a ant una ff. uctures( LU ENGINEER'S CERTTFICATE LU z Ref: ES-20 Date: 31-03 ^2025. o To, z LU Aashapura Developers Bhim Kene Chawl, Aayre gaon,opp diva vasai railway, J Dombivli East-421201. E. Sutlj ect: Certificate of Percentage of Completion of Construction Work of " HR heights. " of the 3 Project [MahaRERA Registration Number P51700076610 situated on the Plot bearing CTS no. F 2320,2321,2326,2327,2328, mouje: Aayre, Dombivli (E), Tal. Kaylan. Admeasuring 357.70 sq.mts. Area being developed by Mis Aashapura Developers. O :) Sir, tr F I Aditya Rajan Deshmukh have undeftaken assignment as Architect of Cerlitying Percentagc of a Completion of Construction Work of o'HR heights" Building of the Project lMahaRERA Registration Number Psf 700076610 situated on the Plot bearing CTS no. o 2320,2321,2326,2327,2328, mouje: Aayre, Dombivli (E), Tal. Kaylan. Admeasuring 357.70 Z sq.mts. Area being developed by M/s Aashapura Developers. l. Following technical professionals are appointed by Promoter: - J (i) Shri. Shreyas Sharad Brid as Architect (COA no. CA/20191107490); O (ii)Shri. Aditya Rajan Deshmukh as Structural Consultant; (, 1. We have estimated the cost of the cornpletion to obtain Occupation Certificate/ Cornpletion z Certificate, of the Civil, MEP and Allied works, of the building(s) of the tr J Project. Our estimated cost calculations are based on the Drawings/plans made Available to us for the project under reference by the Developer and Consultants and The Schedule of items and quantity a =) for the entire work as calculated by Developer/ Er-rgineer, and the Assumption of the cost of material, z labor and other inputs made by dcveloper, and the Site inspection carried out by us. o 2. We estimate Total Estimated Cost of cornpletion of the building(s) of the aforesaid O Project under reference as Rs. 4.70 Cr (Total of Table A and B). The Estimated Total Cost of project is with reference to the Civil, MEP and allied works required to be completed for the purpose of ...!*i+ f I U) E, obtaining occupation ceftificate / Cornpletion certificate for the building(s) frorn the Kalyan Dombivli tU Municipal Corporation bcing thc Planning Authority under whose jurisdiction the atbresaid project tU Z is being implcmented. (, 3. The Estimated Cost Incurred till date is calculated at Rs.1,97,10,000. (Total of Table A & B) The zr.u arnount of Estimated Cost Incurred is calculated on the base of amount of Total Estimated Cost. J 4. The Balance cost of Completion of the Civil, MEP and Allied works of the building(s) of the t sr"rbject project to obtain Occupation Certificate /Completion Certificate fi'om Kalyan Dombivli Municipal Corporation (planning Authority) is estimated atRs.2,72,90,000. (Total of Table A and F =) B). O 5. I certifz that the Cost of the Civil, MEP and allied work for the aforesaid Project 3 as Completed on the date of this cerlificate is as given in Table A and B below: E. Table A F a Building called "HR Heights" o Sr. Particulars Amounts z No I Total Estimated cost of the building/wing as on 3l-03-2025 date of Rs.4,38,00,000. i- J Registration is 2 Cost incured as on 3l-03-2025 (based on the Estimated cost) Rs.1,97,10,000. /- o J Work done in Percentage (as Percentage of the estimated 450 o cost) z 4 Balance Cost to be Incurred (Based on Estimated Cost) Rs. 2,40,90,000. /- tr J 5 Cost Incumed on Additional lExtra items as on 31-03-2025 not Rs.0/- included in the Estimated Cost (Annexure A) :) a Z o O '"i$a a tLT Table B tU Building called "HR Heights" Z o Sr. Particulars Amounts z LU No I Total Estimated cost of the Internal and External Development Rs. 32 lakhs/- J Works including amenities and Facilities in the layout as on 3l-03-2025 date of Registration is E 2 Cost incured as on 3l-03-2025 (based on the Estimated cost) Rs.0.00 lakhs /- :) F J Work done in Percentage (as Percentage of the estimated cost) 0% C) 3 4 Balance Cost to be Incurred (Based on Estimated Cost) Rs. 32 lakhs /- M Cost Incurred on Additional /Extra items as on 31-03-2025 not F 5 Rs. 0 /- a included in the Estimated Cost (Annexure A) o z Yours Faithfully, ('.\ J Y} ADITYA RAJAN DESHMUKH O STRUCTURAL ENGINEER sTATE/R/2023/APL/05005 (, Aditya Rajan Deshrnukh. Z Jay AshaPura Developers F J f a -hrn* Mar, HotoisOhond".ro l1l. kene z Stlo A laoc-g o O t"l+:p l