&2 2.50X1.39 1.00X1.39 DUCT 26 (a) Proposed D.P./ D.P. Road widening Area /Service 522.000 1.20X1.83 1.20X1.83 DUCT LIFT-1 LIFT-2 Road / Highway widening UTILITY LIVING 4.16 X 3.05 2.15 x 2.45 2.15 x 2.45 1.79 27 522.63 (b) Any D.P. Reservation area 3863.000 1.15 X 0.60 1 19 C.TOI. DUCT AT.TOI. 1.41 LIVING LIVING (c) Green Belt 0.000 1.20X1.83 1.20X1.83 3 1.52 17 AT.TOI. DUCT C.TOI. 3.05 X 4.43 3.05 X 4.43 M.BED 28 522.63 Total (a+b+c) 4385.000 1.20X2.13 1.20X2.13 3.65 X 2.90 5 151.53 M.BED UTILITY 5.Balance area of plot (3-4) 6358.000 1.12 X 0.60 FIRE 7 13 3.65 X 2.90 UTILITY 29 522.63 6. Amenity Space 0.000 LIFT LOBBY 1.12 X 0.60 (Applicable if (1) > 20000 sqmt BALC. LIFT-3 9 11 PASS. 0.91 M.W. - M.BED 3.35 X 3.65 KIT 4.16 X 1.00 2.75 x 2.15 DUCT PASS. 0.91 M.W. 30 522.63 (Required -(a) Upto 20000 sqmt - Nil - 2.50 X 2.59 STAIRCASE (b) Above 20000 sqmt - (a) + 5 % of Total area 0.000 1.50 LOFT ABOVE AP 31 522.63 7. Net Plot Area (5-6 ) FRD BALC. BALC. 6358.000 AP LOFT ABOVE 8. Recreational Open Space 8.49 3.05 X 1.00 3.05 X 1.00 - 1 3 5 7 9 KIT BED 8.34 3 4 CLUBHOUSE GR. FL. LOBBY TOTAL =15,009.28SM. (a) If area (6) is more than 4000 sqmt - 10 % of (6) is CHAJJA 2.57 X 2.45 635.800 1.53 KIT 2.75 X 3.45 STAIRCASE BED required. UP 2.75 X 3.45 2.57 X 2.45 STANDARD ADDITION:- AP CHAJJA Proposed___ 635.997 1) 4.40 x 3.05 = 13.42sm. (b) If area is less than 4000 sqmt -Check - - 19 17 15 13 11 BALC. i) If it is full number like 1,2,125,419,etc. As per 7.12 2) 1.94 x 2.75 = 5.33sm. 1.52 2.57 X 1.00 BALC. abstract or City Survey Number - No Recreational open - 1.50 2.57 X 1.00 3) 1.41 x 8.34 = 11.75sm. 1.50 space is required AP 4) 1.79 x 8.49 = 15.19sm. ii) If it is subdivision like 1/2 ,2/5 , 125/1 419/1 etc.then A WING-A AP TOTAL = 45.69sm. recreational open space is required. - (A) 10 % Subject to minimum 200 sqmt 0.000 TYP. 7/8/9/10/12/13/14/15/17/18/19/20/22/23/24/25/27/28/29/30/31st FLOOR PLAN 44.56 WING-A Proposed ______________ 635.997 SC.1:100 (B) Exemption to leave open space subject to availing - 1.50 6.61 2.96 2.80 2.75 2.75 3.05 2.10 6.25 5.77 2.25 GR.FL. CLUBHOUSE LOBBY basic F.S.I of 75 % SC.1:100 (C) Exemption to leave open space subject to payment 2.10 1.60 2.61 2.60 2.60 of 10 % land value of land at (7) as per annual - CARPET AREA STATEMENT(WING-A) 3.17 0.60 3.60 0.44 (TYP.7/8/9/10/12/13/14/15/17 0.85 4.04 statement of rate. 18/19/20/22/23/24/25/27/28/29/30/31st FLOOR) Certificate of Area: Certified that the plot under reference was surveyed by me on 2.50 2.06 1.12 2025-08-01 and the dimensions of sides etc. of plot stated onplan are 1.99 1.12 as measured on site and the area so worked out tallies with the area FLAT No. RERA CARPET BAL. AREA 1.38 3.37 1.45 7.72 stated in document of Ownership/ T.P. Scheme Records/Land Sq.Mt. Sq.Mt. 1.16 2.77 1.45 5.30 2.02 Records Department/City Survey records. 1.39 1.39 Signature 1 42.51 4.16 1.81 1.99 1.50 1.35 2.05 (Name of Architect/ Licensed Engineer/ Supervisor.) 3.98 1.52 3.71 6.47 3.71 18.34 Owner's Declaration - 2 72.82 5.75 3.58 1.10 3.65 4.07 3.20 I/We undersigned hereby confirm that I/We would abide by plans 3.05 0.91 0.92 1.39 1.12 approved by Authority / Collector. I/We would execute the structure 3 37.78 3.05 1.51 2.59 as per approved plans. Also I/We would execute the work under 3.06 1.68 1.09 supervision of proper technical person so as to ensure the quality 4 52.39 5.83 5.39 and safety at the work site. 2.39 4.16 2.25 2.10 5 52.46 5.83 6.51 4.45 6.25 Owner (s) name and signature Architect/ Licensed Engineer/ Supervisor name and signature 6.60 3.99 4.22 Job No. 3.76 2.94 Postal Address : Mohan Sky Ville,Flat no-402,4th Floor,,Kalyan,Thane,Maharashtra-421301,KALYAN 6 52.44 5.83 2.56 2.76 5.77 7 53.18 5.83 5.77 DESCRIPTION OF PROJECT : Type of Proposal : Mixed TOTAL CARPET AREA =363.58 x 21Fl.= 7635.18sm. TYP. 6th To 31st FLOOR 0.62 0.16 BUILDING ON CTS. NO./SURVEY NO.-33 TOTAL BALCONY AREA =36.28 x 21Fl.= 761.88sm. AREA DIAGRAM SC.1:200 SITE ADDRESS : PROPOSED BUILDING ON S. No.33, Name Of Architect : VIJAY R PANDEY LOGO ADDRESS OF OFFICE OFFICE - 303,Raj-kamal Tower,Above Kotak Mahindra Bank,Santoshi Mata Road,Kalyan-(W).421301 OWNERS SIGN - TECHNICAL PERSON SIGN Verified by applicant SCALE - 1:100 Date: 10/09/25 JOB NO - KDMCC-24-ENTRY-127716 CHECK BY - - SUBMISSION DRAWING Drawing Sheet 1.60 2.75 2.75 6.25 5.77 2.18 No.: 03/08 32.21 1.60 0.85 2.60 3.60 2.60 0.44 11 4.04 3.05 2.10 8.18 1.91 1.12 1.99 1.12 1.45 7.72 1.38 2.77 1.45 5.23 2.02 1.39 1.39 2.05 3.61 1.10 12.22 18.34 10 2.63 3.07 12.49 8 5.40 11.11 11.11 BUILT UP AREA CALCULATION 5th FLOOR (Residential) (A-Wing) 10.01 2.36 LAWN 8.34 4.45 1.35 1.98 7.57 9 2.94 21.44 2.32 1.25 4.56 WING-A 8.87 AP Reserved for Stamps of Approval plan 5TH FLOOR (PART RESIDENTIAL) AP 1.22 2.31 2.77 AREA DIAGRAM AP BALC. 2.57 X 1.00 BALC. SC.1:200 2.57 X 1.00 1.38 1.38 9.16 AP 1.51 3.92 2.46 KIT BED KIT 1.15 2.45 X 2.60 2.75 X 3.45 2.57 X 2.45 KIT BED HER SPA AREA 1.38 HIS SPA AREA 2.57 X 2.45 2.75 X 3.45 1.22 1.22 4.39x 3.08 5.70 x 3.08 DUCT M.BED BALC. BALC. BALC. LOFT ABOVE 2.90 X 1.00 3.05 X 1.00 3.05 X 1.00 2.75 X 2.91 AP LOFT ABOVE 10.17 LOFT ABOVE AP PASS. 0.91 M.W. PASS. 0.91 M.W. 28.09 C.B. UTILITY PASS. 0.91 M.W. 1.91 X 0.60 M.BED AT.TOI. 1.12 X 0.60 3.65 X 2.90 UTILITY M.BED LIFT LOBBY 1.83X1.20 C.TOI. AT.TOI. C.TOI. 1.12 X 0.60 4.40 x 2.87 1.22X1.83 LIVING 1.20X1.83 1.20X1.83 LIVING LIVING 3.65 X 2.90 DUST 2.90 X 4.43 3.05 X 4.43 3.05 X 4.43 C.TOI. AT.TOI. HER TOILET DUCT 12.37 BIN 1.20X1.83 1.20X1.83 DUCT 20.15 BUILT UP AREA CALCULATION WASH E.D. DUCT BASIN 1.94X2.77 DUCT L.V.D 3.53 5th FLOOR (CLUBHOUSE) A-WING TOI. TOI. 1.35 4.44 1.20X1.83 1.20X1.83 1.20X1.39 6.21 DUCT 3 4 5 LIFT 1.04 2.32 2.15 x 2.45 PASS. 1.52 M.W. DUCT 7.85 6.95 6.16 F.D. DUCT TOI. G.C. 1&2 1.20X1.39 DUCT DUCT DUCT CARPET AREA STATEMENT(WING-A) 1.20X1.83 UP 2.50X1.39 LIFT-1 LIFT-2 (5th FLOOR) 2.15 x 2.45 2.15 x 2.45 C. R. C. R. C. R. C. R. C. R. C. R. C. R. SHOWER TOI. BASIN 1 19 DUCT SHOWER 2.14X0.93 DUCT WASH TOI. FLAT No. RERA CARPET BAL. AREA 3 17 DUCT 1.20X1.83 WING-A Sq.Mt. Sq.Mt. HIS TOILET BIN DUST 5 15 HER SHOWER & HIS SHOWER & CHANGING ROOM 5TH FLOOR (PART CLUBHOUSE) FIRE LIFT LOBBY 7 13 CHANGING ROOM DN URINALS AREA DIAGRAM LIFT-3 2.75 x 2.15 DUCT 9 11 WASH BASIN WASH BASIN 22 SC.1:200 1 STAIRCASE 3 37.78 3.05 20 18 3 12 4 52.39 5.83 16 5 1 3 5 7 9 CHAJJA 12 7 STAIRCASE A-WING (CHANGING RM) 14 UP 5 52.46 5.83 CHAJJA 9 @ 5th FLOOR 12 STANDARD ADDITION:- 11 19 17 15 13 11 1) 10.45 x 1.38 = 14.42sm. A.V. ROOM 4.52 x 7.26 STAIRCASE 6 2) 11.82 x 1.81 = 21.39sm. TOTAL = 35.81Sm. 5 3 10.45 WATER BODY 4 12 1 1.38 11.82 7 2 1.81 WATER BODY SERVICE BOX 4 WING-A 2 SHOWER & CHANGING ROOM @ 5th FLOOR SHORT LINE SQUASH COURT KIDS PLAY AREA P-LINE AREA DIAGRAM 9.75 x 6.40 SC.1:100 BACK WALL 12.26 6.25 5.77 2.18 FRONT WALL 32.22 0.8 0 6 0.70 9.14 10.92 0.5 1.2 30.29 2.60 0.44 8 1.6 9 3.60 4.04 WING-A 10.16 0.98 5TH FLOOR PLAN(PART RESI. & PART CLUBHOUSE) SC.1:100 1.12 1.12 4.58 1.38 1.38 11.58 7.72 7.79 YOGA ROOM 7.72 x 6.92 1.39 14.59 2.05 18.34 1.52 4.69 10.92 3.71 6.27 1.12 2.68 1.38 BUILT UP AREA CALCULATION 4.16 1.09 4th FLOOR (Resi.) (A-Wing) 2.31 2.18 1.60 7.25 0.85 1.66 3.35 6.25 7.87 Proforma I : Area Statement 3.76 4.21 1. Area of plot (Minimum area of a, b, c to be 3.35 2.76 0.92 2.69 considered) or area of subplot with sanctioned layout No. 10743.000 5.77 and subplot No. 4.20 5.43 5.33 (a) As per ownership document (7/12, CTS extract) 10820.000 6.80 WING-A 0.61 1.22 2.31 (b) as per TILR or City Survey measurement sheet 10820.000 0.75 1.39 (c) as per Demarcated drawing area 11202.341 4TH FLOOR (PART RESIDENTIAL) 1.38 0.63 10.16 5.15 1.37 1.35 40.69 4.07 LESS 2.59 1.51 BUILT UP AREA CALCULATION AP AREA DIAGRAM 1.15 2.Area not in possession 0.000 3.21 4TH FLOOR PLAN (PART CLUBHOUSE) 3. Entire area (1-2) GYM SC.1:200 10743.000 4.59 AP BALC. 1.38 1.22 7.72 x 9.98 2.57 X 1.00 4.Deductions for - BALC. 2.57 X 1.00 6.40 (a) Proposed D.P./ D.P. Road widening Area /Service 522.000 Road / Highway widening 7.75 10.16 BED (b) Any D.P. Reservation area 3863.000 MUSIC ROOM KIT 5.70 x 4.07 2.75 X 3.45 2.57 X 2.45 BED (c) Green Belt 0.000 KIT DUCT CRÈCHE ROOM 2.57 X 2.45 2.75 X 3.45 Total (a+b+c) 4385.000 5.35 x 5.28 BALC. BALC. 5.Balance area of plot (3-4) 6358.000 3.05 X 1.00 3.05 X 1.00 1.50 AP LOFT ABOVE 6. Amenity Space 0.000 LOFT ABOVE AP (Applicable if (1) > 20000 sqmt - 5.62 (Required -(a) Upto 20000 sqmt - Nil - PASS. 0.91 M.W. (b) Above 20000 sqmt - (a) + 5 % of Total area 0.000 UTILITY PASS. 0.91 M.W. M.BED 1.12 X 0.60 7. Net Plot Area (5-6 ) 6358.000 3.57 LIFT LOBBY DORMITORY 3.65 X 2.90 UTILITY 8. Recreational Open Space AT.TOI. C.TOI. M.BED - 4.40 x 2.89 WASH TOI. 2.90 X 5.18 LIVING LIVING 1.12 X 0.60 3.65 X 2.90 78 BASIN 1.22X1.23 1.20X1.83 1.20X1.83 0. (a) If area (6) is more than 4000 sqmt - 10 % of (6) is DUST LOCKER SECTION HER TOILET 3.05 X 4.43 3.05 X 4.43 C.TOI. AT.TOI. 635.800 BIN DUCT required. 12.41 DUCT 1.20X1.83 1.20X1.83 1.07 DUCT 4. Proposed___ 635.997 10.76 WASH E.D. 55 2.45 x 2.89 1.94X2.77 (b) If area is less than 4000 sqmt -Check - - BASIN DUCT TOI. TOI. L.V.D 9. i) If it is full number like 1,2,125,419,etc. As per 7.12 Adjoining B-Wing 1.20X1.83 1.20X1.83 1.20X1.39 90 DUCT abstract or City Survey Number - No Recreational open - DUCT 4 5 space is required LIFT 4. 2 2.15 x 2.45 1.94x 2.91 FRD FRD 95 04 0. ii) If it is subdivision like 1/2 ,2/5 , 125/1 419/1 etc.then 4. 7 recreational open space is required. - DUCT 3.89 PASSAGE 1.52 M. WIDE (A) 10 % Subject to minimum 200 sqmt 0.000 DUCT DUCT FRD FRD E.D. 1.94X2.77 DUCT Proposed ______________ 635.997 0.96 DUCT FRD L.V.D (B) Exemption to leave open space subject to availing 6 WING-A 1.20X1.39 FRD DUCT DUCT DUCT - TOI. G.C. 1&2 F.D. basic F.S.I of 75 % DUCT 1.50 FRD FRD UP 2.50X1.39 1.00X1.39 (C) Exemption to leave open space subject to payment 1.20X1.83 STAIR LOBBY LIFT-1 LIFT-2 4TH FLOOR (PART CLUBHOUSE) FRD PASS. 1.52 M.W. FRD FRD FRD of 10 % land value of land at (7) as per annual - 2.15 x 2.45 2.15 x 2.45 22 DUCT statement of rate. BASIN WASH 4.31 x 4.19 20 1 LIVING C.TOI. DUCT AT.TOI. AREA DIAGRAM DUCT LIFT-1 LIFT-2 1.50 UP G.C. 1&2 2.50X1.39 F.D. 1.20X1.39 DUCT 1.20X1.83 1.20X1.83 2.15 x 2.45 2.15 x 2.45 3 AT.TOI. AT.TOI. 3.05 X 4.43 M.BED SC.1:200 DUCT Certificate of Area: BIN 18 HIS TOILET DUST UP 5 1.20X2.13 1.20X2.13 BED 3.65 X 2.90 1.53 DUCT Certified that the plot under reference was surveyed by me on GREEN ROOM UTILITY 1.52 16 3.65x 2.89 3.05 X 3.19 1.12 X 0.60 FIRE 2025-08-01 and the dimensions of sides etc. of plot stated onplan are FIRE 1.52 7 LIFT LOBBY LIFT-3 TOWER LIFT-3 2.75 x 2.15 DUCT as measured on site and the area so worked out tallies with the area 1.52 14 AT.TOI. PASS. 0.91 M.W. 1.50 2.75 x 2.15 DUCT 9 stated in document of Ownership/ T.P. Scheme Records/Land 22 12 1.12X1.83 CARPET AREA STATEMENT(WING-A) FRD Records Department/City Survey records. 1 11 (4TH FLOOR) UP 1.53 CHAJJA Signature AP CHAJJA 20 LOFT ABOVE 1.53 3 STAIRCASE 1.50 BALC. BALC. 1.50 (Name of Architect/ Licensed Engineer/ Supervisor.) 18 3.05 X 1.00 3.05 X 1.00 RERA CARPET BAL. AREA 1.50 1.52 Owner's Declaration - 1.52 5 FRD 1 3 5 KIT FLAT No. 1.52 7 9 BED 16 2.57 X 2.45 Sq.Mt. Sq.Mt. I/We undersigned hereby confirm that I/We would abide by plans 14 7 UP 5.00x 3.45 GREEN ROOM 2.75 X 3.45 WING-A approved by Authority / Collector. I/We would execute the structure STAIRCASE UP 9 11 2.57x 3.13 TERRACE FLOOR PLAN as per approved plans. Also I/We would execute the work under 12 supervision of proper technical person so as to ensure the quality 22 20 18 12 SC.1:200 1.53 16 11 14 DUCT BALC. and safety at the work site. 2.57 X 1.00 1.50 1.50 Owner (s) name and signature AP Architect/ Licensed Engineer/ Supervisor name and signature 5.47 4 52.39 5.83 Job No. 5 52.46 5.83 6 67.60 8.96 Postal Address : Mohan Sky Ville,Flat no-402,4th Floor,,Kalyan,Thane,Maharashtra-421301,KALYAN (WING-A) 4th To 31st FLOOR Table No. 8B - Parking Requirements DESCRIPTION OF PROJECT : PARTY HALL Type of Proposal : Mixed 20.90 x 10.45 Sr. Occupany Size of tenement Parking Space Required BUILDING ON CTS. NO./SURVEY NO.-33 10.61 No. Required Proposed Total No. Flat SITE ADDRESS : LAWN Car Scooter Car Scooter PROPOSED BUILDING ON S. No.33, 1 Residential For every tenement having carpet area of 1x0=0 Nil. LAWN 150sq.m. and above. Nil. 2x0=0 Nil. i) Multi - Family residential For every tenement having carpet area equal to or 6.51 05 1x5=5no 1x5=5no 5no 5no above 80sq.m. but less then 150sq.m. Name Of Architect : VIJAY R PANDEY For every two tenements with each tenement 2x75.5 LOGO ADDRESS OF OFFICE 1x75.5 having carpet area equal to or above 40sq.m. but 151 =75.5no. 151no. 75.5no. 151no. OFFICE - less then 80sq.m. 303,Raj-kamal Tower,Above Kotak For every two tenements with each tenement Mahindra Bank,Santoshi Mata 27 1x13.5 2x13.5 Road,Kalyan-(W).421301 having carpet area less than 40sq.m. but more 13.5no 27no then 30sq.m. =13.5no. =27no. OWNERS SIGN - TECHNICAL PERSON SIGN For every two tenements with each tenement Nil. 0x0 2x0 Nil. NIL. Verified by applicant having carpet area less than 30sq.m. =0 no. =0no. 5%(94.0) 5%(183) Additional 5% Visitor Parking 4.70no. 9.15no. =4.7no. =9.15no. WING-A Total Parking Required (x 0.8) 0.8x98.70 0.8x192.15 SCALE - 1:100 Date: 10/09/25 79no. 154no. 4TH FLOOR PLAN(PART RESI. & PART CLUBHOUSE) As per Table No. 8c,Page No.145. =78.96 no. =153.72no. JOB NO - KDMCC-24-ENTRY-127716 CHECK BY - - SC.1:100 SUBMISSION DRAWING Drawing Sheet No.: 04/08 Reserved for Stamps of Approval plan 9.22 O.H.W TANK 1.62 4.53 LIFT LIFT MACHINE ROOM MACHINE ROOM 2.64 1 OPEN TERRACE 0.25 2 5.55 4 2.01 0.77 3.00 1BHK 1.22 3BHK LIVING ROOM LIVING ROOM BAL. 5 3.20 3 1.05 3.00 0.12 1BHK 3BHK LIVING ROOM LIVING ROOM BAL. 3.05 6 0.77 3.00 2.71 1BHK 3.20 8 3BHK LIVING ROOM LIVING ROOM BAL. 7 1.98 0.44 0.11 3.00 G 26.96 1BHK 3BHK LIVING ROOM LIVING ROOM BAL. 9 4.76 5.96 10 3.00 0.11 3BHK 1BHK LIVING ROOM LIVING ROOM 0.77 11 3.05 3.00 REFUGE 3BHK 0.77 12 3.21 LIVING ROOM BAL. 13 3.20 O.H.W. 3.00 1BHK TANK 1.50 3BHK LIVING ROOM LIFT LIVING ROOM BAL. MACHINE 1.22 ROOM 3.00 1.86 14 3.3215 1BHK 3BHK LIVING ROOM LIVING ROOM BAL. 2.40 0.81 3.00 WING-C (MHADA) 1.05 TERRACE 3BHK 1BHK LIVING ROOM TYP.1st To 7th FLOOR PLAN LIVING ROOM BAL. P-LINE AREA DIAGRAM M.BED KIT C.TOI. LIVING SC.1:200 3.00 2.85 3BHK 1BHK LIVING ROOM LIVING ROOM 1.05M./3'5'' W. BAL. 3.00 REFUGE 7th.FL. 3BHK LIVING ROOM BAL. M.BED KIT C.TOI. LIVING 3.00 M.BED 2.85 1BHK 3.30 X 2.77 3BHK LIVING ROOM LIVING ROOM AT.TOI. BAL. 6th.FL. 3.00 1.71X1.22 3BHK 1BHK LIVING ROOM M.BED KIT C.TOI. LIVING LIVING ROOM BAL. KIT CHAJJA 3.00 2.85 1.98 X 2.55 DUCT PASS 0.91 M.W. 1BHK 3BHK LIVING ROOM LIVING ROOM 1.05M.W. BAL. BAL. 5th.FL. 3.00 C.TOI. DUCT AT.TOI. M.BED KIT C.TOI. LIVING 1.07X1.81 3BHK 1BHK M.BED LIVING ROOM LIVING ROOM W.B. 1.71X1.22 2.85 3.00 REFUGE 2.77 X 3.02 LIVING 3BHK LIVING ROOM BAL. 4th.FL. 2.75 X 4.27 LIFT WELL 22.80 3.00 A KIT M.BED KIT C.TOI. LIVING CHAJJA 1BHK 3BHK LIVING ROOM LIVING ROOM BAL. 4 1.98 X 2.55 2.85 1.82 x 1.82 PASS 0.91 M.W. 3.00 3BHK 1BHK LIFT C.TOI. DUCT LIVING ROOM LIVING ROOM BAL. 3rd.FL. W.B. 1.07X1.81 3.00 M.BED KIT C.TOI. LIVING 1BHK 3BHK LIVING ROOM LIVING ROOM BAL. 1.20 UP LIVING 2.85 PASS 1.67 M.W. 3.00 3BHK 1BHK 1.27 2.75 X 4.27 LIVING ROOM LIVING ROOM BUILT UP AREA CALCULATION 2nd.FL. STAIRCASE 3 (MHADA) TYPICAL 1st To 7th FLOOR M.BED KIT C.TOI. LIVING 3.00 REFUGE 3BHK G 9.22 X 26.96 X 1 NO = 248.57 SQ.MT. 2 LIVING ROOM LIVING BAL. DUCT 2.85 TOTAL ADDITION = 248.57 SQ.MT. X 1.20 Proforma I : Area Statement 2.75 X 4.27 3.00 TOI. 1. Area of plot (Minimum area of a, b, c to be SOC.OFFICE 1.71X1.22 3BHK 1BHK DEDUCTIONS 1 1st.FL. considered) or area of subplot with sanctioned layout No. 10743.000 2.77 X 3.02 LIVING ROOM LIVING ROOM BAL. and subplot No. LIVING 1 1.62 X 2.64 X 1 NO = 4.28 SQ.MT. (a) As per ownership document (7/12, CTS extract) 10820.000 C.TOI. 3.00 W.B. (b) as per TILR or City Survey measurement sheet DUCT 2 4.53 X 5.55 X 1 NO = 25.14 SQ.MT. 10820.000 2.75 X 4.27 1BHK PASS 0.91 M.W. 3BHK (c) as per Demarcated drawing area 1.07X1.81 11202.341 1.82 x 1.82 GR.FL. 2.85 LIVING ROOM LIVING ROOM BAL. STILT PARKING METRE ROOM 3 1.22 X 1.05 X 1 NO = 1.28 SQ.MT. LIFT LESS W.B. 4 0.25 X 2.01 X 1 NO = 0.50 SQ.MT. 2.Area not in possession 0.000 KIT 3.00 P. LVL. ENTRANCE LOBBY CHAJJA UP 3. Entire area (1-2) C.TOI. 1BHK W.B. 10743.000 3BHK 5 0.77 X 3.20 X 1 NO = 2.46 SQ.MT. PASS 0.91 M.W. LIVING ROOM 1.98 X 2.55 LIVING ROOM 4.Deductions for - 2.75 X 4.27 BAL. GR. LVL. 1.07X1.81 STAIRCASE 6 0.12 X 3.05 X 1 NO = 0.37 SQ.MT. P.C.C (a) Proposed D.P./ D.P. Road widening Area /Service 1.50 522.000 CHAJJA 3.00 RUBBLE Road / Highway widening 7 2.71 X 1.98 X 1 NO = 5.37 SQ.MT. KIT 3BHK LIVING ROOM 1BHK LIVING ROOM EARTH LIFT PIT (b) Any D.P. Reservation area 3863.000 8 0.77 X 3.20 X 1 NO = 2.46 SQ.MT. STANDARD ADDITION:- (c) Green Belt 0.000 M.BED SECTION 'A-A' 1.98 X 2.55 METER RM. Total (a+b+c) 4385.000 9 0.44 X 4.76 X 1 NO = 2.09 SQ.MT. 1) 4.57 x 3.05 = 13.93sm. 3.00 REFUGE NATURAL TERRACE 2.75 X 2.75 SC. 1:100 5.Balance area of plot (3-4) 6358.000 AT.TOI. 3BHK 10 0.11 X 5.96 X 1 NO = 0.66 SQ.MT. 2.77 X 3.02 6. Amenity Space 0.000 LIVING ROOM 1.71X1.22 4.57 CARPET AREA STATEMENT(WING-C) (Applicable if (1) > 20000 sqmt - 11 0.11 X 3.05 X 1 NO = 0.34 SQ.MT. MHADA (TYP.1st To 7th FLOOR) M.BED (Required -(a) Upto 20000 sqmt - Nil - 3.00 CHAJJA 12 0.77 X 3.21 X 1 NO = 2.47 SQ.MT. 1 3.05 (b) Above 20000 sqmt - (a) + 5 % of Total area 0.000 DUCT STAIR LOBBY 7 1.05M.W. AT.TOI. RERA CARPET BAL. AREA LIFT LOBBY 2.77 X 3.02 FLAT No. KIDS PLAY AREA 22 BAL. 7. Net Plot Area (5-6 ) 6358.000 21 13 0.77 X 3.20 X 1 NO = 2.46 SQ.MT. Sq.Mt. Sq.Mt. 20 19 18 8. Recreational Open Space - 1.71X1.22 17 16 15 14 13 14 1.22 X 1.86 X 1 NO = 2.27 SQ.MT. (a) If area (6) is more than 4000 sqmt - 10 % of (6) is 1 12 STAIR 3.30 8 9 10 11 3.30 36.71 ---- 635.800 4 5 6 7 15 3.32 X 0.81 X 1 NO = 2.69 SQ.MT. required. STAIR LOBBY 3 LIFT LOBBY 2 PARTY HALL A Proposed___ 635.997 2 1 36.71 3.17 30 29 WING-C (MHADA) 28 TOTAL DEDUCTION = 54.84 SQ.MT. Y1 WING-C (MHADA) (b) If area is less than 4000 sqmt -Check - 27 - WING-C (MHADA) 26 25 24 23 22 TYP.1st To 7th FLOOR PLAN i) If it is full number like 1,2,125,419,etc. As per 7.12 21 GR.FL. ENTRANCE LOBBY 3 20 TOTAL BUILT UP AREA [X - Y1] = 197.88 SQ.MT. X1 GROUND FLOOR PLAN 36.71 3.17 19 18 17 4.50 16 14 15 STAIR 4.50 abstract or City Survey Number - No Recreational open - SC.1:100 P-LINE AREA DIAGRAM 13 12 10 11 SC.1:200 space is required 4 9 CLUB HOUSE LIFT 4 5 6 7 8 6.00 M.W. DRIVE WAY SC.1:100 36.03 2.91 ii) If it is subdivision like 1/2 ,2/5 , 125/1 419/1 etc.then 3 - 9891 illenidrareB deT :yB nwarD LOBBY DUCT STAIR LOBBY 2 30 1 29 28 (WING-C) MHADA 1st To 7th FLOOR Table No. 8B - Parking Requirements recreational open space is required. 27 (A) 10 % Subject to minimum 200 sqmt 26 25 0.000 SUMMARY (WING-C) MHADA 24 23 22 21 20 19 18 17 Sr. Occupany Size of tenement Parking Space Required Proposed ______________ 635.997 15 STAIR 16 4.50 11 12 13 14 4.50 No. Required Proposed PROPOSED P-LINE AREA STATEMENT (B) Exemption to leave open space subject to availing - Total No. basic F.S.I of 75 % 10 9 8 7 6 CLUB HOUSE 5 Flat (C) Exemption to leave open space subject to payment LIFT Proposed P-Line 4 3 6.00 M.W. DRIVE WAY Car Scooter Car Scooter 9891 illenidrareB deT :yB nwarD LOBBY DUCT STAIR LOBBY 1 2 30 29 of 10 % land value of land at (7) as per annual - 28 27 26 25 1 Residential For every tenement having carpet area of FLOOR Area statement of rate. 24 Nil. 2x0=0 1x0=0 Nil. Nil. (SQ.M.) 23 22 21 20 19 18 i) Multi - Family 150sq.m. and above. Verified by applicant 17 16 STAIR 4.50 12 13 14 15 4.50 residential For every tenement having carpet area equal to or Nil. 1x0=0 1x0=0 Nil. Nil. GROUND 13.93 (LOBBY) Certificate of Area: Certified that the plot under reference was surveyed by me on 11 7 8 9 10 above 80sq.m. but less then 150sq.m. 2025-08-01 and the dimensions of sides etc. of plot stated onplan are 6 5 CLUB HOUSE LOBBY LIFT DUCT STAIR LOBBY 30 1 2 3 4 9891 illenidrareB deT :yB nwarD 6.00 M.W. DRIVE WAY For every two tenements with each tenement 1x0 2x0 01 197.88 as measured on site and the area so worked out tallies with the area 29 28 27 having carpet area equal to or above 40sq.m. but Nil =0no. 0no. Nil Nil 26 25 02 197.88 stated in document of Ownership/ T.P. Scheme Records/Land 24 23 less then 80sq.m. Drawing Sheet ST AC K No.: 05/08 P P- -39 ST 40 AC K P P- -37 ST 38 AC K P P- -35 P ST 36 P- -41 AC 42 K ST AC P K P- -33 P ST 34 P- -43 AC 44 DU CT K ST AC P P- -31 P K ST 32 P- -45 AC 46 K ST DU P P- -29 P AC K DU DU CT 2.82 ST 30 P- -47 CT CT AC 48 K P ST AC 2 .C 7.52 P- -27 P K 8'2.50 . 1 "x X0 &2 ST 28 P- -49 G 2'6 .75 " 11 AC K 50 ST 2.28 P AC P- -25 K DU CT 6.00 G G 2- STACK STACK STACK STACK STACK STACK STACK STACK P P-3 26 P- -51 G -44 G -15 -1 0 W P-4 52 UC 10 -4 H P-5 P-7 P-9 P-11 P-13 P-15 P-17 P-19 P-21 P-23 ST T- 2 51 EE P-6 P-8 P-10 P-12 P-14 P-16 P-18 P-20 P-22 P-24 53 AC K EL E. D 3.85 ST 5 ST LE STACK 6.00 M.W. DRIVE WAY P- 54 4.65 AC AC W CAAT R -6 P- ST F. D. 3.35 G K K BI CH T UP AC G -46 -2 K 9 N O P-1 P P- -55 -4 9 P-2 56 DU CT 7.52 7 2. .T 52 O ST x1 I-2 AC K 8 ST C .3 8 P P- -57 AC 58 K 3. O.W CO 00 ST AC 5.15 G x .C. TO MM ST K DU CT 5.99 G -48 -4 3. 00 W AS H IL ER ET C S IA Reserved for Stamps of Approval plan L P-89 P-87 P-85 P-83 P-81 P-79 AI R CA 9 ST CT BA SI L 3. OF P-91 P-90 P-88 P-86 P-84 P-82 P-80 SE 7 DU N 27 T P-92 2. AT 7'0 13X .TO AC X -1 "x 1. I. K 2. .T 1. 5 STACK STACK STACK STACK STACK STACK DU 3'1 20 1" DU CT G 13 O x1 I-1 48 S G -50 UP CT STACK 2.57 DU C .2 0 3. HO 27 P P-77 P-73 P-71 P-69 P-67 P-65 P-63 P-61 P-59 AS E DU CT 4.60 -51 CT X -1 4. 5 P-78 P-74 P-72 P-70 P-68 P-66 P-64 P-62 P-60 2. LIF ST RC 2. LIF 3 7'9 6 X T-5 "x 1. 6'5 97 6.55 7.52 6 K 50 7 9'0 5 X T-2 AI " 1. . 3'1 20X V.D 1" 1. ST L 2. OF DUCT UP P-75 STACK STACK STACK STACK STACK STACK STACK STACK "x 2. 7'1 15 " L x4 39 '7 " AC DU 75 T STACK P-76 FIRE DU CT X -1 CT 1. 4 LIFT LOBBY UP 5 48 STACK .W S CLUB HOUSE 1.15 X 0.60 3'9"x2'0" M . 2. HO LOBBY 4.40 x 2.90 DUCT PA .8 2 75 P 14'5"X9'6" SS L X -1 DUCT LIFT-1 LIFT-3 LIFT-4 .1 G 2. .C 2. OF 4. 4 DUCT UP 2.57 50 . 48 T 50 G -52 2.15 X 2.45 2.15 X 2.45 2.15 X 2.45 X0 1& E.D. 1.94X2.77 7'1"x8'0" 7'1"x8'0" 7'1"x8'0" 4.61 L X -1 6'4"x9'1" L.V.D -5 G .7 2 3. OF 1. 3 1.20X1.39 DUCT 5 05 T 48 LIFT 3'11"x4'7" DUCT DUCT 5.15 4 3 24 FRD X -1 2.15 x 2.44 7'1"X8'0" CT 5.99 AC K LE 2. 2 43 S 2. HO PASSAGE 1.52 M. WIDE DU ST R- 48 P G 17 X -1 LIFT-1 LIFT-2 UP G.C. 1&2 2.50X1.39 8'2"x4'7" F.D. 1.20X1.39 3'11"x4'7" DUCT DUCT DUCT REDUCED TO FIT PARKING DUCT F.D.-1 3'11"x3'11" 1.20X1.20 3.20 3 G -54 -5 HE TO CT 4. 3 50 2.15 x 2.45 7'1"X8'0" 2.15 x 2.45 7'1"X8'0" 30 28 1 DUCT DUCT DUCT 7.52 5 AC 2- E DU S 3. HO 3 26 UP 5 DUCT 2 K W 05 P FIRE 24 ST L X -1 30 1 TOWER LIFT-3 22 7 2. OF 7. 2 28 10 T 26 3 2.75 x 2.15 9'0"X7'1" DUCT 20 9 G X -1 37 UP G -56 11 5 18 1. 1 24 22 7 11 13 15 16 13 15 5.50 5.80 -5 92 20 9 11 1 3 5 7 9 STAIRCASE STACK STACK 7 S STAIRCASE 18 UP K 2. HO 16 13 1 AC 10 P L X -1 15 30 28 26 24 22 20 18 16 DUCT P105 P103 ST 2- CT 2. OF 5. 1 STAIRCASE P106 P104 G W DU 75 T 84 H X -1 G -58 -5 EE LE 1. 0 92 STACK P-93 STACK 9 K R -2 S 2. HO P-94 AC 5T 75 P P101 X -1 P102 ST O 5. 0 31 WING-A& B G G -6 84 STACK P-95 DR P-96 1st & 2nd FLOOR PODIUM PARKING PLAN C -6 0 2. LOF 1 3. R IVE .4 57 T 4 SC.1:200 AC 85 O R X -9 3. LOF 1. RAMP UP K x OM 'S 05 T 46 2 STACK P-97 ST X -8 TO 2ND P-98 2. 43 S PODIUM 2. HO 57 P X -9 4. 45 STACK P-99 P-100 1.50 DU CT 3. LOF 1.52 3. O OC 2. C.T 05 T X -7 S 3. HO 1.53 27 F . 13 O 2. 05 P 15M. WIDE D.P. ROAD S x1 I 43 CT x F. .20 X -8 DU 3. 7. 38 65 G-152 UP IN CC G-153 1.50 TE TV RC & 1.50 O DU CT M G-62 1.52 2. LIF S 3. HO 05 P UP G-63 FRD 36 T X -5 1. FRD X -7 7. 38 2. LIF 15 T 97 2. LOF 1. L.V 39 X -2 1. 57 T 2. 20 . X -6 75 1.52 X D 1. 47 STACK 6.00 M.W. DRIVE WAY FRD 2. LOF S 2. HO FRD 3. E 75 T 57 P 00 .D X -5 X -6 X1 . UP 1.50 E .3 9 1. 92 4. 46 FIRE .W D.G. TOWER M ID S 2. HO UNIT RO ET M 75 P 2.65 x 3.67 O ER 1. 82 2. LOF X -5 5. M 10 T 84 E X -4 1 FRD AG 1. 2 3 LIFT-1 LIFT-3 LIFT-4 92 P.C.C 2.15 X 2.45 2.15 X 2.45 2.15 X 2.45 SS 2. LOF DUCT PA 90 T BAL. BAL. BAL. BAL. BAL. BAL. BAL. BAL. BAL. BAL. BAL. BAL. BAL. S RUBBLE X -3 2. HO 2. 10 P 43 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 EARTH X -4 5. KITCHEN KITCHEN KITCHEN KITCHEN KITCHEN KITCHEN KITCHEN KITCHEN KITCHEN KITCHEN KITCHEN KITCHEN Drawn By: Ted Berardinelli Drawn 1989By: Ted Berardinelli Drawn 1989By: Ted Berardinelli 1989 SHOP-2 FRD 84 WING-B 23-RELEEHW-2 1.20 4.50 4.50 4.50 4.50 GROUND FLOOR(SHOP) PLAN P A S S P A S S P A S S P A S S P A S S P A S S P A S S P A S S P A S S P A S S P A S S P A S S 2.25 2.25 PASSAGE 2.30 M. WIDE S SC.1:100 2. HO SUNK=0.20M. SUNK=0.20M. SUNK=0.20M. SUNK=0.20M. SUNK=0.20M. SUNK=0.20M. SUNK=0.20M. SUNK=0.20M. SUNK=0.20M. SUNK=0.20M. SUNK=0.20M. SUNK=0.20M. LOFT 90 P illenidrareB deT :yB nwarD illenidrareB deT :yB nwarD illenidrareB deT :yB nwarD 9891 9891 9891 CT C.TOI C.TOI C.TOI C.TOI C.TOI C.TOI C.TOI C.TOI C.TOI C.TOI C.TOI C.TOI X -3 DU 2. LOF 7. 37 FRD 45 T X -2 DUCT DUCT 1. 86 F.D.-1 P A S S P A S S P A S S P A S S P A S S P A S S P A S S P A S S P A S S P A S S P A S S P A S S P A S S P A S S P A S S P A S S DUCT 1.20X1.20 WING-B S 2. HO 2. LOF 2.40 STAIR STAIR STAIR STAIR STAIR STAIR STAIR STAIR STAIR STAIR STAIR STAIR STAIR 1 2 STAIR 1 2 STAIR 1 2 STAIR 1 2 SECTION C-C DUCT 75 T X -1 45 P X -2 5. UP 20 20 20 20 20 20 20 20 20 20 20 22 1 30 30 30 1. 65 SC.1:200 WING-B 30 19 19 19 19 19 19 19 19 19 19 19 21 2 29 29 29 29 86 1 1 1 1 1 1 1 1 1 1 1 3 3 3 3 18 2 18 2 18 2 18 2 18 2 18 2 18 2 18 2 18 2 18 2 18 2 20 3 28 4 28 4 28 4 28 4 O.H.W TANK 17 3 17 3 17 3 17 3 17 3 17 3 17 3 17 3 17 3 17 3 17 3 19 4 27 5 27 5 27 5 27 5 16 4 16 4 16 4 16 4 16 4 16 4 16 4 16 4 16 4 16 4 16 4 18 5 26 6 26 6 26 6 26 6 1.80 15 14 13 7 6 5 15 14 13 7 6 5 15 14 13 7 6 5 15 14 13 7 5 6 15 14 13 7 5 6 15 14 13 7 5 6 15 14 13 7 5 6 15 14 13 7 5 6 15 14 13 7 5 6 15 14 13 7 5 6 15 14 13 7 6 5 17 16 15 7 8 6 25 24 23 9 7 8 25 24 23 9 7 8 25 24 23 9 7 8 25 24 23 9 8 7 ENTRANCE 12 8 12 8 12 8 12 8 12 8 12 8 12 8 12 8 12 8 12 8 12 8 14 9 22 10 22 10 22 10 22 10 11 10 9 11 10 9 11 10 9 11 10 9 11 10 9 11 10 9 11 10 9 11 10 9 11 10 9 11 10 9 11 10 9 13 12 10 21 20 12 11 21 20 12 11 21 20 12 11 21 20 11 12 DOMESTIC WATER TANK LOBBY S 2. HO 11 19 13 19 13 19 13 19 13 75 P 18 14 17 16 15 18 14 17 16 15 18 14 17 16 15 18 17 16 15 14 FOR COMMERCIAL USE CAP :- 4.5 CUM X -1 5. C 65 LIFT WATER DEPTH :- 2.0M MACHINE 1.50 LIFT LIFT LIFT TOTAL DEPTH :- 2.25M ROOM DUCT DUCT DUCT 2.70 FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE G125 WATCH O.H.W TANK STAIR STAIR STAIR STAIR STAIR STAIR STAIR STAIR STAIR STAIR STAIR STAIR STAIR STAIR STAIR STAIR FLUSHING WATER TANK CABIN FOR COMMERCIAL USE 0.47 CAP :- 4.5 CUM 2.40 WATER DEPTH :- 2.0M TOTAL DEPTH :- 2.25M 1.80 Drawn 1989By: Ted Berardinelli Drawn 1989By: Ted Berardinelli Drawn 1989By: Ted Berardinelli 3.00 3.30 4.50 4.50 4.50 UP 1ST FLOOR PODIUM LEVEL 2ND FLOOR PODIUM LEVEL TERRACE FLOOR YAW EVIRD .W.M 00.6 YAW EVIRD .W.M 00.6 YAW EVIRD .W.M 00.6 11TH FLOOR 6TH FLOOR PLINTH LEVEL 4TH FLOOR 15TH FLOOR 14TH FLOOR 13TH FLOOR 12TH FLOOR 10TH FLOOR 9TH FLOOR 8TH FLOOR 7TH FLOOR 5TH FLOOR Proforma I : Area Statement 3RD FLOOR PODIUM LEVEL (REFUGE AREA) (REFUGE AREA) GROUND FLOOR LEVEL 1. Area of plot (Minimum area of a, b, c to be YAW EVIRD .W.M 00.6 considered) or area of subplot with sanctioned layout No. 10743.000 and subplot No. (a) As per ownership document (7/12, CTS extract) 10820.000 (COMMERCIAL) GROUND FLOOR (B-WING) Table No. 8B - Parking Requirements (b) as per TILR or City Survey measurement sheet 10820.000 Sr. Occupany Size of tenement Parking Space Required (c) as per Demarcated drawing area 11202.341 No. LESS Required Proposed 2.Area not in possession 0.000 Total 54.30 illenidrareB deT :yB nwarD 9891 Carpet 3. Entire area (1-2) 10743.000 Car Scooter Car Scooter 4.Deductions for - 6 (a) Proposed D.P./ D.P. Road widening Area /Service 522.000 Whole sale shops 234.93 Road / Highway widening For every 100sq.m. carpet area or fraction thereof 1x2.34 5x2.34 2.34 11.70 not being used for 100 =2.34 =11.70 (b) Any D.P. Reservation area 3863.000 ST K retail trading. =2.34 (c) Green Belt 0.000 AC P Total (a+b+c) 4385.000 P- -13 K 14 Total Parking Required (x 0.8) 0.8x2.34 5.Balance area of plot (3-4) 6358.000 ST 0.0x11.70 AC 1.87no. 11.70no. 6. Amenity Space 0.000 P As per Table No. 8c,Page No.145. =1.87no. =11.70no. P- -11 (Applicable if (1) > 20000 sqmt - K 12 AC ST (Required -(a) Upto 20000 sqmt - Nil - P P- -9 P (b) Above 20000 sqmt - (a) + 5 % of Total area 0.000 K 10 P- -15 AC 16 7. Net Plot Area (5-6 ) ST ST K 6358.000 AC P P 8. Recreational Open Space - P- -7 P- -17 AC K 8 18 CT (a) If area (6) is more than 4000 sqmt - 10 % of (6) is ST AC DU 635.800 P ST K required. P- -5 P K 6 P- -19 Proposed___ 635.997 AC 20 ST ST AC K CT DU (b) If area is less than 4000 sqmt -Check - - P P CT P- -3 P- -21 DU CT DU i) If it is full number like 1,2,125,419,etc. As per 7.12 CK 4 22 BUILT UP AREA CALCULATION ST A K AC abstract or City Survey Number - No Recreational open - 2 .C P P- -1 P ST 8'2.50 . 1 "x X0 &2 B-Wing GR. FLOOR (SHOP) space is required 2 P- -23 G 2'6 .75 24 " 1 5.50 X 5.80 X 1 NO = 31.90 SQ.MT. ii) If it is subdivision like 1/2 ,2/5 , 125/1 419/1 etc.then AC K recreational open space is required. - P P- -25 ST CT DU 8.05 2 3.20 X 7.52 X 1 NO = 24.06 SQ.MT. 26 T- 2 (A) 10 % Subject to minimum 200 sqmt 0.000 DU AC K E. C 3 5.15 X 5.99 X 1 NO = 30.85 SQ.MT. Proposed ______________ 635.997 ST P- EL P- 27 4 2.57 X 4.61 X 1 NO = 11.85 SQ.MT. (B) Exemption to leave open space subject to availing 28 - ST K D. -2 basic F.S.I of 75 % AC F. 1 5 6.55 X 7.52 X 1 NO = 49.26 SQ.MT. P 6.07 (C) Exemption to leave open space subject to payment P- -29 CT DU 6 2.57 X 4.60 X 1 NO = 11.82 SQ.MT. of 10 % land value of land at (7) as per annual - 30 AC K STANDARD ADDITION:- statement of rate. P ST 7 5.15 X 5.99 X 1 NO = 30.85 SQ.MT. P- -31 32 AC K 1) 8.05 x 6.07 = 48.86sm. 8 3.35 X 7.52 X 1 NO = 25.19 SQ.MT. WING-B Certificate of Area: 17.90 SQ.MT. GROUND FLOOR(SHOP) Certified that the plot under reference was surveyed by me on ST ST DU CT 9 3.85 X 4.65 X 1 NO = SUMMARY (WING-B) 2025-08-01 and the dimensions of sides etc. of plot stated onplan are 13.68 SQ.MT. P-LINE AREA DIAGRAM AI RC 10 2.28 X 6.00 X 1 NO = as measured on site and the area so worked out tallies with the area P-79 P-80 P-77 P-78 P-75 P-76 P-73 P-74 P-71 P-72 P-69 P-70 P-67 P-68 P-65 P-66 P-63 P-64 P-45 P-46 P-43 P-44 P-41 P-42 P-39 P-40 P-37 P-38 P-35 P-36 P-33 P-34 AS E 2 AT 7'0 .13X .TO "x 1. I. CT 11 2.82 X 7.52 X 1 NO = 21.21 SQ.MT. SC.1:200 PROPOSED P-LINE AREA STATEMENT stated in document of Ownership/ T.P. Scheme Records/Land P-61 P-47 CT 3'1 20 1" DU Records Department/City Survey records. STACK STACK STACK STACK STACK STACK STACK STACK STACK P-62 P-48 STACK STACK STACK STACK STACK STACK STACK UP DU WING-B TOTAL ADDITION = 268.57 SQ.MT. X Proposed P-Line Signature GR.FL. ENTRANCE LOBBY (Name of Architect/ Licensed Engineer/ Supervisor.) SE CT STACK STACK AI CA R 2. LIF 3 7'9 6 X T-5 DU FLOOR Area Owner's Declaration - P-59 "x 1. P-LINE AREA DIAGRAM (SQ.M.) 2. LIF ST 6'5 97 7 1. L. 9' 5 X T-2 " 3'1 20X V.D DUCT UP P-60 P-49 0" 2 x7 .1 '1 5 " 1" 1. x4 39 '7 " CARPET AREA STATEMENT(WING-B) I/We undersigned hereby confirm that I/We would abide by plans P-50 SC.1:100 approved by Authority / Collector. I/We would execute the structure (GROUND FLOOR SHOP) CT FIRE (Driver Rm+Soc.office) STACK LIFT LOBBY DU UP GROUND 268.57 (Comm.)+118.88 (stair+Lobby) as per approved plans. Also I/We would execute the work under STACK B-Wing (Drivers Rm+Soc.office) supervision of proper technical person so as to ensure the quality . 2.09 RERA CARPET LOFT AREA FLAT No. .W CLUB HOUSE LOBBY 1.15 X 0.60 .8 2 M STANDARD ADDITION:- 01 PODIUM PARKING and safety at the work site. DUCT Sq.Mt. Sq.Mt. 4.40 x 2.90 .1 SS DUCT UP DUCT LIFT-1 LIFT-3 LIFT-4 PA 4.15 E.D. 1.94X2.77 L.V.D 2.15 X 2.45 7'1"x8'0" 2.15 X 2.45 7'1"x8'0" 2.15 X 2.45 7'1"x8'0" 1) 3.42 x 3.20 = 10.94sm. 1 15.47 5.11 02 PODIUM PARKING Owner (s) name and signature 1.20X1.39 DUCT Architect/ Licensed Engineer/ Supervisor name and signature DUCT 2) 4.95 x 0.76 = 3.76sm. LIFT DUCT 0.65 03 PODIUM PARKING Job No. 2.15 x 2.44 PASSAGE 1.52 M. WIDE DU CT 5 3) 2.43 x 0.74 = 1.79sm. 2 13.78 4.56 4.00 4) 4.00 x 0.65 = 2.60sm. 04 850.64 LIFT-1 LIFT-2 UP G.C. 1&2 2.50X1.39 8'2"x4'7" F.D. 1.20X1.39 3'11"x4'7" DUCT DUCT DUCT REDUCED TO FIT PARKING DUCT F.D.-1 3'11"x3'11" 1.20X1.20 4 5) 4.15 x 2.09 = 8.67sm. 3 21.30 7.04 2.15 x 2.45 2.15 x 2.45 30 05 832.33 UP 28 26 1 3 DUCT DUCT DUCT WING-B TOTAL = 27.76sm. 4 12.18 4.03 Postal Address : Mohan Sky Ville,Flat no-402,4th 30 FIRE 24 5 7 DUCT GR.FL. Driver Rm. 06 823.44 Floor,,Kalyan,Thane,Maharashtra-421301,KALYAN 28 26 1 3 5 TOWER LIFT-3 2.75 x 2.15 DUCT 22 20 18 9 11 3.42 3.20 & Soc. office 5 15.98 5.28 24 22 7 11 13 15 16 13 15 2.43 P-LINE AREA DIAGRAM 6 11.38 3.78 07 850.64 DESCRIPTION OF PROJECT : 20 11 9 1 3 5 7 9 STAIRCASE STACK STACK 1 4.95 0.74 SC.1:100 STAIRCASE UP 18 13 3 Type of Proposal : Mixed 16 15 30 28 26 24 22 20 18 16 DUCT P83 P85 2 7 22.43 7.42 08 850.64 BUILDING ON CTS. NO./SURVEY NO.-33 STAIRCASE P84 P86 8 22.43 7.42 09 850.64 SITE ADDRESS : STACK PROPOSED BUILDING ON S. No.33, STACK P-51 P81 P-52 3.35 9 11.37 3.75 10 850.64 P82 0.76 WING-A& B 6.31 10 15.98 5.28 11 823.44 STACK P-53 Name Of Architect : VIJAY R PANDEY P-54 3rd FLOOR PODIUM PARKING PLAN LOGO ADDRESS OF OFFICE SC.1:200 1 11 12.19 4.03 12 850.64 OFFICE - RAMP UP 303,Raj-kamal Tower,Above Kotak STACK P-55 TO 2ND PODIUM P-56 12 22.42 7.41 13 850.64 Mahindra Bank,Santoshi Mata STANDARD ADDITION:- Road,Kalyan-(W).421301 1) 3.35 x 6.31 = 21.13 x 2Stair = 42.26sm. 13 11.09 3.67 14 850.64 OWNERS SIGN - TECHNICAL PERSON SIGN STACK P-57 Verified by applicant P-58 WING-B 14 12.30 4.07 850.64 15 GR.FL. STAIRCASE 15 14.63 4.84 P-LINE AREA DIAGRAM TOTAL =10,522.42SM. SCALE - 1:100 Date: 10/09/25 SC.1:100 JOB NO - KDMCC-24-ENTRY-127716 CHECK BY - - SUBMISSION DRAWING Drawing Sheet No.: 06/08 Reserved for Stamps of Approval plan BUILT UP AREA CALCULATION TYPICAL FLOOR (B-WING) TYP. 4/6/7/8/9/10/11/12/13/14/15th FLOOR AP 2. M. 91 BE AP X D 2. 75 1. C 2. K 9 9 .B 60 IT X . X 0. 2. 60 VE 45 AB DU O FT LO 1. BA CT . 00 LC 1. AT. .W X2 . .9 20 TO M 0 2. C 52 . X1 I. .9 .8 1 .0 X B 3 0. PA 60 SS DU CT AP 1. C.T 83 O 3. M. X1 I. 2. AT. 27 BE AP .2 4. LIV 13 TO 2 64 I N X1 I. X D X G .2 3. 2. 0 05 2. B 90 75 E X D 3. DU 45 3. M. CT 65 BE AP 2. BA X D DU 57 L X C. 2. CT DU 1. 90 CT 00 0 LI 8 S. X TY 0. 2. K 1. UT 0. 50 2. B 57 I T 1. C.T 2 I 91 75 E 20 O X 2. X1 I. M .W X D 45 . 2. .C .8 3 . 3. 45 VE M 50 . AB .W X0 1& PA O 0. 1. AT. G .7 2 S O FT 91 20 TO 5 VE LO 1. UT X2 I. AB PA 22 IL .1 FRD 9 X ITY 3 LO SS 0. 60 3. LIV FT 2. K AP . 05 IN 48 IT T X G X DU 4. 2. 43 45 3. BA C 05 L 2. BA X C. 1. 1. C.T 48 L 00 20 O -2 X C. X2 I. CT 1. 00 .1 3 DU 3. BA 05 L E. X C. EL 1. 00 3. LIV 05 IN FRD 3. M. 3. BA X G 65 BE 05 L 4. X D X C. 43 D. 2. 1. 00 -2 90 2. BA F. 48 L AP X C. 1. 00 1. AT. 20 TO 2. K X1 I. 48 IT 3. LIV CT .8 3 05 IN 7 DU X X G 2. 4. AP 45 VE 43 AB FT O 6 1. UT 22 IL X ITY .W . LO . .W 2. B M 1. C.T 0. 60 M 75 E 20 O 2. B 1 X1 I. S. X D 75 E .9 1. C.T .8 0. 3. PA 20 O 3 91 45 X D X1 I. 3. SS .3 TI .8 PA 45 0 LI X TY 3 10 S VE 1 U .0 0. 50 3. LIV AB O CT 05 IN FT AP 11 X G LO 57 KIT ST DU 4. 43 X AI AP 2. 45 RC 2. AS M . 2. BA E .W 57 L 1. X C. 52 50 3. M. 2. AT. 1.82 3. BA 05 L 1. 00 27 BE 13 TO X C. 1. X D X1 I. 3. LIV 1. 1. 3. .2 CT PA 05 IN 00 53 05 0 SS X G DU DU . 4. UP CT 43 AP 50 52 C. 63.48 0.47 X B AP 1. 0. 60 CT 2.25 5.77 6.10 2.75 3.30 5.40 5.35 3.31 3.42 5.61 3.94 3.23 1.45 6.97 AS 1. C.T 2.37 2. BALC. 2.57 X 1.00 E 2. LIF DU 20 O X1 I. 3. BA 05 L X C. 2.10 6.48 2.25 2.32 2.67 AP RC 36 T X -5 .8 3 1. 00 2.79 5.55 3.77 2. LIF AI 1. 3 5 1. FRD 5.77 1.65 7.45 1.70 6.25 1.96 1.61 1. ST 97 7.18 KIT FRD 75 T 50 1. L.V 2.62 8.62 BED KIT 2.45 X 2.60 X -2 2. 20 . X1 D 1. UT 22 IL .W . 6.45 .3 2.75 X 3.45 2.57 X 2.45 15 1. 9 1. AT. X ITY 0. 60 .9 M 1.57 2.90 BALC. BALC. M.BED CT 52 FRD 20 TO X1 I. .0 1 AB O VE 0.98 3.05 X 1.00 2.90 X 1.00 LOFT ABOVE 2.75 X 2.91 FIRE DU DU .8 3 SS FT 1.05 LIFT LOBBY FRD CT PA LO 57 KIT 0.94 1.99 AP LOFT ABOVE X 1.35 1.38 UP 2. 2.73 PASS. 0.91 M.W. 1. 45 2.45 2.23 5 2. PASS. 0.91 M.W. 0 2. BA 1.45 C.B. 1.91 X 0.60 12 3. M. 65 BE 57 L X C. 1. 1.39 0.75 2.324.66 M.BED UTILITY 1.12 X 0.60 C.TOI. AT.TOI. 1.83X1.20 X D 2. 00 19.02 19.02 8.10 3.65 X 2.90 LIVING LIVING 1.22X1.83 90 75 BE 16.25 7.87 AT.TOI. 1.20X1.83 C.TOI. 1.20X1.83 3.05 X 4.43 2.90 X 4.43 LIFT-1 LIFT-3 LIFT-4 X D 3. 45 1.951.22 1.70 23.49 23.90 6.25 5.68 DUCT 2.15 X 2.45 2.15 X 2.45 2.15 X 2.45 2. 24.65 1.68 1.39 2. LIV 25.81 DUCT 90 IN AP X G 4. 27.10 3.20 FRD 7.72 Adjoining A-Wing 43 AP 4 5 2.10 7.74 1. C.T 1.22 3.86 8.92 20 O X1 I. Proforma I : Area Statement DU .8 2. BA DUCT PASS. 1.52 M.W. CT 3 . 90 L X C. 1. 1.38 1. Area of plot (Minimum area of a, b, c to be FRD .W 00 considered) or area of subplot with sanctioned layout No. 10743.000 M 1. AT. 1 0.60 1.45 1.35 12.90 and subplot No. 83 TO .0 .9 0.52 0.88 1.05 3 2 1 F.D.-1 X1 I. .2 PA SS 2.15 1.07 2.23 0.75 (a) As per ownership document (7/12, CTS extract) 10820.000 0 VE 3.58 0.44 4.373.03 (b) as per TILR or City Survey measurement sheet 10820.000 DUCT 1.20X1.20 AB O 5.05 3.22 0.63 2.73 5.77 41.23 2.194.39 FT (c) as per Demarcated drawing area 11202.341 2. K 5.27 7.18 LO 45 IT 2.33 LESS AT.TOI. DUCT C.TOI. 1. C 81 .B X 2. 2.46 1.38 11.22 LIVING LIVING LIVING 60 1.39 2.Area not in possession 0.000 1.20X1.83 1.20X1.83 X . 5.49 6.25 2.50 2.13 0. M.BED 3.05 X 4.43 3.05 X 4.43 C.TOI. DUCT AT.TOI. 2.90 X 4.43 C.TOI. 60 1.22 3. Entire area (1-2) 10743.000 3.65 X 2.90 1.20X1.83 1.20X1.83 1.22X1.83 AT.TOI. 2. M. UTILITY M.BED 1.83X1.20 75 BE AP 0.40 7.72 1.38 2.82 4.Deductions for - 1.12 X 0.60 UTILITY 3.65 X 2.90 C.B. X D 2. 1.41 (a) Proposed D.P./ D.P. Road widening Area /Service 1.99 X 0.60 91 522.000 PASS. 0.91 M.W. 1.12 X 0.60 3.24 Road / Highway widening PASS. 0.91 M.W. 0.65 5.34 (b) Any D.P. Reservation area 3863.000 PASS. 0.91 M.W. AP 1.91 1.16 19.15 (c) Green Belt 0.000 AP 0.72 6.19 LOFT ABOVE M.BED 2.06 4.64 Total (a+b+c) 4385.000 BALC. BALC. LOFT ABOVE AP BALC. 2.75 X 2.91 1.12 1.27 3.05 X 1.00 3.05 X 1.00 2.90 X 1.00 LOFT ABOVE 1.45 2.38 3.16 3.144.66 0.48 5.77 5.Balance area of plot (3-4) 6358.000 BED KIT 7.87 1.63 2.32 2.10 7.86 6. Amenity Space 2.57 X 2.45 1.45 3.92 0.000 2.75 X 3.45 KIT BED KIT 1.38 0.96 0.94 (Applicable if (1) > 20000 sqmt - 2.57 X 2.45 2.75 X 3.45 2.45 X 2.60 2.05 1.392.02 1.99 1.57 (Required -(a) Upto 20000 sqmt - Nil - 3.71 0.92 3.05 14.32 (b) Above 20000 sqmt - (a) + 5 % of Total area 0.000 BALC. AP 1.52 7.72 1.99 1.371.90 2.32 1.55 7. Net Plot Area (5-6 ) 6358.000 2.57 X 1.00 1.12 0.93 1.27 BALC. 2.57 X 1.00 AP 1.12 0.63 2.77 0.77 15.69 8. Recreational Open Space - 1.39 1.39 11.35 (a) If area (6) is more than 4000 sqmt - 10 % of (6) is AP 2.02 1.08 2.75 635.800 1.38 required. AP 1.38 1.91 CARPET AREA STATEMENT(WING-B) WING-B 2.25 3.28 2.22 7.08 Proposed___ 635.997 2.10 7.31 (b) If area is less than 4000 sqmt -Check - - (TYP.4/7/8/9/10/12/13/14/15th FLOOR) TYP. 4/7/8/9/10/12/13/14/15th FLOOR PLAN 6.25 3.05 3.49 1.63 1.11 5.67 i) If it is full number like 1,2,125,419,etc. As per 7.12 SC.1:100 5.32 2.02 4.24 abstract or City Survey Number - No Recreational open - 4.05 1.52 4.24 FLAT No. RERA CARPET Sq.Mt. BALCONY Sq.Mt. 2.60 3.60 2.60 2.75 2.90 3.19 2.26 5.04 space is required 5.77 ii) If it is subdivision like 1/2 ,2/5 , 125/1 419/1 etc.then 7.72 4.05 4.53 3.04 8.50 recreational open space is required. - 1 37.67 3.04 (WING-B) Table No. 8B - Parking Requirements 0.45 WING-B 0.85 1.60 0.70 (A) 10 % Subject to minimum 200 sqmt 0.000 4th To 15th FLOOR Proposed ______________ 635.997 2 52.38 5.84 Sr. Occupany Size of tenement Parking Space Required P-LINE AREA DIAGRAM (B) Exemption to leave open space subject to availing 3 52.45 5.84 No. Required Proposed TYP. 4/6/7/8/9/10/11/12/13/14/15th FLOOR basic F.S.I of 75 % - Total No. SC.1:200 (C) Exemption to leave open space subject to payment Flat of 10 % land value of land at (7) as per annual - 4 52.44 5.84 Car Scooter Car Scooter statement of rate. 1 Residential For every tenement having carpet area of 1x0=0 Nil. Nil. 2x0=0 Nil. 5 37.78 2.97 i) Multi - Family 150sq.m. and above. Certificate of Area: Certified that the plot under reference was surveyed by me on residential For every tenement having carpet area equal to or 1x1=1no 1x1=1no 6 54.79 5.74 above 80sq.m. but less then 150sq.m. 01 1no 1no 2025-08-01 and the dimensions of sides etc. of plot stated onplan are as measured on site and the area so worked out tallies with the area For every two tenements with each tenement stated in document of Ownership/ T.P. Scheme Records/Land 7 53.01 5.83 having carpet area equal to or above 40sq.m. but 94 1x47 =47no. 2x47 94no. 47no. 94no. Records Department/City Survey records. less then 80sq.m. Signature 8 38.52 2.90 For every two tenements with each tenement (Name of Architect/ Licensed Engineer/ Supervisor.) 46 1x23 2x23 Owner's Declaration - having carpet area less than 40sq.m. but more 23no 46no 9 54.93 5.67 then 30sq.m. =23no =46no I/We undersigned hereby confirm that I/We would abide by plans approved by Authority / Collector. I/We would execute the structure 2x0 10 52.24 5.84 For every two tenements with each tenement having carpet area less than 30sq.m. Nil. 0x0 =0 no. =0no. Nil. NIL. as per approved plans. Also I/We would execute the work under supervision of proper technical person so as to ensure the quality 11 52.24 5.84 Additional 5% Visitor Parking 5%(71) 5%(141) =3.55no. =7.05no. 3.55no. 7.05no. and safety at the work site. Owner (s) name and signature 12 37.84 3.05 Total Parking Required (x 0.8) 0.8x74.55 0.0x148.05 Architect/ Licensed Engineer/ Supervisor name and signature 59.64no. 148.05 Job No. As per Table No. 8c,Page No.145. =59.64 no. =148.05no. TOTAL CARPET AREA =576.29 x 9Fl.= 5186.61sm. TOTAL BALCONY AREA =58.40 x 9Fl.= 525.60sm. Postal Address : Mohan Sky Ville,Flat no-402,4th Floor,,Kalyan,Thane,Maharashtra-421301,KALYAN DESCRIPTION OF PROJECT : Type of Proposal : Mixed BUILDING ON CTS. NO./SURVEY NO.-33 SITE ADDRESS : PROPOSED BUILDING ON S. No.33, Name Of Architect : VIJAY R PANDEY LOGO ADDRESS OF OFFICE OFFICE - 303,Raj-kamal Tower,Above Kotak Mahindra Bank,Santoshi Mata Road,Kalyan-(W).421301 OWNERS SIGN - TECHNICAL PERSON SIGN Verified by applicant SCALE - 1:100 Date: 10/09/25 JOB NO - KDMCC-24-ENTRY-127716 CHECK BY - - SUBMISSION DRAWING Drawing Sheet BUILT UP AREA CALCULATION No.: 07/08 5th FLOOR (B-WING) AP 2. M. 91 BE AP X D 2. 75 . C 9 2. K 9 .B X . 60 IT 0. 60 X 2. 1 VE 45 AB DU O FT LO 1. BA CT .W 00 LC 1. AT. . X2 . .9 2 0 TO M 0 2. C 52 . X1 I. 0. .8 91 X B 3 . 0. SS 60 PA DU CT AP 1. C.T 83 O 3. M. X1 I. 2. AT. 27 BE AP .2 4. LIV 13 TO 2 64 IN X1 I. X D X G .2 3. 2. 0 05 2. B 90 75 E X D CT 3. 45 3. M. DU 65 BE AP 2. BA X D CT 57 L X C. 2. DU T 1. 90 DU 00 C 8 PA 1. UT 20 IL Reserved for Stamps of Approval plan KI X T 1. C.T SS 2. B 2. 20 O X IT 75 E 45 X1 I. . 0. Y X D 7 2. .C .8 LO 0. 50 3. 3 91 45 . 2. 5 VE .W 50 . FT AB M X0 1& AB M O 1. AT. .7 2 FT S. 20 TO G 5 O VE .W LO 0. 1. T X2 I. 2. K 91 22 I L .1 FRD 9 . PA U X ITY 0. 3 3 . L IV 48 IT 60 AP S 05 IN X DU X G 4. 2. CT 43 45 3. BA 05 L 2. BA X C. 1. 1. C.T 48 L 00 20 O -2 X C. X2 I. 1. .1 .D 00 3 UC 3. BA T 05 L EL X C. 1. E 00 3. LIV 05 IN FRD 3. M. 3. BA X G 65 BE 05 L 4. X D X C. 43 D. 2. 1. 00 -2 90 2. BA F. 48 L AP X C. 1. 00 1. AT. 20 TO 2. K X1 I. 48 IT 3. LIV DU .8 3 05 IN 7 CT X X G 2. 4. AP 45 VE 43 O AB 6 1. UT 22 IL LO X ITY . . FT .W .W 75 BE 1. C.T 0. M 20 O 60 M X D 2. B 0. 91 X1 I. 0. 91 3.45 75 E 1. C.T .8 3 20 O X D SS X1 I. SS 2. 3. . 1. UT .8 . 45 PA 30 IL 3 10 PA VE X ITY 0. 50 3. LIV AB O T 05 IN FT AP DU 11 X G LO 2. K ST C 4. 57 IT 43 AI AP X RC 2. 45 A SE .W . 2. BA 57 L 1. M X C. 52 1. 3. M. 2. AT. .82 3. BA 05 L 1. 00 50 27 BE 13 TO X C. X D X1 I. S. 3. LIV 1. 1. 3. .2 DU 1 05 IN 00 53 CT 05 0 PA X G CT S 4. UP DU 43 AP 1. 52 C. 0 63.48 0.47 X B AP 50 0. 6 DU 2.25 5.77 6.10 2.75 3.30 5.40 5.35 3.31 3.42 5.61 3.94 3.23 1.45 6.97 AS 1. C.T 2.37 2. BALC. 2.57 X 1.00 E 2. LIF CT 20 O X1 I. 3. BA 05 L X C. 2.10 6.48 2.25 2.32 2.67 AP RC 36 T X -5 .8 3 1. 00 2.79 5.55 3.77 2. LIF 1. ST 1. 53 1. FRD 5.77 1.65 7.45 1.70 6.25 1.96 1.61 KIT FRD 75 T 50AI 97 1. L.V 2.62 8.62 7.18 BED KIT 2.45 X 2.60 X -2 2. 20 . X1 D 1. UT 22 IL M .W . 6.45 .3 2.75 X 3.45 2.57 X 2.45 15 9 1. AT. X ITY 2.90 1.52 20 TO 0. 60 0.91 VE 1.57 0.98 BALC. BALC. M.BED DU FRD X1 I. AB O 3.05 X 1.00 2.90 X 1.00 LOFT ABOVE 2.75 X 2.91 FIRE CT DU .8 3 PA SS LO 1.05 LIFT LOBBY FRD CT . FT 2. K 0.94 1.99 AP LOFT ABOVE 57 IT 1.35 1.38 UP X 2.73 PASS. 0.91 M.W. 1. 2. 45 2.45 2.23 50 PASS. 0.91 M.W. 2. BA 1.45 C.B. 1.91 X 0.60 12 3. M. 65 BE 57 L X C. 1. 1.39 0.75 2.324.66 M.BED UTILITY 1.12 X 0.60 C.TOI. AT.TOI. 1.83X1.20 X D 2. 00 19.02 19.02 8.10 3.65 X 2.90 LIVING LIVING 1.22X1.83 90 2. B 75 E 16.25 7.87 AT.TOI. 1.20X1.83 C.TOI. 1.20X1.83 3.05 X 4.43 2.90 X 4.43 LIFT-1 LIFT-3 LIFT-4 X D 3. 1.951.22 1.70 45 23.49 23.90 6.25 5.68 DUCT 2.15 X 2.45 2.15 X 2.45 2.15 X 2.45 24.65 1.68 1.39 2. LIV 25.81 DUCT 90 IN AP X G 4. 27.10 3.20 FRD 7.72 Adjoining A-Wing 43 AP 4 5 2.10 7.74 1. C.T 1.22 3.86 8.92 20 O X1 I. DU .8 2. BA DUCT PASS. 1.52 M.W. CT 3 . 90 L X C. 1. 1.38 FRD .W 00 M 1. AT. 91 0.60 1.45 1.35 12.90 83 TO 0. 0.52 0.88 1.05 2.15 1.07 X1 I. PA 2 1 F.D.-1 .2 0 SS . 3.03 2.23 0.75 AB VE 3.58 0.44 4.37 5.05 3.22 0.63 2.73 5.77 DUCT 1.20X1.20 O 41.23 2.194.39 FT LO 2. K 45 IT 5.27 7.18 2.33 DUCT C.TOI. 81 C.B X 2. 2.46 1.38 11.22 1.20X1.83 LIVING LIVING X . 0. 60 5.49 1.39 6.25 2.50 2.13 60 6.25 X 4.43 C.TOI. DUCT AT.TOI. 2.90 X 4.43 C.TOI. 1. 1.22 1.20X1.83 1.20X1.83 1.22X1.83 AT.TOI. 2. M. M.BED 1.83X1.20 75 BE AP 0.40 7.72 1.38 2.82 UTILITY 3.65 X 2.90 C.B. X D 2. 1.41 1.99 X 0.60 91 1.12 X 0.60 3.24 PASS. 0.91 M.W. PASS. 0.91 M.W. 0.65 5.34 AP 1.91 1.16 19.15 0.72 6.19 M.BED 2.06 4.64 BALC. BALC. LOFT ABOVE AP BALC. 2.75 X 2.91 1.12 1.27 3.05 X 1.00 3.05 X 1.00 2.90 X 1.00 LOFT ABOVE 1.45 2.38 3.16 3.144.66 0.48 5.77 BED 7.87 1.63 2.32 2.10 7.86 2.72 X 2.45 1.45 3.92 2.75 X 3.45 KIT BED KIT 1.38 0.96 0.94 2.57 X 2.45 2.45 X 2.60 2.05 1.99 1.57 2.75 X 3.45 WING-B 3.71 1.392.02 0.92 3.05 14.32 BALC. AP 5th FLOOR PLAN 1.52 7.72 1.99 1.371.90 2.32 2.57 X 1.00 SC.1:100 6.42 1.55 0.93 BALC. 1.12 1.27 0.77 15.69 2.57 X 1.00 AP 1.39 1.39 0.63 2.77 AP 2.75 11.35 3.04 2.02 1.08 AP 2.25 1.38 1.91 3.28 2.22 7.08 2.10 3.49 7.31 CARPET AREA STATEMENT(WING-B) 6.25 3.05 1.63 1.11 5.67 5.32 2.02 4.24 4.20 3.60 2.90 1.52 4.24 (5th FLOOR) 2.60 2.60 3.19 5.04 2.75 2.26 5.77 RERA CARPET BALCONY 7.72 4.05 4.53 3.04 8.50 FLAT No. Sq.Mt. Sq.Mt. 0.45 WING-B 0.85 1.60 0.70 1 37.67 3.04 P-LINE AREA DIAGRAM 5th FLOOR Proforma I : Area Statement 2 88.12 11.70 SC.1:200 1. Area of plot (Minimum area of a, b, c to be considered) or area of subplot with sanctioned layout No. 10743.000 3 --- ---- and subplot No. (a) As per ownership document (7/12, CTS extract) 10820.000 4 52.44 5.84 (b) as per TILR or City Survey measurement sheet 10820.000 (c) as per Demarcated drawing area 11202.341 5 37.78 2.97 LESS 2.Area not in possession 0.000 6 54.79 5.74 3. Entire area (1-2) 10743.000 4.Deductions for - 7 53.01 5.83 (a) Proposed D.P./ D.P. Road widening Area /Service 522.000 Road / Highway widening 8 38.52 2.90 (b) Any D.P. Reservation area 3863.000 (c) Green Belt 0.000 9 54.93 5.67 Total (a+b+c) 4385.000 5.Balance area of plot (3-4) 6358.000 10 52.24 5.84 Carpet Area Table 6. Amenity Space 0.000 Enclosed Balcony Normal Balcony Building Name Floor Name Carpet name Tenement No Carpet Area Mezzanine Area Total Carpet Area (Applicable if (1) > 20000 sqmt - 11 52.24 5.84 WING B STILT-GROUND FLOOR 01 1 15.475 Area 0.000 Area 0.000 0.000 15.475 (Required -(a) Upto 20000 sqmt - Nil - STILT-GROUND (b) Above 20000 sqmt - (a) + 5 % of Total area 0.000 12 37.84 3.05 WING B FLOOR STILT-GROUND 02 1 13.784 0.000 0.000 0.000 13.784 7. Net Plot Area (5-6 ) 6358.000 WING B 03 1 21.303 0.000 0.000 0.000 21.303 FLOOR STILT-GROUND 8. Recreational Open Space - WING B 04 1 12.184 0.000 0.000 0.000 12.184 FLOOR (a) If area (6) is more than 4000 sqmt - 10 % of (6) is STILT-GROUND 635.800 WING B FLOOR 05 1 15.979 0.000 0.000 0.000 15.979 required. STILT-GROUND WING B FLOOR 06 1 11.381 0.000 0.000 0.000 11.381 Proposed___ 635.997 WING B STILT-GROUND FLOOR 07 1 22.430 0.000 0.000 0.000 22.430 (b) If area is less than 4000 sqmt -Check - - WING B STILT-GROUND 08 1 22.420 0.000 0.000 0.000 22.420 i) If it is full number like 1,2,125,419,etc. As per 7.12 FLOOR abstract or City Survey Number - No Recreational open - TOTAL CARPET AREA =559.58sm. WING B STILT-GROUND FLOOR 09 1 11.369 0.000 0.000 0.000 11.369 space is required STILT-GROUND TOTAL BALCONY AREA =58.42sm. WING B FLOOR 10 1 15.979 0.000 0.000 0.000 15.979 ii) If it is subdivision like 1/2 ,2/5 , 125/1 419/1 etc.then - WING B STILT-GROUND FLOOR 11 1 12.190 0.000 0.000 0.000 12.190 recreational open space is required. Area utilisation of Roads and Reservations WING B STILT-GROUND 12 1 22.419 0.000 0.000 0.000 22.419 Description of area utilisation surrendered Area Quatam of DR/TDR Total Quatam of Area considered Remaining area for (A) 10 % Subject to minimum 200 sqmt 0.000 FLOOR in(SqM) generation DR/TDR generation for DR utilisation DRC generation WING B STILT-GROUND 13 1 11.086 0.000 0.000 0.000 11.086 BUILDING Reservation type reseravation no Name Proposed ______________ 635.997 FLOOR 15.000.m DP Road (B) Exemption to leave open space subject to availing WING B STILT-GROUND 14 1 12.300 0.000 0.000 0.000 12.300 - - Widening 522.000 1044.000 1044.000 0.000 0.000 - FLOOR Primary School basic F.S.I of 75 % WING C STILT-GROUND Educational 95 2168.000 4336.000 4336.000 0.000 0.000 WING B FLOOR 15 1 14.634 0.000 0.000 0.000 14.634 Educational PG 94 PG 94 1695.000 3390.000 3390.000 0.000 0.000 (C) Exemption to leave open space subject to payment BUILDING FLOORS FSI AREA BALCONY TERRACE LIFT LIFTWELL DUCT VENT OTHER TOTAL COMM. RESI. IND. EDU. INS. MEZZ. PROP. SHAFT DEDUCTION FSI AREA WING B 4TH FLOOR 401 1 37.494 0.000 0.000 0.000 37.494 - - Total 4385.000 8770.000 8770.000 1044.000 7726.000 of 10 % land value of land at (7) as per annual - WING B 4TH FLOOR 402 1 51.920 0.000 0.000 0.000 51.920 WING C TOTAL 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 statement of rate. WING B 4TH FLOOR 403 1 51.988 0.000 0.000 0.000 51.988 Parking Check (Table 8B) WING B 4TH FLOOR 404 1 51.985 0.000 0.000 0.000 51.985 RATIO Required WING A WING B 4TH FLOOR 405 1 37.494 0.000 0.000 0.000 37.494 Transport Certificate of Area: BUILDING FLOORS FSI AREA BALCONY TERRACE LIFT LIFTWELL DUCT VENT OTHER TOTAL NO.OF COMM. RESI. IND. EDU. INS. MEZZ. PROP. SHAFT DEDUCTION FSI AREA WING B 4TH FLOOR 406 1 54.467 0.000 0.000 0.000 54.467 Building Name USE TENAMENT AREA car scooter Tena/Area/Units car scooter Vehicle/Ambulance Certified that the plot under reference was surveyed by me on /Mini Bus 407 52.324 0.000 0.000 0.000 52.324 WING A TOTAL 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 WING B 4TH FLOOR 1 For every two 2025-08-01 and the dimensions of sides etc. of plot stated onplan are WING B 4TH FLOOR 408 1 38.366 0.000 0.000 0.000 38.366 WING B 4TH FLOOR 409 1 54.467 0.000 0.000 0.000 54.467 tenements with each tenement having as measured on site and the area so worked out tallies with the area WING B WING B Residential 1 2 46 23.000 46.000 - WING B 4TH FLOOR 410 1 51.918 0.000 0.000 0.000 51.918 carpet area less stated in document of Ownership/ T.P. Scheme Records/Land BUILDING FLOORS FSI AREA BALCONY TERRACE LIFT LIFTWELL DUCT VENT OTHER TOTAL than 40 Sq.m. but COMM. RESI. IND. EDU. INS. MEZZ. PROP. SHAFT DEDUCTION FSI AREA WING B 4TH FLOOR 411 1 51.919 0.000 0.000 0.000 51.919 more than 30 sq.m. Records Department/City Survey records. WING B 4TH FLOOR 412 1 37.559 0.000 0.000 0.000 37.559 TYPICAL 7TH TO For every two Signature WING B 10TH-12TH TO 0.000 7240.008 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 435.608 0.000 0.000 6804.400 WING B 5TH FLOOR 501 1 37.494 0.000 0.000 0.000 37.494 tenements with each 15TH FLOOR WING B 5TH FLOOR 502 1 88.124 0.000 0.000 0.000 88.124 tenement having (Name of Architect/ Licensed Engineer/ Supervisor.) WING B Residential carpet area equal to 1 2 94 47.000 94.000 - WING B 6TH-11TH FLOOR 0.000 1834.938 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 105.810 0.000 82.000 1647.128 WING B 5TH FLOOR 504 1 51.985 0.000 0.000 0.000 51.985 or above 40 sq.m. Owner's Declaration - WING B 5TH FLOOR 0.000 884.964 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 52.905 0.000 0.000 832.059 but less than 80 WING B 4TH FLOOR 0.000 905.261 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 54.451 0.000 0.000 850.810 WING B 5TH FLOOR 505 1 37.494 0.000 0.000 0.000 37.494 sq.m. I/We undersigned hereby confirm that I/We would abide by plans WING B 5TH FLOOR 506 1 54.467 0.000 0.000 0.000 54.467 STILT-GROUND WING B 5TH FLOOR 507 1 51.919 0.000 0.000 0.000 51.919 For every tenement approved by Authority / Collector. I/We would execute the structure WING B 268.548 118.917 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 387.465 having carpet area FLOOR WING B 5TH FLOOR 508 1 38.366 0.000 0.000 0.000 38.366 WING B Residential equal to or above 80 1 1 1 1.000 1.000 - as per approved plans. Also I/We would execute the work under WING B TOTAL 268.548 10984.088 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 648.774 0.000 82.000 10521.862 WING B 5TH FLOOR 509 1 54.467 0.000 0.000 0.000 54.467 sq.m. but less than 150 sq.m. supervision of proper technical person so as to ensure the quality WING B 5TH FLOOR 510 1 51.918 0.000 0.000 0.000 51.918 FSI DETAILS For every 100 sq.m. and safety at the work site. WING B 5TH FLOOR 511 1 51.919 0.000 0.000 0.000 51.919 WING B Commercial carpet area or 2 6 234.932 4.699 14.096 - Incentive FSI for Basic FSI Premium FSI TDR/DR green building If Additional FSI Ancillary Area Ancillary Area Inclusive Housing WING B 5TH FLOOR 512 1 37.559 0.000 0.000 0.000 37.559 fraction thereof Drawing Value 9 Index (on serial no 7) (on serial no 3) (on serial no 3) Applicable (10.10.1 Note:3) 60% of (2+3+4+5) 80% of (2+3+4+5) Total (20%) If Applicable WING B 6TH-11TH FLOOR 601;1101 2 37.494 0.000 0.000 0.000 37.494 Total - - - - - 75.699 155.096 - Owner (s) name and signature ( on basic FSI) Visitors parking(5%) 9.1 Permissible WING B 6TH-11TH FLOOR 602;1102 2 51.920 0.000 0.000 0.000 51.920 - - - - - 3.550 7.050 - Architect/ Licensed Engineer/ Supervisor name and signature 1.100 0.500 0.900 0.000 0.000 0.000 0.000 2.500 0.220 0.000 WING B 6TH-11TH FLOOR 603;1103 2 51.988 0.000 0.000 0.000 51.988 Total - - - - - 79.249 162.146 0.000 Index WING B 6TH-11TH FLOOR 604;1104 2 66.236 0.000 0.000 0.000 66.236 Job No. 9.2 Existing 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Comsumed Index WING B 6TH-11TH FLOOR 606;1106 2 54.467 0.000 0.000 0.000 54.467 Parking Check As Per Multiplying Factor 0.800 9.3 Balance Index to WING B 6TH-11TH FLOOR 607;1107 2 51.919 0.000 0.000 0.000 51.919 Required Proposed 1.100 0.500 0.900 0.000 0.000 0.000 0.000 0.000 0.000 0.000 be Consumed WING B 6TH-11TH FLOOR 608;1108 2 38.366 0.000 0.000 0.000 38.366 Transport Transport 9.4 Total Permissible Building Name Car Scooter Vehicle/Ambulance Car Scooter Vehicle/Ambulance Status 6993.800 5371.500 9668.700 0.000 0.000 0.000 0.000 22034.000 1398.760 0.000 WING B 6TH-11TH FLOOR 609;1109 2 54.467 0.000 0.000 0.000 54.467 PLine Area /Mini bus /Mini bus 9.5 Proposed P Line WING B 6TH-11TH FLOOR 610;1110 2 51.918 0.000 0.000 0.000 51.918 Total 63 159 0 66 166 0 OK Area (Should not 9378.600 2417.170 1044.000 0.000 0.000 0.000 0.000 12839.770 0.000 10521.862 exceed 9.4 ) WING B 6TH-11TH FLOOR 611;1111 2 51.919 0.000 0.000 0.000 51.919 Postal Address : Mohan Sky Ville,Flat no-402,4th WING B 6TH-11TH FLOOR 612;1112 2 37.559 0.000 0.000 0.000 37.559 9.6 Index Consumed 1.475 0.225 0.097 0.000 0.000 0.000 0.000 1.797 0.000 0.000 SCHEDULE OF OPENING Floor,,Kalyan,Thane,Maharashtra-421301,KALYAN BLD NAME NAME LENGTH HEIGHT Nos. Carpet Area Table WING B v 0.600 1.200 95 Enclosed Balcony Normal Balcony Building Name Floor Name Carpet name Tenement No Carpet Area Mezzanine Area Total Carpet Area Area Area TYPICAL 7TH TO 701;801;901;1001;1 Owner Details DESCRIPTION OF PROJECT : WING B 10TH-12TH TO 8 37.494 0.000 0.000 0.000 37.494 Owner Name Postal Address Contact Number 201;1301;1401;1501 15TH FLOOR Mohan Sky Ville,Flat Type of Proposal : Mixed TYPICAL 7TH TO M/S SQYLINES no-402,4th WING B 10TH-12TH TO 702;802;902;1002;1 8 51.920 0.000 0.000 0.000 51.920 BUILDERS LLP Floor,,Kalyan,Thane, 8149549222 BUILDING ON CTS. NO./SURVEY NO.-33 202;1302;1402;1502 15TH FLOOR Maharashtra-421301 TYPICAL 7TH TO M/s Sqylines 703;803;903;1003;1 WING B 10TH-12TH TO 8 51.988 0.000 0.000 0.000 51.988 Builders Llp,SMT SITE ADDRESS : 203;1303;1403;1503 15TH FLOOR Aanusaya Mohan TYPICAL 7TH TO 704;804;904;1004;1 Bhoir And Others PROPOSED BUILDING ON S. No.33, WING B 10TH-12TH TO 8 51.985 0.000 0.000 0.000 51.985 And Mr Sharad 204;1304;1404;1504 15TH FLOOR Waman Karbhari TYPICAL 7TH TO And Others P.O.A KALYAN 705;805;905;1005;1 M/S Sqylines WING B 10TH-12TH TO 8 37.494 0.000 0.000 0.000 37.494 205;1305;1405;1505 Builders LLP Partner 15TH FLOOR TYPICAL 7TH TO Trust Through Mr Name Of Architect : VIJAY R PANDEY 706;806;906;1006;1 Mohan H Tharwani WING B 10TH-12TH TO 8 54.467 0.000 0.000 0.000 54.467 15TH FLOOR 206;1306;1406;1506 And Mokshay P LOGO ADDRESS OF OFFICE Sadhwani, TYPICAL 7TH TO 707;807;907;1007;1 OFFICE - WING B 10TH-12TH TO 8 52.324 0.000 0.000 0.000 52.324 207;1307;1407;1507 15TH FLOOR 303,Raj-kamal Tower,Above Kotak TYPICAL 7TH TO 708;808;908;1008;1 Mahindra Bank,Santoshi Mata WING B 10TH-12TH TO 8 38.366 0.000 0.000 0.000 38.366 15TH FLOOR 208;1308;1408;1508 Road,Kalyan-(W).421301 TYPICAL 7TH TO WING B 10TH-12TH TO 709;809;909;1009;1 8 54.467 0.000 0.000 0.000 54.467 OWNERS SIGN - TECHNICAL PERSON SIGN 209;1309;1409;1509 15TH FLOOR Verified by applicant TYPICAL 7TH TO 710;810;910;1010;1 WING B 10TH-12TH TO 8 51.918 0.000 0.000 0.000 51.918 210;1310;1410;1510 15TH FLOOR TYPICAL 7TH TO 711;811;911;1011;1 WING B 10TH-12TH TO 8 51.919 0.000 0.000 0.000 51.919 211;1311;1411;1511 15TH FLOOR TYPICAL 7TH TO 712;812;912;1012;1 SCALE - 1:100 Date: 10/09/25 WING B 10TH-12TH TO 8 37.559 0.000 0.000 0.000 37.559 212;1312;1412;1512 15TH FLOOR JOB NO - KDMCC-24-ENTRY-127716 CHECK BY - - SUBMISSION DRAWING Drawing Sheet 2. 2. 2. No.: 08/08 88 88 3. 88 3. 0. 9 3. 0. 9 34 3. 81 75 2. 81 75 2. 9 81 75 9 2. 0 0 75 0 0 7 50 6. 0 0 75 0 15 0. 0 1 0. 2. 3. 2. 3. 15 3. 14 0 05 3. 14 0 05 3. 0 2. 05 0 75 0 0. 66 95 75 0 0. 66 95 0. 14 0.75 45 0 3. 0. 75 9 0. 0 75 9 0. 15 0 0 0. 95 3. 1. 1. 0 3. 1. 0 15 0 0 0 75 0 05 60 39. 9 30 45 0 0 05 60 1. 39. 9 0. 45 0 0 30. 15 3. 3. 60 1. 1. 4.83 0 0 0 2. 190 1. 4.83 0 2. 0 63 190 0 6. 05 2. 39. 9 0. 35 0 3. 25 0. 6 26 3. 25 0 1. 4.83 50 0 0 25 63 190 1. 0 2 0 0 35 0 0 0 35 0 3. 0 0 05 . 3. 2. 1. 1.30.5 1. 0 2 90. 2. 1. 0 2 1. 1.30.5 26 .1 0 0 430 26 2. 1. 1.30.5 0 05 .4 72 05 60 72 45 0. 30 15 45 0. .4 90. 2. 45 74 480 5000 90. 0 30 74 480 5000 1. 0 0 72 0. 2. 0 5 2. 3. 46 0 2. 0 2. 1. 46 15 0 0 0 74 480 5000 2.66 1. 46 15 0 5 0 BUILT-UP AREA CALCULATION 1. 5 9 0 2. 0. 00 0. 00 0. 0 0 59 1. 30 2. 1. 30 STILT-GROUND FLOOR WING B 2. 1. 30 1. 22 0 59 1. 22 0 59 508. 8 11..6 35 05 8 11..6 35 8 0 6880 0 0 688 0 0 50 11..6 1. 081 3. 00 3. BUILT UP AREA CALCULATION 688 22 30. 05 00 3. 0 0 1. 0 1. 6. 00 0 80 0 25 1. 508. 1. 2. 25 1. 508. 1. 2. FOR STILT-GROUND FLOOR WING B 25 1. 1. 6. 09 081 9 63 1. 6. 09 081 9 63 AREA NAME LENGTH WIDTH Area(Sq.M) 0 09 1. 31 95 0 30. 02 54 1 95 0 30. 02 54 1 1. 50 95 2. 5 8 1. 8 1. BLOCK 6.907 6.737 21.134 95 1. 0 1. 3. 20 4 6 00 3. 2 5 00 3. 2 5 3 00 2 2. 2. BLOCK AREA TOTAL =21.134Sq.M 5.68 Duct5 3. 2 10 0 5.68 Duct13 10 3. 2 TOTAL Deduction =0.000Sq.M 68 0 Duct9 2.10 3. 2 0 61 0 0 61 5. 0 61 2 2 Net BuiltUp Area =21.134 Sq.M 2 3. 1. 3. 1. 3. 1. 34 46 3 46 34 46 9 24 0 05 49 24 0 50 5. 0 0 .7 0 9 05 0. 494 3. .7 3. 18 952 7. 952 0 82 3. Reserved for Stamps of Approval plan 2 5. 2. 18 5. 2. 15 7. 0. 59 2. 2 0. 59 2. 7. 36. 2. 0 0. 494 1 0. 0. 494 59 67 72 67 72 04 0 72 3.050 2.720 15 6 9 0 3.050 2.720 9 0 3.050 2.720 67 9 2.750 6. 2.750 15 6 6. 2.750 9 .6 6 2. 952 0.750 2.9000.523 36. 0.750 2.9000.523 36. 0 0.750 25 2.9000.523 2.158 25 2.158 04 0 Duct3 Duct11 6. 1.750 2.158 04 0 1.750 .7 Duct7 1.750 0 0 25 3.600 3.600 0 9 .6 0. 9 .6 24 3.600 6.100 2. 2. 0. 3.389 38 .111 2. 6.100 3.389 38 11 2. 6.100 2. 11 2. 8 59 8 1 59 8.050 3.389 38 1 59 2.250 5. Duct4 9 2.250 5. Duct12 9 8 9 3.810 2.250 5. Duct8 0.400 2.742 28 3.810 28 3.810 28 9 0.400 2.742 9 2.742 0.400 14 14 14 9 3.190 3.190 0.401 0. 0.750 0.401 0. 0.750 3.190 1.1590.2 1.1590.2 Refuge1 0.401 0. 0.750 1.911 0 1.911 2. 1.911 1.1590.2 72 77 2.760 0.389 77 2.760 2. 1.098 1.085 0.389 1.098 1.085 3. 72 77 2.760 3. 6.070 6.070 0.389 1.098 1.085 2.059 72 2.059 21 0 0.630 21 0.630 21 0 2.059 0.630 1.120 8 5 1. 1.120 8 1. 5 2. 1.390 0. 5 1.120 1. 1.390 1.991 5.103 00 3.6 10 1.991 5.103 0. 8 1.390 4.840 0.716 0 94 4.840 0.716 00 3.6 00 1.991 5.103 4.840 0.716 3. 0. 00 3.6 10 2.720 1.450 0 2. 94 50 2.720 1.450 94 0 2. 0 00 0 0 2. 0 0 2.720 1.450 05 5.300 1.450 0 06 14 0 00 2. 5.300 1.450 0 3. 06 14 3. 1 0 05 5.300 1.450 0 2. 0 06 14 1.524 0. 1.524 0 0. 1.524 0. 3. 0 .9.3 1 1.380 63 1.380 2.049 2.049 0 .9.3 1 63 1.380 2.049 63 0 .9.3 1 0 1. 0 0 0 1.380 1. 9605 .4 1.380 9605 .4 0 1. 05 1.380 3. 1.390 3. 1.390 9605 .4 30 30 1.390 7.870 0. 05 1.450 0. 05 8.050 7.870 0. 30 0 1.3705.261 0 1.3705.261 0 50 75 3. 75 1.3705.261 5 0 0.630 0.630 75 0.630 1.990 0 5 1.990 0 BUILT-UP AREA CALCULATION 1.990 0.750 Duct1 0 0.750 Duct2 3.190 3.040 Duct10 0.750 Duct6 3.190 2.140 0 2.140 2.140 2. 0. 2. 0. 75 STILT-GROUND FLOOR WING B 50 3. 75 75 4.170 3. 75 0 0. 2. 81 2. 3. 75 7 3.810 0 81 3.810 2. 0 81 3.810 0 0 0.998 90 0.998 0 90 2. 0.998 2.250 0 0 90 BUILT UP AREA CALCULATION 0 0 81 2.250 3.601 3.751 2.100 2.100 FOR STILT-GROUND FLOOR WING B 3.601 2. 8 2.100 2.281 3.600 1.750 1.750 7. 2.147 3.423 2.538 1.750 2. 2.733 2.423 Area(Sq.M) 6.250 2.991 6.250 AREA NAME LENGTH WIDTH 0.750 3.600 3.049 0.750 6.250 3.049 52 0.750 3.049 2.900 2.900 BLOCK 8.050 6.070 48.861 1. 3 BLOCK AREA TOTAL =48.861Sq.M 2.900 52 28 3.050 2.720 2.750 2.750 2.750 4 0 2.720 3.050 3.050 2.720 2.720 3.050 TOTAL Deduction =0.000Sq.M 3.050 2.720 2. Net BuiltUp Area =48.861 Sq.M 2.720 3.050 0. 1. 14 BUILT-UP AREA CALCULATION TYPICAL 7TH TO 10TH-12TH TO 15TH FLOOR WING B BUILT-UP AREA CALCULATION 5TH FLOOR WING B BUILT-UP AREA CALCULATION 6TH-11TH FLOOR WING B 1 35 4 520 52 1 0. 0 .7 3. 3. 25 8 BUILT UP AREA CALCULATION 35 FOR 5TH FLOOR WING B BUILT UP AREA CALCULATION BUILT UP AREA CALCULATION FOR 6TH-11TH FLOOR WING B Area(Sq.M) FOR TYPICAL 7TH TO 10TH-12TH TO 15TH FLOOR WING B AREA NAME LENGTH WIDTH AREA NAME LENGTH WIDTH Area(Sq.M) 1. AREA NAME LENGTH WIDTH Area(Sq.M) BLOCK 63.479 41.058 884.964 53 BLOCK 63.479 41.235 905.001 BLOCK AREA TOTAL =884.964Sq.M BLOCK 63.479 41.235 903.390 8 BLOCK AREA TOTAL =903.390Sq.M 1 BLOCK AREA TOTAL =905.001Sq.M Duct13 - - 12.415 Refuge1 - - 27.290 5.15 Duct5 - - 12.415 Duct12 - - 12.415 Duct9 - - 12.415 Duct4 - - 12.415 Duct11 - - 15.801 Duct8 - - 12.415 0. Duct3 - - 15.801 Duct10 - - 12.274 Duct7 - - 15.801 14 1 25. .38 Duct2 - - 12.274 TOTAL Deduction =52.905Sq.M Duct6 - - 12.274 77 56 Duct1 - - 1.546 Net BuiltUp Area =832.059 Sq.M AP TOTAL Deduction =80.195Sq.M 2 2 2. 9 TOTAL Deduction =54.451Sq.M Net BuiltUp Area =823.195 Sq.M 55 Net BuiltUp Area =850.550 Sq.M 6. 1 2. M. 91 BE AP X D 2. 75 1. C 2. K 2. 9 . 9 B X . 60 I T X 92 42 0. 60 2. 1. 3 0 .6 VE 45 2. 38 87 AB DU 57 O FT CT 0 LO 1. BA 51 . 00 LC 1. AT. .W X2 . .9 0. 5. 20 TO X1 I. M 1 0 2. C 52 . 1.5 1 .8 3 0. 9 . X B 0. 318 PA SS CT 60 3. 9 8 AP DU 19 1. C.T 83 O 3. M. X1 I. 2. AT. 27 BE BUILT UP AREA CALCULATION AP 4. LIV 13 TO .2 2 64 IN X1 I. X D 1. FOR STILT-GROUND FLOOR WING B X G 2. .2 0 3. 05 72 B-WING (REFUGE FLOOR AREA) 2. B 75 E 90 0 AREA NAME LENGTH WIDTH Area(Sq.M) 6th & 11th Floor X D 17 BLOCK 36.667 33.444 268.548 3. 45 3. M. CT 6 BLOCK AREA TOTAL =268.548Sq.M 2.75 STANDARD ADDITION:- 2. BA 65 BE DU AP 5. 57 L X D CT TOTAL Deduction =0.000Sq.M X C. 2. T 32 1) 2.75 x 0.75 = 2.06sm. 1. 00 90 DU DU 3 Net BuiltUp Area =268.548 Sq.M 1 0.75 8 C 1. UT 0. 0. 15 . 2) 5.66 x 3.81 = 21.56sm. 57 KIT SS 20 IL .W 1. C.T X IT M 75 BE 0 3) 3.51 x 0.75 = 2.63sm. X 2. 20 O X1 I. .0 0. Y 1 X D 3. 5.66 4) 1.52 x 0.63 = 0.95sm. 45 . 2. .C .8 3 .9 50 45 5. 2. O VE M .W 50 . X0 1& 2. 65 FT AB 0. 91 1. AT. 20 TO G .7 2 5 PA VE 2 LO 1. UT X2 I. AB 22 IL .1 FRD 9 O 15 2 TOTAL = 27.20sm. SS . X ITY 3 FT 3.81 PA 0. 60 3. LIV LO 2. K AP 0 05 IN 48 IT 0. DU X G X 4. 2. CT 43 45 2. CALCULATION STILT-GROUND FLOOR WING B BUILT-UP AREA 3. BA 05 L 2. BA 74 X C. 1. C.T 48 L 3 1 3.51 P-LINE AREA 6th & 11th FLOOR = 850.64 - 27.20 = 823.44sm. 1. 00 20 O X2 I. .1 CT -2 X C. 1. 00 4.15 3 DU 3. BA 05 L 1.52 3 0.75 EL E. X C. 1. 00 3.2 0 3. LIV 19 2.0 0. 4. 4 0.63 05 IN X G FRD 3. M. 65 BE 0. 3. 1.099 0 85 00 3. BA 05 L 4. X D 407 38 0 X C. 43 2. 1. 00 D. -2 90 9 WING-B 2. BA 48 L F. AP 03. 9 51 0. X C. 19 0. 9 73 REFUGE AREA 6th & 11th FLOOR 1. 00 1. AT. 152 2. 7 20 TO 15 .02 80 P-LINE AREA DIAGRAM 48 KIT X 3. LIV 05 IN 7 CT X1 I. .8 3 0. 2.26 SC.1:100 2. 45 X G DU 2 4. 2. O VE 43 6. FT AB 6 1. UT 22 IL 30 LO M .W . 1. C.T X ITY 0. . .W 75 BE 5 9 0. 20 O X1 I. 60 1 M X D 3. 3.34 75 BE 91 1. C.T .8 .9 45 X D PA 20 O 3 .0 2. 3. X1 I. SS 45 SS 1. UT .8 2. . 30 IL X ITY 3 10 PA VE 0. 50 3. LIV 05 IN AB O BUILT-UP AREA CALCULATION T FT AP ST DU C 11 X G 4. LO 2. K 57 IT STILT-GROUND FLOOR WING B 43 AI AP X RC 2. 45 A .W . BUILT UP AREA CALCULATION Proforma I : Area Statement SE M FOR STILT-GROUND FLOOR WING B 1. 3. M. 1. Area of plot (Minimum area of a, b, c to be 52 50 27 BE 2. AT. .8 2 AREA NAME LENGTH WIDTH Area(Sq.M) REFUGE AREA @ 6th/11th/16th/21th/26th FLOOR 1. X D 13 TO X1 I. S. 3. LIV considered) or area of subplot with sanctioned layout No. 10743.000 1. 3. DU 1 05 IN BLOCK 12.505 11.235 48.922 53 CT 05 .2 0 PA X G and subplot No. CT S 4. 43 BLOCK AREA TOTAL =48.922Sq.M (a) As per ownership document (7/12, CTS extract) 10820.000 UP DU TOTAL Deduction =0.000Sq.M (b) as per TILR or City Survey measurement sheet 10820.000 2. C AP 50 52 . X B Net BuiltUp Area =48.922 Sq.M (c) as per Demarcated drawing area 11202.341 1. AP SE 0. 60 CT 1. C.T BALC. DU 20 O 3. BA 05 L LESS 2.57 X 1.00 ST 2. LIF 36 T X1 I. .8 X C. 1. 2.Area not in possession 0.000 AP AI 53 X -5 3 00 RC FRD 3. Entire area (1-2) 2. LIF 1. 1. 1. 97 10743.000 FRD 75 T 50 A 20 .V. X1 D 4.Deductions for - BED X -2 1. UT .W . KIT 2. L .3 9 22 IL (a) Proposed D.P./ D.P. Road widening Area /Service 2.75 X 3.45 15 X ITY M 2.57 X 2.45 52 1. 1. AT. 0. 91 522.000 1. 20 TO 60 0. VE Road / Highway widening BALC. BALC. T FRD X1 I. AB O 3.05 X 1.00 2.90 X 1.00 FIRE DU CT .8 3 PA FT (b) Any D.P. Reservation area 3863.000 C SS LO REFUGE AREA LIFT LOBBY FRD DU . 2. K 57 IT (c) Green Belt 0.000 AP LOFT ABOVE FRD UP 38.32sm. X Total (a+b+c) 4385.000 1. 2. 45 5 0 2. 5.Balance area of plot (3-4) 6358.000 PASS. 0.91 M.W. 3. M. 2. BA 57 L 0 88 6. Amenity Space 0.000 12 65 BE X C. 1. 00 81 75 9 0 2. (Applicable if (1) > 20000 sqmt - M.BED UTILITY X D 3. 75 1.12 X 0.60 2. 0. 3.65 X 2.90 LIVING BED 90 75 BE 0 (Required -(a) Upto 20000 sqmt - Nil - AT.TOI. C.TOI. 3.05 X 4.43 2.90 X 4.43 X D ST AI (b) Above 20000 sqmt - (a) + 5 % of Total area 0.000 1.20X1.83 1.20X1.83 LIFT-1 LIFT-3 LIFT-4 3. 45 R CA 2. 3. DUCT 2.15 X 2.45 2.15 X 2.45 2.15 X 2.45 2. SE 14 0 05 9 3. 7. Net Plot Area (5-6 ) 6358.000 2. LIV 0.75 0 0 0. 66 95 8. Recreational Open Space DUCT 90 IN AP CT 3. 0 75 0 - X G UP DU 50 60 1. 2. 0 (a) If area (6) is more than 4000 sqmt - 10 % of (6) is FRD 4. 0 39. 9 0 45 635.800 Adjoining A-Wing 43 AP E 3. 0 2. 190 63 0 required. AS 2. LIF 0 25 0. 0 0 1. 4.83 RC 36 T 4 X -5 15 Proposed___ 635.997 1. C.T FRD 2. LIF 75 T AI ST 1. 97 0 2. 35 0 1. 1.30.5 X -2 72 45 0. 26 (b) If area is less than 4000 sqmt -Check - - 74 480 5000 2. 20 O X1 I. 15 0 1. 0 2 05 1. 90. DU .8 3 2. BA 90 L FIRE CT 2. .4 3 46 i) If it is full number like 1,2,125,419,etc. As per 7.12 DUCT PASS. 1.52 M.W. CT . X C. 1. LIFT LOBBY DU UP FRD 1. 5 0 3. 0 abstract or City Survey Number - No Recreational open - FRD M .W 00 2. 0. 130 0 space is required 1. AT. .9 1 59 30 .8 83 TO S. 8 0 0 ii) If it is subdivision like 1/2 ,2/5 , 125/1 419/1 etc.then 11..6 X1 I. 0 3 2 1 PA 0 - F.D.-1 .2 0 S VE LIFT-3 LIFT-4 1. 688 508. 05 recreational open space is required. DUCT AB O 2.15 X 2.45 2.15 X 2.45 0 22 000 08 3. (A) 10 % Subject to minimum 200 sqmt 0.000 1.20X1.20 1. LO FT K FRD 6.25 1. 1. 1 Proposed ______________ 635.997 5 IT X 2. 1. 09 35 0 95 2.63 (B) Exemption to leave open space subject to availing AT.TOI. DUCT C.TOI. 81 C.B X . 60 95 1. 0 1. 20 2 4 - 1.20X1.83 1.20X1.83 LIVING LIVING C.TOI. DUCT AT.TOI. LIVING C.TOI. 0. 60 2. 4 5 00 3. basic F.S.I of 75 % M.BED 3.05 X 4.43 3.05 X 4.43 2.90 X 4.43 1. 0 (C) Exemption to leave open space subject to payment 3. 2 1.20X1.83 1.20X1.83 1.22X1.83 0 10 3.65 X 2.90 AT.TOI. 2. M. 68 Duct18 UTILITY M.BED 75 BE AP of 10 % land value of land at (7) as per annual - 1.12 X 0.60 3.65 X 2.90 1.83X1.20 X D 5. 2. 61 UTILITY C.B. 2. 91 2 statement of rate. 1.12 X 0.60 1.99 X 0.60 PASS. 0.91 M.W. Certificate of Area: PASS. 0.91 M.W. PASS. 0.91 M.W. 3. 1. Certified that the plot under reference was surveyed by me on AP 34 24 46 50 AP LOFT ABOVE M.BED 9 0 2025-08-01 and the dimensions of sides etc. of plot stated onplan are BALC. BALC. AP BALC. 952 3. 0 as measured on site and the area so worked out tallies with the area 3.05 X 1.00 3.05 X 1.00 LOFT ABOVE 2.90 X 1.00 LOFT ABOVE 2.75 X 2.91 18 .7 KIT 2 2. stated in document of Ownership/ T.P. Scheme Records/Land BED WING-B 7. 5. 0. 59 0 Records Department/City Survey records. 0. 494 2.75 X 3.45 2.57 X 2.45 KIT KIT 67 72 BED 3.050 2.720 9 2.57 X 2.45 2.75 X 3.45 2.45 X 2.60 TERRACE FLOOR PLAN 2.750 15 6 0 2. Signature 0.750 CARPET AREA STATEMENT(WING-B) 2.9000.523 36. 25 (Name of Architect/ Licensed Engineer/ Supervisor.) 2.158 04 0 Duct16 1.750 SC.1:200 6. Owner's Declaration - 3.600 AP (TYP.6th & 11th FLOOR) REFUGE 6.100 2. 0 9 .6 38 .111 BALC. 2. I/We undersigned hereby confirm that I/We would abide by plans 2.57 X 1.00 BALC. 3.389 8 59 approved by Authority / Collector. I/We would execute the structure AP RERA CARPET BALCONY 2.250 5. 9 AP FLAT No. Sq.Mt. Sq.Mt. 3.810 28 Duct17 as per approved plans. Also I/We would execute the work under 0.400 2.742 9 supervision of proper technical person so as to ensure the quality AP 14 3.190 0.401 0. 0.750 and safety at the work site. WING-B 1 37.67 3.04 1.911 1.1590.2 0 77 2.760 0.389 72 1.098 1.085 5 TYP. 6th & 11th FLOOR (REFUGE) 2.059 21 0.630 2. Owner (s) name and signature 1.120 8 1. 1.390 2 52.38 5.84 1.991 5.103 4.840 0.716 3. 0. 0 00 3.6 0 SC.1:100 2.720 1.450 94 10 0 Architect/ Licensed Engineer/ Supervisor name and signature 5.300 1.450 06 14 0 2. 0 00 05 Job No. 1.524 3 52.45 5.84 0. 3. 0 .9.3 1 1.380 2.049 63 9605 .4 0 1. 0 1.380 3. 1.390 4 66.24 8.67 7.870 0. 3005 1.3705.261 75 5 0 0.630 1.990 0 0.750 5 Duct14 Duct15 3.190 ---- ---- 2.140 2. 0 Postal Address : Mohan Sky Ville,Flat no-402,4th 0. 75 Floor,,Kalyan,Thane,Maharashtra-421301,KALYAN 6 54.79 5.74 3. 75 2. 81 3.810 0 0 0.998 0 90 7 53.01 5.83 2.250 3.601 2.100 2. DESCRIPTION OF PROJECT : 2.538 2.991 1.750 6.250 3.600 Type of Proposal : Mixed 0.750 3.049 8 38.52 2.90 2.900 BUILDING ON CTS. NO./SURVEY NO.-33 2.750 9 54.93 5.67 3.050 2.720 2.720 3.050 SITE ADDRESS : PROPOSED BUILDING ON S. No.33, 10 52.24 5.84 BUILT-UP AREA CALCULATION 4TH FLOOR WING B 11 52.24 5.84 BUILT UP AREA CALCULATION Name Of Architect : VIJAY R PANDEY FOR 4TH FLOOR WING B LOGO ADDRESS OF OFFICE 12 37.84 3.05 AREA NAME LENGTH WIDTH Area(Sq.M) OFFICE - BLOCK 63.479 41.235 903.390 303,Raj-kamal Tower,Above Kotak BLOCK AREA TOTAL =903.390Sq.M Mahindra Bank,Santoshi Mata Road,Kalyan-(W).421301 Duct18 - - 12.415 OWNERS SIGN - TECHNICAL PERSON SIGN Duct17 - - 12.415 Verified by applicant Duct16 - - 15.801 Duct15 - - 12.274 Duct14 - - 1.546 TOTAL CARPET AREA =552.31 x 2Fl.= 1104.62sm. TOTAL Deduction =54.451Sq.M SCALE - 1:100 Date: 10/09/25 Net BuiltUp Area =848.939 Sq.M JOB NO - KDMCC-24-ENTRY-127716 CHECK BY - - SUBMISSION DRAWING