ANNEXURE A FORM-2A [See Regulation 3A.] ENGINEER'S CERTIFICATE FOR QUALITY ASSURANCE (Site Supervisor's Certificate) (To be submitted at end of the Financial Year) Date: 31/03/2026 To, The Partners SIDDH ENTERPRISES, Shop No 15, Prakash Trading, New Zunzarrao Building, Shivaji Path, Station Road, Kalyan west - 421301 Quality Assurance Certificate (Certificate No. 1 for the year ending 2026) Subject : Certificate for quality of materials used and quality of construction and workmanship for the work of Royal Meadows, having MahaRERA Registration Number P51700066576 being developed by M/s Siddh Enterprises. Sir, I / We Nitish Prakash Dalvi have undertaken the assignment of supervision of this real estate project. Our Responsibility. To carry out the work in accordance with the development permission and as per the approved plan, to submit certificate of supervision of work, to carry out material testing in-situ or in an authorized laboratory as per prevailing and applicable standards, to ensure quality of work and workmanship as per prescribed specifications, and as per NBC and / or other relevant code of practice. The details of the quality are as follows : 1. Structural Design, Stability and Testing Sr. Parameters Yes No Remarks No. Whether soil investigations of the site has been conducted before 1 the structural design and soil parameters have been accounted for YES in the structural design/ drawings? Whether Structural Engineer has been appointed for the project? Name: Umesh Joshi 2 License No: STATE/R/2024/APL/10969 YES Mobile: 9702282386 E-mail: umesh@asc.org.in Whether the inspection registers, site order book and quality 3 control test registers are maintained at the site properly and YES endorsed by the Engineer-in-Charge? Whether testing facilities to check quality of material is available 4 at site? YES Sr. Parameters Yes No Remarks No. Whether the statutory provisions for disaster resistance/ 5 earthquake resistant design have been incorporated, specially in YES case of multi-storeyed construction? Has suitable cognizance been taken on demarcated flood lines and 6 appropriate precautions taken for protecting the site from flooding YES considering local flooding issues? 2. Input Materials Sr. Parameters Yes No Remarks No. Whether the following building materials confirm to relevant IS/BS/NBC Code, or as per Industry Standards? If yes, provide details: 1 (a) Cement, concrete and coarse aggregate YES (b) Steel and its alloys (c) Electrical wire, fittings and accessories (d) Plumbing and sanitary fittings Whether regular tests of materials and construction products are 2 being done from accredited labs also? If yes, details of such labs YES Whether manufacturer test certificate for cement, steel, pipes etc. 3 have been obtained and whether supply records are being YES maintained? Whether suitable water is being used for construction? (i) What is the source of water? 4 (ii) Has water been tested and approved by Engineer-in-Charge YES before construction? (iii) Has water been tested subsequently as per requirement? 3. Quality of Workmanship Sr. Parameters Yes No Remarks No. Whether works of all the electrical wiring/ connections/ lift installation / other electrical installations have been carried out 1 under authorized /registered electrical engineer and whether YES records of the same has been maintained? Whether all related works of plumbing & sanitary including installation of water supply systems, drainage systems, sewage 2 systems, sinks, toilets etc. have been carried out under authorized YES /registered plumbers / sanitary contractors and whether records of the same has been maintained? Whether all the work is being carried out under supervision of experienced and skilled professional? Further, whether the 3 workmanship and quality is satisfactory and up to the mark and the YES work is within the acceptable and permissible limits of deviations as per relevant Code of Practice? Whether remedial measures are undertaken to prevent dampness 4 and leakages? If yes, provide details YES Whether safety precautions are undertaken during construction 5 activities for all type of workers? YES 4. Miscellaneous Sr. Parameters Yes No Remarks No. Whether third party quality inspection is being carried out on site 1 during/after completion of the works? YES If yes, provide details. 2 Whether anti-termite treatment has been undertaken for the soil? YES Whether fire-fighting arrangements has been undertaken under 3 supervision of fire consultant? YES Whether proper signages have been installed on site/ completed 4 building as per requirement? YES Whether precautions are undertaken to avoid air pollution during 5 construction? Please specify YES Whether records of all test reports / results have been properly kept in the prescribed formats and whether the same are available 6 at site for viewing by allottees and to be handed over to the YES association of allottees? Whether all relevant records including sanctioned building plans, utility drawings, various test reports / results have been properly 7 kept in the prescribed formats to be handed over to the association YES of allottees? Any innovative/ cost effective/ green technology has been used for 8 improving quality/energy efficiency? Please specify YES Yours Faithfully, Name: Nitish Prakash Dalvi Qualification : Bachelor of Engineering License No. (if any) : NA Phone No: 9920030881 Place: KALYAN Agreed and accepted by Signature of Promoter Name : VIHAANG GALA Date : 31/03/2026