0n DESIGN STUDIO orchitecture & interior ARCH ITECT'S CERTI FICATE Dote: 3111212024 To, Aoshopuro Developers Add: - Bhim Kene Chowl, ooyre goon,opp divo vosoi roilwoy, Dombivli Eost-42l20l . Subject: Certificoie of Percenloge of Completion of Conslruction Work of "HR heights." of the Project [MohoRERA Regislrolion Number P51700076610 situoted on the Plot beoring CTS no. 2320,2321,2326,2327,2328 mouje: Aoyre, Dombivli (E), Tol. Koylon. Admeosuring 357.70 sq.mls. Areo being developed by M/s Aoshopuro Developers. Sir, I Shreyos Shorod Brid hove undertoken ossignment os Architect of Certifying Percentoge of Completion of Construction Work of "HR heighls" Building of the Project [MohoRERA Registrotion Number P51700076610 situoted on lhe Plot beoring CTS no. 2320,2321,2326,2327,2328, mouje: Aoyre, Dombivli (E), Tol. Koylon. Admeosuring 357.7O sq.mts. Areo being developed by M/s Aoshopuro Developers. 1. Following technicol professionols ore oppointed by Promoter:- (l )Shri. Shreyos Shorod Brid os Architect (COA no. CA/2019 /107 490), (2)Shri. Aodityo Deshmukh os Structurol Consultont, Bosed on Site lnspection, with respect to eoch of the Building of the oforesoid Reol Estote Project, I certify thot os on the dote of this certificoie, the Percentoge of Work done for eoch of the building of the Reol Estote Projeci os registered vide number P51700076610 under MohoRERA is os per toble A herein below. The percentoge of the work executed with respect to eoch of the octivity of the entire phose is detoiled in Toble B. 702, lmperiat Park, Near Rushabh Dairy Gandhinagar, Dombivti (E) 4212M Dist. Thane, Tat. Kalyan Mobite : +91 85913 01611 | +91 99309 18891 E-mait : rsarchitects23@gmait.com Toble A Building Sr. No Tosks /Activity Percenloge of work done I Excovotion 100% 2 Bosement NA 3 Podiums NA 4 Plinth 100% 5 Stilt Floor 100% 6 Slobs of Super Structure \00% 7 lnternol wolls, lnternol Ploster, Floorings wiihin 30% Flots/Premises, Doors ond Windows to eoch of the Flot/Premises B Sonitory Fittings within the Flot/Premises, Electricol Fittlngs 0 within the Floi/Premises I Stoircoses, Lifts Wells ond Lobbies ot eoch Floor level 30% connecting Stoircoses ond Lifts, Overheod ond U nderground Woier Tonks. t0 The externol plumbing ond externol ploster, elevotion, 30% completion of ierroces with woterproofing of the Building/Wing. lt lnstollotion of lifts, woter pumps, Fire Fighting Fittings ond 0 Equipment os per CFO NOC, Electricol fittings to Common Areos, electro, mechonicol equipment, Complionce to conditions of environment /CRZ NOC, Finishing to entronce lobby/s, plinth protection, poving of areos oppurtenont to Building/Wing, Compound Woll ond oll other requirements os moy be required lo complete project os per specificotions in ogreement of sole. Any other octivities. TABTE-B lnlernol & Externol Developmenl Works in Respeci of the entire Registered Phose S.No Common oreos Proposed Percentog Detoils ond Focilities, (Yes/No) e of Work Amenities done I lnternol Roods &Footpoths NA NA NA 2. Woter Supply YES 0 Woter connection will be given by KDMC ofter OC Seweroge (chomber, lines. YES 0 Seweroge Sholl be Septic Tonk,STP) corried out os per NOC 4. Storm Woter Drolns YES 0 Sholl be corried out osper NOC C J. Londscoping & Tree Plonting YES 0 Sholl be corried out os per NOC 6. Street Liqhtinq NO NA NA 7. Community Buildings NO NA NA a Treotment ond disposol of NO NA NA sewcqe ond sulloge woter. 9. Solid Woste monogement & NO NA NA Disposol 10. Woter conservotion, Roin YES 0 Sholl be corried out woter horvestinq os per NOC il Enerqv monooemenl NO NA NA 12. Fire protection ond fire sofety YES 0 Sholl be corried reouirements out os per NOC r3. Electricol meter room, sub- YES 0 As instructed By stotion receiving stotion MSEB 14. Others IOption to Add more) Yours Foithfully, Signoture & Nome AR. SHREYAS S. BRIO coA/2019/t 07490 Agreed ond Accepied by: JaY AohaPura liCIvoloFrers --ry Partne Signoture of Promoter Nome: l\nc. Ha.riahoha,odtq W' Kene Dote: gtlvleoa4