FORM.2A [See Regulation 3A.] ENGINEERS'S CERTIFICATE FOR QUAL Y ASSURANCE (Site Su pervisor's Certificate) (To be submitted at the end of Financial year) Date:18t04t2025 To, The Jay Shree Krishna Enterprises B-105, Shree Suryadarshan CHS, Parsik Nagar, Kharigaon, Kalwa (W), Thane - 400605 Qual ity Ass u rance Certificate (Certificate No. .1...for the Year Ending 3i.t March 2025) Subject : Certificate for quality of materials used and quality of Construction and workmanship of the work of MARUTI HOMES having MahaRERA Registration Number P51700056264 belng developed by Jay Shree Krishna Enterprises Sir, lAlVe Raju Vasvani have undertaken an assignment of supervision of this real estate project Our Responsibility To carry out the work in accordance with the development permission and as per the approved plan, to submit ce(ificate of supervision of work, to carry out material testing in-situ or in an authorized laboratory as per prevailing and applicable standards, to ensure quality of work and workmanship as per prescribed specifications, and as per NBC and / or other relevant code of practice. The details of the quality are as follows : 1. Structural Design, Stability and Testing Sr. No. Parameters Yes/No Remarks I Whether soil investigations of the site has been Yes ts 2131 - 1981 conducted before the structural design and soil parameters have been accounted for in the structural desiqn/drawinqs? 2 Whether Structural Engineer has been appointed for Yes Name: Epicon Consultant Pvt.Ltd. the project? License No: State/R/2 022t APLI} 1 944 Mobile: 2225471144 E-mail: epicon.desion3@epicons.com J Whether the inspection registers, site order book Yes and quality control test registers are maintained at the site properly and endorsed r-y the Engineer-in- Charqe? 4 Whether testing facilities to check quality of material Yes Third Party Reports out sources is available at site? Page 1 of3 Sr. No. Parameters Yes/No Remarks 5 Whether the statuary provisions for disaster resrstance/earthq uake resistant desiqn have been Yes rncorporated, specially in case of multi_storeyed construction? o Has suitable cognizance been taken on demarcated Ilood ttnes and appropriate precautions taken for No protercting the site from flooding considering local flooding issues? 2. lnput Materials Sr. No. Parameters Yes/No Remarks 1 Whether the followlng building materials Contnnr to Yes relevant lS/BS/NBC Code, oras per lndustrv Standards? lf yes, provide cletails: (a) Cement, concrete and coarse aggregate Yes The material used in construction are as per the guidelines mentioned in the GFC drawing and specifications orovided bv Licensed Structural Consuliant. (b) Steel and its altoys Yes The material used in construction are as per the guidelines mentioned in the GFC drawing and specifications provided bv Licensed Structural Consultant. (c) Electrical wire, fittings anJ accessories Yes Work yet to start (d) Plumbing and sanitary fritings Yes Work yet to start 2 Whether regular tests of materials and construction products are being done from accredited labs also? Yes Micro Testing Lab solutions p.Ltd. lf yes, details of such labs Whether manufacturer test certificate for cement, Yes steel, pipes etc. have been obtained and whether !!!ply records are being maintarned? 4 Whether suitable water is l--:r-r' l::ed for Yes construction? i) What is the source of i,vaicr? Yes Borewell (ii) Has water been testecl :', I -, :roved bv Yes Tested periodically Engineer-in-Charge befcru c - -.:Jction? (iii) Has water been testeci si:l;:..irLten|y as per Yes requirement? 3. Quality of Workmanship Sr. No. Paranrcters Yes/No Remarks 1 Whether works of all the eleci; :t l Yes Work yet to start wiring/connections/l ift lnsta iai r :,r' :ther electrical I installations have been carricd :-,tt under authorized/registered eleciri;:t er3ineer and Licensed electrical contractors will be whether records of the san"l,: h:s blen maintained? appointed to execute the works. 2 Whether all related vvori.: ,, . ;i.iting & sanitary Yes Work yet to start including installation of ,r,,:ri_ r .. ,.', / Iystems, drainage systems, sewa.c : etc. have been carr ,e d r I I .lr ' :, sjnks, toilets Licensed plumbing contractors will be authorized/registeredplLlrr:.. : itarycontractors appointed to execute the works. and whether recoros of r , ,s 6een maintained? Page 2 of3