Annexure A FORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: To, LODHA DEVELOPERS LIMITED MUMBAI CITY, MAHARASHTRA, 400001 Subject : Certificate of percentage of Work of completion of construction work of Crown Dombivli 4 having MahaRERA Registration Number P51700056338 (Only Applicable after project Registartion) being developed by LODHA DEVELOPERS LIMITED Sir, I/We PRADEEP KAMBLE have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of completion of Construction Work of Crown Dombivli 4 having MahaRERA Registration Number P51700056338 (Only Applicable after project Registration, being developed by LODHA DEVELOPERS LIMITED ) Based on Site Inspection,with respect to Layout / each of the Building/Wing of the aforesaid Real Estate Project I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A Layout/Building/Wing Number: Ruby F/NA Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (2) (3) 1 Excavation 100.00 2 Basements (if any) 0.00 3 Podiums (if any) 0.00 4 Plinth, 0.00 5 Stilt Floor 0.00 6 Slabs of Super Structure 100.00 7 Internal walls, Internal plaster, Floorings, Floors and windows within 36.00 Flats/Premises 8 Sanitary Fitting within the Flat/Premises 0.00 Page 1 of 3 Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) 9 Staircases, lifts Wells and Lobbies at each Floor level Overhead and 0.00 Underground Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.00 waterproofing of the Building/wing. 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 0.00 CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Layout/Building/Wing Number: Ruby G/NA Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (2) (3) 1 Excavation 100.00 2 Basements (if any) 0.00 3 Podiums (if any) 0.00 4 Plinth, 0.00 5 Stilt Floor 0.00 6 Slabs of Super Structure 100.00 7 Internal walls, Internal plaster, Floorings, Floors and windows within 36.00 Flats/Premises 8 Sanitary Fitting within the Flat/Premises 0.00 9 Staircases, lifts Wells and Lobbies at each Floor level Overhead and 0.00 Underground Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.00 waterproofing of the Building/wing. 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 0.00 CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Page 2 of 3 Table B - Common Areas (Internal and External Development Works) in respect of Registered Phase / Project Number) Sr.No Common areas and facilities Is Available Percentage of Actual Details (Yes / No) Work Done (As on date of the Certificate) (1) (2) (3) (4) (5) 1 Internal Roads & Footpaths Yes 0.00 0 2 Water Supply Yes 0.00 0 3 Sewerage (Chamber, Lines, Septic Tank , STP) Yes 0.00 0 4 Storm Water Drains Yes 0.00 0 5 Landscaping & Tree Planting Yes 0.00 0 6 Street Lighting Yes 0.00 0 7 Community Buildings Yes 0.00 share across multiple phase of project 8 Treatment And Disposal Of Sewage And Sullage Water Yes 0.00 0 9 Solid Waste Management And Disposal Yes 0.00 0 10 Water conservation /Rain water harvesting Yes 0.00 0 11 Energy managemcnt Yes 0.00 0 12 Fire protection and fire safety requirements Yes 0.00 0 13 Electrical meter room, sub-station, receiving station Yes 0.00 0 14 Aggregate area of recreational Open Space Yes 0.00 0 15 Open Parking Yes 0.00 0 Yours Faithfully PRADEEP KAMBLE Signature & Name (IN BLOCK LETTERS) of L.S/ Architect ( License No: CA/87/10471) Date of Certificate: Agreed and accepted by: Signature of Promoter Name: Lodha Developers Limited Date: Page 3 of 3