ARtrHITEtrTS & GtrNSU LTANTS Annexure A FORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: l,ilottleg6 To, JAY SHREE KRISHNA ENTERPRISES THANE, MAHARASHTRA, 40O605 Subject : Certificate of percentage of Work of completion of construction work of MARUTI HOMES having MahaRERA Registration Number P51700056264 (Only Applicable after project Registartion) being developed by JAY SHREE KRISHNA ENTERPRISES Sir, l/We have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of completion of Construction Work of MARUTI HOMES having MahaRERA Registration Number P51700056264 (Only Applicable after project Registration, being developed by JAY SHREE KRISHNA ENTERPRISES ) Based on Site lnspection,with respect to Layout / each of the Building/Wing of the aforesaid Real Estate Project I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A Number: ,r\ \o 506, sth Floor, A Wing, Dev Corporo, Eostern Express Highwoy, Codbury Jundion, Khopot, Thone (W) 400 Tel. : 022-41008682 / 83/&6seE I : lOfoldsorchitects@gmoil.com (h 9 Staircases, lifts Wells and Lobbies at each Floor level Overhead and 0.00 Underground Water Tanks 10 External plumbing ald. external plaster, elevation, completion of terraces with 0.00 waterproofi ng of the Buildinq/wino. 11 0.00 LayouUBuildi ng Number: Building 2/NA (1) (21 (3) 1 Excavation 100.00 2 Basements (if anv) 0.00 3 Podiums (if any) 0.00 4 Plinth, 100.00 5 Stilt Floor 75.00 6 Slabs of Super Structure 100.00 7 Internal walls, lnternal plaster, Floorings, Floors and windows within 25.O0 Flats/Premises 8 Sanitary Fittinq within the FlaUPremises 0.00 I Staircases, lifts Wells and Lobbies at each Floor level Overhead and 10.00 Underground Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.00 waterproofi ng of the Building/wino. 11 000 Paaa ) al ? Table B - Common Areas (lnternal and External Development Phase / Project Number) works) in respect of Registered (1) QI (3) (41 (s) 1 rnternat Roads & Footpaths Yes 0.00 Will be done prior to O.C. 2 Water Supply Yes 0.00 Will be done prior to O.C. 3 sewerage (Chamber, Lines, Septic Tank , STp) Yes 0.00 Willbe done prior to O.C. 4 Storm Water Drains Yes 0.00 Will be done prior to O.C. 5 Landscaping & Tree Planting Yes 0.00 Will be done prior to O.C. 6 Street Lighting Yes 0.00 lA/il! ha r..na prior to O.C. 7 Community Buildinos No 0.00 NA 8 rearmenr And Disposal Of Sewage And Sullage Water Yes 0.00 Will be done prior to O.C. I Solld Waste Management And Disposal Yes 0.00 Will be done prior to O.C. 10 Water conservation /Rain water harvesting Yes 0.00 Will be done prior to O.C. 11 Energy managemcnt Yes 0.00 Will be done prior to O.C. 12 Frre protectton and fire safety requirements Yes 0.00 Will be done prior to O.C. 13 Erecrncat meter room, sub-station, receiving station Yes 0.00 Willbe done prior to O.C. 14 nqgregate area of recreational Open Space No 0.00 NA 15 Open Parking No 0.00 NA i ARr oi -l*' \.t q(i-n5) Signature & Name (lN BLoCK LETTERS) of L.S/nrdiGt ( License No: ) Date of Certificate: Agreed epted by: Signature of Promoter Name: Jay Shree Krishna Enterprises Date: lL1 lo I lA016 Pane ? af 1