a 212. Mahant Chanrbers. Road no. 34, Wagle lndustrial Estate. Thane (W 400604 x. E ma il - structu res@entechconsulta nt. com G STI N- 27ASVP D0 657 P 1 Z0 ENGINEER'S CERTIFICATE LU LU z Date: 3l-07-2024 o To, Aashapura Developers Z Bhim Kene Chawl, LU aayre gaon,opp diva vasai railway, J Dombivli East-421201. Subject: Certificate of Percentage of Completion of Construction Work of "HR heights." of x. the Project [MahaRERA Registration Number P51700076610 situated on the Plot bearing CTS no. 2320,2321,2326,2327,2328, mouje: Aayre, Dombivli (E), Tal. Kaylan. Admeasuring :) F (J 357.70 sq.mts. Area being developed by M/s Aashapura Developers. Sir, :f I Aditya Rajan Deshmukh have undeftaken assignment as Architect of Certifying Percentage tF of Cornpletion of Constrr,rction Work of "HR heights" Building of the Project [MahaRERA Registration Number P51700076610 situated on the Plot bearing CTS no. a 2320,2321,2326,2327,2328, mouje: Aayre, Dombivli (E), Tal. Kaylan. Admeasuring 357.70 sq.mts. Area being developed by M/s Aashapura Developcrs. o z l. Following technical professionals are appointcd by Promoter: - (i) Shri. Shreyas Sharad Brid as Architect (COA no. CA/20191107490); J (ii)Shri. Aditya Rajan Deshmukh as Structural Consultant; 1. We have estimated the cost of the completion to obtain Occupation Certificate/ Completion () Certificate, of the Civil, MEP and Allied works, of the building(s) of the (, z Project. Our estimated cost calculations are based on the Drawings/plans made Available to us for the project under ref'erence by the Developer and Consultants and The Schedule of iterns and tr J quantity for the entire lvork as calculated by Dcvclopcr/ Enginccr, and thc Assumption of thc cost :) of material, labor and other inputs made by developer, and thc Site inspection carried out by us. a 2. We estimate Total Estimated Cost of cornpletion of the building(s) of the aforesaid Z Project under reference as Rs. 4.70 Cr (Total of Table A and B). The Estirnated Total Cost of project o (J rs wtth reterence to the Civil, MEP and allied works required to be completed fbr the purpose of obtaining occupation cerlificate / Completion certiflcate tbr the building(s) from the Kalyan '''!$* EI a enn trlth, glrl t Atruitu rrl lnlln..rl t LU Dombivli Municipal Corporation being the Planning Authority under whose jurisdiction the aforcsaid project is being implemented. LU z 3. The Estimatcd Cost Incurred till date is calculated at Rs. 65,70,000 (Total of Table A & B) The o amount of Estimated Cost Incurred is calculated on the base of amount of ztU Total Estirnated Cost. 4. The Balance cost of Completion of the Civil, MEP and Allied works of the building(s) of the J subject project to obtain Occupation Certificate /Completion Cerlificate from Kalyan Dombivli Municipal Corporation (planning Authority) is estimated at Rs. 4,04,30,000 (Total of Table A and x. B). F =) 5. I certify that the Cost of the Civil, MEP and allied work for the aforesaid Project O as Completed on the date of this certificate is as given in Table A and B below: f Table A x. F Building called "HR Heights" a Sr. Particulars Amounts o No Z I Total Estimated cost of the building/wing as on 3l-07-2024date Rs. 4,38,00, 000.Cr /- of Registration is J 2 Cost incurred as on 3l-07-2024(based on the Estimated cost) Rs. 65,70,000 /- J Work done in Percentage (as Percentage of the estimated t5% O cost) o Z 4 Balance Cost to be Incurred (Based on Estin,ated Cost) Rs. 3,72,30,000 Cr /- F J 5 Cost Incumed on Additional /Extra itcms as on 3l-07-2024not included in the Estimated Cost (Annexure A) Rs. 0 /- 3 a Z ) o O EI a 2i2. Mahant Chambers. Road nr:. 34. \Alagle lndirstrial Estate, Thane (W) - 401 604 x LU Email- structures@entechconsulta nt. comGSTl N- 27ASVPD0 657 P 1ZA Table B LU z Building callcd "HR Hcights" o Sr. Particulars Amounts z LU No I Total Estimated cost of the lnternal and External Development Works Rs. 32 lakhs/- J including amenities and Facilities in the layout as on 3l-07-2024date of Registration is E 2 Cost incurred as on 3l-07-2024(based on the Estimated cost) Rs. 0.00 Cr /- f F J Work done in Percentage (as Percentage of the estimated 0y, O cost) 3 4 Balance Cost to be Incurred (Based on Estimated Cost) Rs. 32 lakhs/- & Cost Incumed on Additional /Extra items as on 31-07-2024not included Rs. 0/- F 5 a in the Estimated Cost (Annexure A) o z Yours Faithfully, {ir' \/ \\ J V ADITYA RAJAN DESHMUKH STRUCTURAL ENGINEER o STATE/FU2O23/AP UO5005 Signature & Name (, z Jay Ashapura Developers tr J rtne 3 M