ELITE STRUCTURES STRUCTURAL CONSULTANT CONSULTING ENGINEERS MOB-7387733660 69, BENGALPURA, BEHIND RADIANCE TAILOR, BHIWANDI. Annexure B FORM-2 [See Regulation 3] ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account – Project Wise) Date-31-03-2026 To, M/s M R DEVELOPERS H.no. 406, Flat No. 102, 1st Floor, Varsha Apartment, A-Wing, Kap Kaneri, Opp Gore Hospital, Bhiwandi Thane - 421302 Subject: Certificate of Cost Incurred for Development of “MULTANI RESIDENCY” having MahaRERA Registration Number P51700076655 being developed by M/s. M R DEVELOPERS. (For 01/01/2026 to 31/03/2026 i.e. Quarter 4 of F.Y 2025-2026) Sir, 1. I, Mr. Muavin M. Punjabi have undertaken assignment of certifying Estimated Cost for “MULTANI RESIDENCY” having MahaRERA Registration Number P51700076655 being developed by M/s. M R DEVELOPERS. 2. We have estimated the cost of Civil, MEP and allied works required for completion of the apartment and Proportionate completion of internal & external works of project as per specification mentioned in agreement of sale. Our estimated cost calculation is based on the drawing /plan made available to us for the project under reference by the developer/consultant. The schedule of item and quantity required for entire work as calculated by me, the assumption of cost of material, labour and other inputs made by developer, and the site inspection carried out by us to ascertain / confirm the above analysis given to us. ELITE STRUCTURES STRUCTURAL CONSULTANT CONSULTING ENGINEERS MOB-7387733660 69, BENGALPURA, BEHIND RADIANCE TAILOR, BHIWANDI. 3. We estimate Total Estimated Cost of completion of the aforesaid project under reference at 3,40,00,000/- (Total of Table A and B) at the time of Registration. The estimated Total Cost of project is with reference to the Civil, MEP and Allied works required for completion of the apartments and proportionate completion of internal & external works. As per specifications mentioned in agreement of sale and for the purpose of obtaining occupation certificate / completion certificate for the Building(s) / Wing(s) Layout / Plotted Development from the Mumbai City Municipal Corporation being the Planning Authority under whose jurisdiction of the aforesaid project is being implemented. 4. The Estimated Cost incurred till date is calculated at Rs. 1,47,26,810/- (Total of Table A and Table B) the amount of Estimated Cost incurred is calculated on the basis input Materials/services used and unit cost of this item. 5. The Balance Cost of Completion of the Civil, MEP and Allied works for completion of the apartments and proportionate completion of internal & external works, as per specifications mentioned in agreement of sale, of the Project is estimated at Rs.1,92,73,190/- (Total of Table A and Table B) 6. I certify that the Cost of the Civil, MEP and allied works for completion of the apartments and proportionate completion of internal & external works, as per specifications mentioned in agreement of sale, of the aforesaid Project as completed on the date of this certificate is as given in Table A and B below: ELITE STRUCTURES STRUCTURAL CONSULTANT CONSULTING ENGINEERS MOB-7387733660 69, BENGALPURA, BEHIND RADIANCE TAILOR, BHIWANDI. TABLE A Building: MULTANI RESIDENCY Sr. Particular Amount (in Rs.) No 1. Total Estimated Cost of the Building/Wing/ Layout/Plotted 3,06,00,000/- Development as on date of Registration is 2. Cost incurred as on date certificate 1,47,26,810/- 3. Work done in Percentage (as Percentage of the 48.13% estimated cost) 4. Balance Cost to be Incurred** (Based on Estimated Cost) 1,58,73,190/- 5. Cost Incurred on Additional /Extra items not included in the Estimated Cost (Table -C) ELITE STRUCTURES STRUCTURAL CONSULTANT CONSULTING ENGINEERS MOB-7387733660 69, BENGALPURA, BEHIND RADIANCE TAILOR, BHIWANDI. TABLE B Internal & External Development Works in Respect of the Registered Phase Sr. Particular Amount (in Rs.) No 1. Total Estimated Cost of the Internal & External Development Works including amenities and Facilities in the layout as on 34,00,000/- date of Registration is 2. Cost incurred as on date certificate - 3. Work done in Percentage (as Percentage of the estimated cost) - 4. Balance Cost to be Incurred** (Based on Estimated Cost) 34,00,000/- 5. Cost Incurred on Additional /Extra items not included in the - Estimated Cost (Table -C) Yours Sincerely, Agreed and Accepted by: For M/S. M R DEVELOPERS MUAVIN Digitally signed by MUAVIN MUNAF Partner PUNJABI MUNAF DN: cn=MUAVIN MUNAF PUNJABI, o, ou, email=muavinpunjabi42 Farzana Digitally signed by Farzana Rehan Multani DN: c=IN, o=Personal, title=4398, pseudonym=ecnvay016whmrsp8jfbxiog4t 5239zql, Rehan 2.5.4.20=2fbcbe03226c0eb25719481c1b8 PUNJABI @gmail.com, c=IN 46a789df8f4f0e64d99b8700cdf6ea6cf2887 Date: 2026.06.10 , postalCode=421302, st=Maharashtra, serialNumber=32b4fc08516853e5c7f4248 10:03:38 +05'30' Multani 1a13bcd7d0c8a17f179e215191dc5dbad90 f52df3, cn=Farzana Rehan Multani Date: 2026.06.10 17:03:09 +05'30' Mr. Muavin M. Punjabi Signature of Promoter (LICENSE NO – STATE/R/2025/APL/16180) Name: Farzana Rehan Multani Date: 31/03/2026 Date: 31/03/2026 ELITE STRUCTURES STRUCTURAL CONSULTANT CONSULTING ENGINEERS MOB-7387733660 69, BENGALPURA, BEHIND RADIANCE TAILOR, BHIWANDI. Table C List of Extra/Additional/ Deleted Items considered in Cost (Which were not part of the original Estimate of Total Cost) Sr. No. List of Extra/Additional /Deleted Items Amount (In Rs.) 1. NIL 2.