.tIUu I I ,:.,.j i,rln I :,,r \ ltr r1;,rr alr,1.^r ENGIN EER'S CERTIFICATE Ref: ES-20 Date: 8-03-2024. To. Aashapura Developers Add: - Bhirr.r Kene Chawl, aayre gaon.opp diva vasai railway. Dombivli East-421201. Subject: Certificate of Percentage of Completion of Construction Work of " HR heights." of the Project [NIahaRERA Registration Number situated on the Plot bearing CTS no. 2320,2321,2326,2327,2328, mouje: Aavre, Dombivli (E), Tal. Kaylan. Admeasuring 357.70 sq.mts. Area being developed by M/s Aashapura Developers. Sir, I Aditya Rajan Deshmukh have undcftaken assignment as Architect of Ccrlifying Perccntagc of Completion of Construction Work of "HR heights" Building of the Project IMahaRERA Registration Number situated on the Plot hearing CTS no. 2320,2321,2326,2327,2328, mouje: Aayre, Dombivli (E), Tal. Kaylan. Admeasuring 357.70 sq.mts. Area being developed by M/s Aashapura Developers. l. Following technical prof-cssionals are appointcd by Promoter: - (i) Shri. Shreyas Sharad Brid as Architect (COA no. CA/2019 10'7490), (ii)Shri. Aditya Rajan Deshrnukh as Structural Consultant; I . We have estimated the cost of the completion to obtain Occupation Certiflcate/ Completion Certificatc, of thc Civil, MEP and Allicd works, of the building(s) of the Project. Our estirnated cost calculations are based on the Drawings/plans made Available to us fbr the project under ret'erence by the Deleloper and Consultants and The Schedule of items and quantity fbr the entire work as calculated by Developer/ Engineer, and the Assumption of the cost of material, labor and other inputs made by developer, and the Site inspection carried out by us. 2. We estimate Total Estimated Cost of completion of the building(s) of the aforesaid ''1*;* I I Projcct under relerence as Rs.4.70 Cr (Total of Table A and B). The Estimated Total Cost of prqcct is with rct-crcncc to thc Civil. MEP and allicd rvorks rcquircd to bc complctcd tbr thc purposc of obtaining occupation ccrlificatc i Complction ccrtificatc fbr thc building(s) from thc Kalyan Dombivli Municipal Corporation being the Planning Authority under whose jurisdiction the aforesaid project is being implernented. 3. The Estimated Cost Incurred till date is calculated at Rs.4.70 Cr (Totalof Table A & B) The amount of Estirnatcd Cost Incurrcd is calculatcd on thc basc of amount of Total Estimated Cost. 4. The Balance cost of Completion of the Civil, MEP and Allied works of the building(s) of the subject project to obtain Occupation Cerlificate iCompletion Certificate from Kalyan Dombivli Municipal Corporation (planning Authority) is cstimatcd at Rs. ,1.70 Cr (Total of Table A and B). 5. I cerlify that the Cost of the Civil. MEP and allied work lor the aforesaid Project as Cornpleted on the date of this certif-icate is as given in Table A and B below: Table A BLrilding called "HR Heights" Sr. Particulars Amounts No I Total Estirnated cost of the building/wing as on 0810312024 date of Rs. 4.70 Cr / Registration is 2 Cost incurred as on 0810312024 (based on the Estimated cost) Rs. 0.56 Cr /- 3 Work done in Percentage (as Percentage of the estimated t0% cost) 4 Balancc Cost to be lncurrcd (Bascd on Estimated Cost) Rs. 4.70 Cr / 5 Cost Incurred on Additional /Extra items as on 08/03/2024 not Rs. 4.70 Cr /- included in the Estimated Cost (Annexure A) ''-$* 'tllll I I Table B Building callcd "HR Hcights" Sr. Particulars Amounts No 1 Total Estimated cost of the lnternal and External Development Rs. 32 lakh'- Works including arnenities and Facilities in the layout as on 08/03 2014 date of Registration is 2 Cost incurred as on 0810312024 (based on the Estimated cost) Rs. 0.00 Cr /- J Work done in Percentage (as Percentage of the estimated 00 cost) 4 Balancc Cost to be Incuncd (Bascd on Estimatcd Cost) Rs. 32 lakh, 5 Cost Incurred on Additional /Extra itcms as on 08/03i202r1 not Rs. 32 lakh,'- included in the Estimated Cost (Annexure A) Yours Faithtully, DeveloPBrs'r JaY AshaPura ADITYA RAJATI DESiIMUKiI STRUCTURAL CONSULIANT xrllt"c. UCENSE tlo. 480 LTr,onr Aditya Rajab Deshmukh. -'15a tl