10 FOLDS ARtrHITEtrTS & CONS U LTANTS Annexure A Form 1 fsee Regulation 3] ARCHITECT'S CERTIFICATE Date z 0810712025 To M/s. Jay Shree Krishna Enterprises, B-105, Shree Suryadarshan CHS, Parsik Nagar, Kharigaon, Kalwa (w.), Thane- 400605. Subject: Certification of percentage of completion of construction work of proposed Sub Plot B : Building No. 1 & Building No. 2 Project known as "Maruti Homes" for the project [Maha RERA Regi. No. P51700056264] situated on the plot bearing Gut No. 17l, City Survey No. 278lA l2lA & 27BlAl2B, at Village Parsik, Tal. & Dist. Thane (Only Applicable after project Registration) being developed by IWs. Jay Shree Krishna Enterprises. Sir, We, 10 Folds Architects & Consultants have undertaken assignment as Architect of certiSzing Percentage of Completion of Construction Work of proposed Sub Plot B : Building No. 1 & Building No. 2 Project known as "Maruti Homes"for the project [Maha RERA Regi No. P5170005G2641 situated on the plot bearing Gut No.171, City Survey No. 27BlA/2lA & 278lN2lB, at village Parsik, Tal. & Dist. Thane (only Applicable after project Registration) being developed by M/s. Jay Shree Krishna Enterprises. Based on Site Inspection, with respect to Layoutleach of the Building/ Wing of the aforesaid Real Estate Project. I certiflz that as on the date of this certificate, the Percentage of Work done for each of the building/ Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activities of the entire phase is detailed in Table B. 506,5th Floor, A Wing, Dev Corporo, Eostern Express Highwoy, Codbury Junction, KhopoL Thone (W) 400 Tel. : 022-41 008682 I 83 / U . E moil : I 0foldsorchitects@gmoil.com lOFOLDS !:.;:ii-i:Ifl-j .! :lal ..] :t..1 *lai..t i.:: Table A Sub Plot B : Building No. 1 :- Ground / Stilt + 1't to 22th Floors (to be prepared separately for each Layout/Building/Wing of the project) Sr. Tasks /Activify Percentage of Actual No work done (As on date j0/06/2025) (1) (21 (3) 1 Excavation t00% 2 Basement (if any) N.A. J Podium (if any) N.A. 4 Plinth 100% 5 Stilt Floor 0% 6 23 Nos. Slab of Super Structure 0% 7 Internal walls, Internal Plaster, Floorings, jYo Doors and windows within Flats/Premises 8 Sanitary Fittings within the Flat/Premises 0% 9 Staircases, Lifts, Wells and Lobbies at each Floor 0% Level Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, 0% completion of terraces with waterproofing of the Building/Wing. 11 Installation of Lifts, water pumps, Fire Fighting 0% Fittings and Equipment as per CFO NOC, Electrical fittings,mechanical equipment, compliance to conditions of environment ICRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specihcations in agreement of Sale. Any other activities. KP, \(tl tl rn\ +l ll =alo 506, 5th Floor, A Wing, Dev Corporo, Eostern Express Highwoy, Codbury Jundion, Khopoi Thone W) 400 60'l. Tel. 022-41 008682 / 83 / U . E moil : I 0foldso rchitects@g moil.com : wld b, ,rl // lOFOLDS Aar.l iTai:-f!: t L,lai!-Ll l, lAl'i:1: Table A Sub Ptot B : Building No. 2 :- Ground / Stilt + 1't to 7th Floors (to be prepared separately for each Layout/Building/Wing of the project) Sr. Tasks /Activity Percentage of Actual No work done (As on date j0/06/2025) (1) (2) (3) 1 Excavation r00% 2 Basement (if any) N.A. a J Podium (if any) N.A. 4 Plinth t00% 5 Stilt Floor 75% 6 08 Nos. Slab of Super Structure 90% 7 Internal walls, Internal Plaster, Floorings, 0% Doors and windows within Flats/Premises 8 Sanitary Fittings within the Flat/Premises 0% 9 Staircases, Lifts, Wells and Lobbies at each Floor 0% Level Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, 0% completion of temaces with waterproofing of the Building/Wing. 11 Installation of Lifts, water pumps, Fire Fighting 0% Fittings and Equipment as per CFO NOC, Electricai fittings, mechanical equipment, compliance to conditions of environment ICRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. oL c \a \ln Ifr ffig l-t -. 'I(, 506, 5th Floor, A Wing, Dev Corporo, Eostern Express Highwoy, Codbury Junction, Khopol Thone M) 400 60.l. Tel. : 022-41008682 / 83 / 84 . Emoil : IOfoldsorchiteds@gmoil.com lOFOLDS '"*-.-.., TABLE-B Sub Plot B : Building No. I & Building No. 2 ( Internal and Extemal Development Works) in respect of the Registered Phase/ Project Maha RERA No. P51700056264 Sr. Common areas and Proposed Percentage Details No. Facilities, Amenities (Yes/I.{o) of Work done (As on date 30/06/2025) (1) (2) (3) (4) (s) 1. Intemal Roads & Footpaths' Yes 0% w ll be done prior to O.C 2. Water Supply for buildine Yes 0% w ll be done prior to O.C a J. Sewerage (Chamber, Lines, Yes 0% Will be done prior to O.C Septic Tank, STP) 4. Storm Water Drains Yes 0% Will be done prior to O.C 5. Landscapins & Tree Plantins Yes 0% Will be done prior to O.C 6. Street Liehtins Yes 0% Will be done prior to O.C 7. Community Buildines No 8. Treatment and disposal of Yes 0% Will be done prior to O.C sewage and salvaee water 9. Solid Waste management & Yes 0% Will be done prior to O.C Disposal. 10. Water conservation, Rain Yes 0% Will be done prior to O.C Water Harvesting l1 Energy management Yes 0% Will be done prior to O.C t2. Fire protection and fire Yes 0% Will be done prior to O.C safety requirements 13. Electrical meter room, sub- Yes 0% Will be done prior to O.C station, receiving station. 14. Others (Option to Add more) No Yours faithfully, For, 10 FOLDS Architectp & Cpnsultants. I L ^ ,z t,ltr$l 'vl'll,tl, l*t'---: -- Ar. Anfl H. Jagwani. Reg. No.CN2001127699. Agreed and Accepted by : Signature of Promoter 1\[/s. Jay Shree Krishna Enterprises) oare : og lo?i2ouS 506,5th Floor, A Wing, Dev Corporo, Eostem Express Highwoy, Codbury Junction, Khopot, Thone M) 400 601. Tel. : 022-41008682 / 83 I 84 . E moil : I Ofoldsorchitectspgmoil.com