Kalyan Dombivli Municipal Corporation APPENDIX 'D-1' SANCTION OF BUILDING PERMISSION AND COMMENCEMENT CERTIFICATE Building Name : A (VINAYAK CONSTRUCTION ) Building Use : Name of PWork : A-1 (VINAYAK CONSTRUCTION ) Floor Name: GROUND PARKING FLOOR,FIRST FLOOR,SECOND FLOOR,THIRD FLOOR,FOURTH FLOOR,FIFTH FLOOR,SIXTH FLOOR,SEVENTH FLOOR,TERRACE FLOOR Building Name : B (VINAYAK CONSTRUCTION) Building Use : Residential Building Name of PWork : B-1 (VINAYAK CONSTRUCTION) Floor Name: GROUND PARKING FLOOR,FIRST FLOOR,TERRACE FLOOR 1. Road Width : 6.00 Mt. 2. Premium Area: 0.00 Sq Mt. 3. Ancillary Area : 1020.69 Sq Mt. 4. TDR Area : 0.00 Sq Mt. 5. Total built-up Area : 2604.30 Sq Mt. To, DHARMENDRA RAMKIRAT SINGH (Owner) Lodha,Dombivli Gopinath Narayan Gandhe (Lic:CA/77/04234 ) Architect 1,2 Parimal Darshan, plot no. 21, Gandhinagar, Dombivli East Sir, With reference to your application No. KDMCB/7006/2023/0034/AutoDCR (V.P.No.KDMCB/0009/2023/APL), dated 11 August, 2023 for the grant of sanction of Building Permission Commencement Certificate under Section 18/44 of The Maharashtra Regional and Town Planning Act, Maharashtra Regional and Town Planning Act, 1966 and under section 253, 254 of B.P.M.C. act 1949 to carry out development work / Building on Plot No.:-, Village:Galegaon, Survey No.:19/1, the Commencement Certificate/Building Permit is granted under Section 18/45 of the said Act, subject to the following conditions: Outward No. : KDMC/TPD/BP/2023-24/0009 Date : 29 November, 2023 Office Stamp. : Yours faithfully, Assistant Director Town Planning Page 1 of 3 OFFICE OF THE Kalyan Dombivli Municipal Corporation Building Permit No.: KDMCB/0009/2023/APL Digitally signed by DISHA PRABHAKAR SAWANT Date: 29 Nov 2023 13:54:40 Date: 09 November, 2023 Organization :Kalyan Dombivli Municipal Corporation Designation :Assistant Director Town Planning SANCTIONED Authority_Sign Signature of the Authority Page 2 of 3 Terms and Condition : 1. The land vacated in consequence of the enforcement of the set back line shall form part of the public street. 2. No new building or part thereof shall be occupied or allowed to be occupied or permitted to be used by any person until Occupancy permission has been granted. 3. The Development permission/Commencement Certificate shall remain valid for a period of one year commencing from the date of its issue. 4. This permission does not entitle you to develop the land which does not vest in you. 5. This permission is being issued as per the provisions of sanctioned Development Plan and Development Control Regulations. Any other statutory permission, as required from State and Central Govt. Departments/ undertakings shall be taken by the applicant. If any irregularity is found at later date, the permission shall stand cancelled. 6. Information Board to be displayed at site till Occupation Certificate. 7. If in the development permission reserved land/amenity space/road winding land is to be handed over to the authority in the lieu of incentive FSI, if any, then necessary registered transfer deed shall be executed in the name of authority with in 6 month from the commencement certificate. 8. All the provision mentioned in UDCPR,as may be applicable, shall be binding on the owner/developer. 9. Provision for recycling of Gray water , where ever applicable shall be completed of the project before completion of the building and documents to that if at shall be submitted along with the application form of occupancy. 10. Lift Certificate from PWD should be submitted before Occupation Certificate, if applicable. 11. Permission for cutting of tree, if necessary, shall be obtained from the tree authority. Also the certificate/letter for plantation of trees on the land, if required under the provision of tree act, shall be submitted before occupation certificate. 12. Authority will not supply water for construction. 13. Areas/cities where storm water drainage system exists or designed, design and drawings from Service consultant for storm water drainage should be submitted to the concerned department of the authority before Commencement of the work and completion certificate of the consultant in this regard shall be submitted along with the application for occupancy certificate. Page 3 of 3