ARtrHITEtrTS & trtrNSULTANTS Annexure A Form I [see Regulation 3] ARCHITECT'S CERTIFICATE Date :0210412025 To M/s. Jay Shree Krishna Enterprises, 8-105, Shree Suryadarshan CHS, Parsik Nagar, Kharigaon, Kalwa (w.), Thane- 400605. Subject: Certification of percentage of completion of construction work of proposed Sub Plot B : Building No. 1 & Building No. 2 Project known as "Maruti rromes" for the project [Maha RERA Regi. No. P517000562641situated on the plot bearing Gut No.17l, city Survey No. 278lA /2/A & 27grN2rB, at village Parsik, Tal. & Dist. Thane (only Applicable after project Registration) being developed by IWs. Jay Shree Krishna Enterprises. Sir, We, 10 Folds Architects & Consultants have undertaken assignment as Architect of certifring Percentage of Completion of Construction Work of proposed Sub Plot B : Building No. 1 & Building No. 2 project known as "Maruti Homes"for the project [Maha RERA Regi No. p517000562641 situated on the plot bearing Gut No.171, City Survey No. 27B\N2/A &, 278/N2lB, at village Parsik, Tal. & Dist. Thane (only Applicable after project Registration) being developed by IWs. Jay Shree Krishna Enterprises. Based on Site Inspection, with respect to Layout/each of the Building/ Wing of the aforesaid Real Estate Project. I certiff that as on the date of this certificate, the Percentage of Work done for each of the building/ Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activities of the entire phase is detailed in Table B. 506, 5th Floor, A Wing, Dev Corporo, Eostern Express Highwoy, Codbury Junction, Khopot, Thone (W) Tel.: 022-410086821 831 U . Emoil : I0foldsorchiteds@gmoit.com ARtrHITECTS & CO NS U LTANTS Table A Sub Plot B : Building No. 1 :- Ground / Stilt + I't to 22tr Floors (to be prepared separately for each Layout/Building/wing of the project) Sr. Tasks /Activity Percentage of Actual No work done (As on date 3l/03/2025) (1) (2) (3) I Excavation 100% 2 Basement (if any) N.A. J Podium (if any) N.A. 4 Plinth 100% 5 Stilt Floor 0% 6 23 Nos. Slab of Super Structure 0% 7 Internal walls, Internal Plaster, Floorings, 0% Doors and windows within Flats/Premises 8 Sanitary Fittings within the Flat/Premises 0% 9 Staircases, Lifts, Wells and Lobbies at each Floor 0% Level Overhead and Underground Water Tanks l0 External plumbing and external plaster, elevation, 0% completion of terraces with waterproofing of the Building/Wing. ll Installation of Lifts, water pumps, Fire Fighting 0% Fittings and Equipment as per CFO NOC, Electrical fittings,mechanical equipment, compliance to conditions of environment ICRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. 506, sth Floor, A Wing, Dev Corporo, Eostem Express Highwoy, Codbury Junction, Khopot, Thone M) 400 60il Tel. 022-41 008682 / 83 / 84 . E moil : I ffoldsorchitects@gmoit.com : w ARCH ITEtrTS & trONS ULTANTS Table A Sub Plot B : Building No. 2 :- Ground / Stilt + lst to 7n Floors (to be prepared separately for each Layout/Building/wing of the project) Sr. Tasks /Activity Percentage of Actual No work done (As on date 3l/03/2025) (1) (21 (3) 1 Excavation 100% 2 Basement (if any) N.A. J Podium (if any) N.A. 4 Plinth 100% 5 Stilt Floor 25% 6 08 Nos. Slab of Super Structure 40% 7 Internal walls, Internal Plaster, Floorings, 0% Doors and windows within Flats/Premises 8 Sanitary Fittings within the FlatiPremises 0% 9 Staircases, Lifts, Wells and Lobbies at each Floor 0% Level Overhead and Underground Water Tanks l0 Extemal plumbing and extemal plaster, elevation, 0% completion of terraces with waterproofing of the Building/Wing. 1l Installation of Lifts, water pumps, Fire Fighting 0% Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment ICRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. .4v RN Al n D f )r 505,5th Floor, A Wing, Dev Corporo, Eostern Express Highwoy, Codbury Junction, Khopot, Thone M) 40( Tel.: 022-41008682 / 83 / 84. Emoil : t0foldsorchitects@gmoit.com \ w/ ARCHITEtrTS & trONSULTANTS TABLE.B Sub Plot B : Building No. I & Building No.2 ( Intemal and Extemal Development Works) in respect olthe Registered phase/ Project Maha RERA No. P51700056264 Sr. Common areas and Proposed Percentage Details No. Facilities, Amenities (Yes/|.{o) of Work done (As on date 3 r/03/2025) (1) a) (3) (4) (s) I Intemal Roads & Footpaths' Yes 0% Will be done prior to O.C 2. Water Supply for buildine Yes 0% Will be done prior to O.C J. Sewerage (Chamber, Lines, Yes 0% Will be done prior to O.C Septic Tank, STP) 4. Storm Water Drains Yes 0% Will be done prior to O.C 5. Landscaping & Tree Plantine Yes 0% Will be done prior to O.C 6. Street Lighting Yes 0% Will be done prior to O.C 7. Community Buildines No 8. Treatment and disposal of Yes 0% Will be done prior to O.C sewage and salvage water 9. Solid Waste management & Yes 0% Will be done prior to O.C Disposal. 10. Water conservation, Rain Yes 0% Will be done prior to O.C Water Harvesting ll Energy management Yes 0% Will be done prior to O.C 12. Fire protection and fire Yes 0% Will be done prior to O.C safety requirements 13. Electrical meter room, sub- Yes 0% Will be done prior to O.C station, receiving station, 14. Others (Option to Add more) No Yours faithfully, For, 10 FOLDS AFri{@ Reg. No.CN2001127699. Agreed and Accepted by : Signature of Promoter 1\[/s. Jay Shree Krishna Enterp 506,5th Floor, A Wing, Dev Corporo, Eostern Express Highwoy, Codbury Junction, Khopot, Thone (W) 4OO 601. Tel. : 022-41 008682 / 83 / 84 . E moit : I 0fotdso rchitects6rg moit.com