FORM 1 ARCHITECT’S CERTIFICATE (As on 30/06/2025) Date : 14.07.2025 To, M/S REAL HOMES DEVELOPERS 311, Omega Business Park, Opp. Esic Hospital, Rd. No. 33, Wagle Estate, Thane (W) – 400604. Subject : Certificate of Percentage of Completion Work of Redevelopment Project of SOLANKI CO-OP. HSG. SOC. LTD., having MahaRERA Registration number P51700076642, being developed by M/S REAL HOMES DEVELOPERS. Sir, I AR. JITENDRA MUKADAM, Partner in GODBOLE MUKADAM & ASSO. have undertaken assignment as Architect of certifying Percentage of Completion of Construction Work of Redevelopment Project of Solanki Co-Op. Hsg. Soc. Ltd., having MahaRERA Registration number P51700076642, being developed by M/s Real Homes Developers. Based on Site Inspection, with respect to Layout / each of the Building / Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the Building / Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in table B. PARESH Digitally signed by PARESH DEODAS DEODAS CHALKE Date: 2025.07.14 CHALKE 12:01:26 +05'30' TABLE A Building ‘A’ Percentage of Actual Work Sr. No. Task / Activity Done (1) (2) (As on date of the certificate) (3) 1. Excavation 100 % 2. Basements (if any) N.A. 3. Podiums (if any) N.A. 4. Plinth 100 % 5. Stilt Floor 100 % 6. Slabs of Super Structure (7 out of 11 nos.) 63 % Internal walls, Internal Plaster, Flooring, Doors 7. 0% and windows within Flats / Premises 8. Sanitary Fittings within the Flat / Premises 0% Staircase, Lift Wells and Lobbies at each Floor 9. 0% level, Overhead and Underground Water tanks External plumbing and external plaster, 10. elevation, completion of terraces with 0% waterproofing of the Building / Wing. Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment / CRZ NOC, Finishing to entrance lobby/s, plinth 11. 0% protection, paving of areas appurtenant to Building / Wing. Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. PARESH Digitally signed by PARESH DEODAS CHALKE DEODAS Date: 2025.07.14 12:01:14 CHALKE +05'30' TABLE B Common Areas (Internal and External Development Works) in respect of the Registered Project Percentage of Actual Sr. Common areas and Proposed Work Done Details No. Facilities (Yes / No) (As on date (5) (1) (2) (3) of the Certificate) (4) 1. Internal Roads & Footpaths No - - Will be connected 2. Water Supply Yes 0% to TMC water supply line. Will be Sewerage (Chamber lines, connected 3. Yes 0% Septic Tank, STP) to TMC sewer line. Will be connected 4. Storm Water Drains Yes 0% to TMC storm water drains. No landscaping. Landscaping & Tree Trees will be 5. No 0% Planting planted as per Garden dept. NOC. Campus 6. Street Lighting No - lighting only Society 7. Community Buildings Yes 0% office, Fitness Centre PARESH Digitally signed by PARESH DEODAS CHALKE DEODAS Date: 2025.07.14 12:01:00 CHALKE +05'30' proposed. Will be connected Treatment and disposal of 8. No - to TMC sewer sewage and sullage water line without treatment. Solid Waste management 9. No - - & Disposal Bore-well Water conservation / Rain recharging 10. Yes 0% water harvesting with filtration pits. Solar water heating 11. Energy management Yes 0% system will be proposed. Fire protection and fire As per CFO 12. Yes 0% safety requirements norms. Electrical meter room, sub- Meter room 13. Yes 0% station, receiving station proposed. Yours Faithfully, AR. Jitendra Mukadam (License No. CA/92/14751) Agreed and Accepted by : Digitally signed by PARESH DEODAS PARESH DEODAS CHALKE CHALKE Date: 2025.07.14 12:00:41 +05'30' Signature pf Promoter Name : M/s Real Homes Developers Date : 14.07.2025