ARtrH ITEtrTS & trtrN5ULTANTS Annexure A FORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: l3 | r o l"? "i f To, JAY SHREE KRISHNA ENTERPRISES THAN E, MAHARASHTRA, 400605 Subject : Certiflcate of percentage of Work of completion of construction work of MARUTI HOMES having MahaRERA Registration Number P51700056264 (Only Applicable after project Registartion) being developed by JAY SHREE KRISHNA ENTERPRISES Sir, lffie 10 FOLDS ARCHITECTS & CONSULTANTS have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of completion of Construction Work of MARUTT HOMES having MahaRERA Registration Number P51700056264 (Only Applicable after project Registration, being developed by JAY SHREE KRISHNA ENTERPRISES ) Based on Site lnspection,with respect to Layout i each of the Building/Wing of the aforesaid Real Estate Project I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A LayouUBuildingMing Number: /NA (1) (21 (3) 1 Excavation 100.00 2 Basements (if any) 0.00 3 Podiums (if any) 0.00 4 Plinth, 100.00 5 Stilt Floor 0.00 6 Slabs of Super Structure 000 7 lnternal walls, lnternal plaster, Floorings, Floors and windows within 000 Flats/Premises I Sanitarv Fittinq within the FlaUPremises 0.00 Page 1 of3 506,5th Floor, A Wing, Dev Corporo, Eostern Express Highwoy, Codbury Junction, Khopot, Thone (W) 400 t/ Tel.: 022-41008582 /83 /84. Emoil : l0foldsorchitects@gmoil.com (vr- o staircases, lifts wells and Lobbies at each Floor level overhead and 0.00 Underqround Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 000 wateroroofi nq of the Buildinq/wing. 11 0.00 LayouUBuild Number: Buildi 2/NA Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (21 (3) 1 Excavation 100.00 2 Basements (if anY) 0.00 3 Podiums (if any) 0.00 '100.00 4 Plinth, 5 Stilt Floor 75.00 b SIabs of Super Structure 100.00 7 lnternal walls, lnternal plaster, Floorings, Floors and windows within 0.00 Flats/Premises o Sanitarv Fittino withln the FlaUPremises 0.00 I Staircases, lifts Wells and Lobbies at each Floor level Overhead and 10 00 Underqround Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.00 wateroroofi nq of the Building/wing. 11 0.00 gaaa ) aJ a Table B - Common A1ea.s (lnternal and Externat Devetopment Works) in respect of Registered Phase / Project Number) (1) (21 (3) (4) (5) 1 lnternal Roads & Footpaths Yes 0.00 Will be done prior to O.C. 2 Water Supply Yes 0.00 Will be done prior to O.C. 3 Sewerage (Chamber, Lines, Septic Tank , STP) Yes 0.00 Willbe done prior to O.C. 4 Storm Water Drains Yes 0.00 Will be done prior to O.C. 5 Landscaping & Tree Planting Yes 0.00 Will be done prior to O.C. 6 Street Lighting Yes 0.00 Will be done prior to O.C. 7 Community Buildings No 0.00 NA 8 Treatment And Disposal Of Sewage And Sullage Watei Yes 0.00 Will be done orior to O C I Solid Waste Management And Disposal Yes 0.00 Will be done orior to O.C. 10 Water conservation /Rain water harvesting Yes 0.00 Will be done orior to O.C. 11 Energy managemcnt Yes 0.00 Will be done orior to O.C. 12 Fire protection and fire safety requirements Yes 0.00 Will be done prior to O.C. 13 Electrical meter room, sub-station, receiving station Yes 0.00 Will be done orior to O.C. 14 Aqgreqate area of recreational Ooen Soace No 0.00 NA 15 Open Parking No 0.00 NA 'J) aN , rrA, I r' 10 F HITECTS & CO Signature & Name (lN BLOCK LETTERS) of L.S/ Architect ( License No: CA/2001127699) Date of Certificate: 3oioglzrz{ Agreed ed by: Signature of Promoter Date: rlltoizozS Pano ? nf 1