ARtrHITEtrTS & trONSULTANTS Annexure A Form I [see Regulation 3] ARCHITECT' S CERTIFICATE Date z 08/10/2024 To M/s. Jay Shree Krishna Enterpriscs, B-105, Shree Suryadarshan CHS, Parsik Nagar, Kharigaon, Kahva (rv.), Thane- 400605. Subjcct:Certification of percentage of completion of construction work of proposed Sub prot B : Building No. 1 & Buitding No. 2 Project known as ."Maruti Horncs"for the project [Maha RERA Regi. No. P51700056264lsituated on the plot bearing No.r7r, city Survey No. 278lA/2/A & zigtazn, at ,qu! [illage Parsik, Tal. & Dist. Thane (only Applicable after project Registration) being developed by IWs. Jay Shree Krishna Enterprises. Sir, We, 10 Folds Architccts & Consultants have undertaken assignment as Architect of certifying Percentage of Completion of Construction Work of proposed sub PIot B : Building No. 1 & Building No. 2 project known as "Maruti Homes"for the project [Maha RERA Regi No. P51700056264lsituated on the plot bearing Gut No.l71, city Suney No. 2781N2/A & 2781N2/8, at village parsik, Tal. & Dist. Thane (only Applicable after project Registration) being developed by IWs. Jay Shree Krishna Enterprises. Based on Site Inspection, with respect to Layout /each of the Building/ Wing of the aforesaid Real Estate Project. I certify that as on the date of this certificate, the Percentage of Work done for each of the building/ Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed rvith respect to each of the activities of the enti phase is detailed in Table B. 506,5th Floor, A Wing, Dev Corporo, Eostern Express Highwoy, Codbury Junction, Khopot, Thone (W) 4OO U. Tel.: 022-41008682 / 83 / Emoil : tOfoldsorchitects@gmoit.com ARCH ITEtrTS & trDNSU LTANTS Table A Sub Plot B : Building No. I :-. Ground / stilt + l't to 22n Floors (to be prepared separately for each Layout/Building/wing of the project) Sr. Tasks /Activify Percentage of Actual No work done (As on date 30/09/2024) (1) (2) (3) I Excavation 50% 2 Basement (if any) N.A. 1 J Podium (if any) N.A. 4 Plinth 0% 5 Stilt Floor 0% 6 23 Nos. Slab of Super Structure 0% 7 Internal walls, Internal Plaster, Floorings, 0% Doors and windows within Flats/premises 8 Sanitary Fittings within the Flat/premises 0% 9 Staircases, Lifts, Wells and Lobbies at each Floor 0% Level Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevatiorl 0% completion of terraces with waterproofing of the BuildingiWing. 11 ter pumps, Fire Fighting 0% s per CEO NOC, Electrical ipment, compliance to t ICRZ NOC, Finishing to rotection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. ,<1 SA s 41 it 506,5th Floor, A Wing, Dev Corporo, Eostern Express Hiqhwoy, Codbury Junction, Khoool, Thone (W) 400 60 v Tel. : 022-41 008682 / 83 / U . E rnoil : I 0foldsorchitects@g moil.com QNS$ ARCHITEtrTS & CONSULTANTS Table A Sub Plot B : Building No. 2 :- Ground / Stilt + I't to 7e Floors (to be prepared separately for each Layout/Building/wing of the project) Sr. Tasks /Activify Percentage of Actual No work done (As on date 30/09/2024) (1) (2\ (3) 1 Excavation 100% 2 Basement (if any) N.A. J Podium (if any) N.A. 4 Plinth 100% 5 Stilt Floor 0% 6 08 Nos. Slab of Super Structure t2% 7 Internal walls, Internal Plaster, Floorings, 0% Doors and windows within Flats/premises 8 Sanitary Fittings within the Flat/piemises 0% 9 Staircases, Lifts, Wells and Lobbies at each Floor 0% Level Overhead and Underground Water Tanks l0 External plumbing and extemal plaster, elevation, 0% completion of temaces with waterproofing of the Building/Wing. ll a% conditions of environment ICRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. tr< /r( 5r rl t 506,5th Floor, A Wing, Dev Corporo, Eostern Express Highwoy, Codbury Jundion, Khopot, Thone (W) 400 Tel. : 022-41 008682 / 83 / 84 . E moil : I 0foldso rch itects@g moit.com ARCHITEtrTS & trENS U LTANTS TABLE-B Sub Plot B : Building No. I & Building No. 2 ( Internal and External Development Works) in respect oflhe Registered phase/ Project Maha RERA No. P51700056264 Sr. Conrnron :rrcas and Proposed Percentage Details No. Facilitics, Anrcnitics (Yes/No) of Work done (As on date 30/09/2024) (1) p) (3) @l (s) l. Internal Roads & Footpaths' Yes 0% Will be done prior to O.C 2. Water Supply for buildine Yes 0% Will be done prior to O.C a J. Sewerage (Chamber, Lines, .Yes 0% Will be done prior to O.C Septic Tank, STP) 4. Storm Water Drains Yes 0% Will be done prior to O.C 5. Landscaping & Tree Yes 0% Will be done prior to O.C Planting 6. Street Lightine Yes 0% Will be done prior to O.C 7. Community 13uildings No 8. Treatment and disposal of Yes 0% Will be done prior to O.C sewage and salvage water 9. Solid Waste management & Yes 0% Will be done prior to O.C Disposal. 10. Water conservation, Rain Yes 0% Will be done prior to O.C Water Harvesting 11 Energy management Yes 0% Will be done prior to O.C 12. Fire protection and fire Yes 0% Will be done prior to O.C safety requirements 13. Electrical meter room, sub- 'Yes 0% Will be done prior to O.C station, receiving station. 14. Others (Option to Add more) No Yours faithfully, For, 10 FOLDS Reg. No.CN2001127699. Agree ccpted by : Signature of Promoter For M/s. Jly Shrcc Krishua 506, 5th Floor, A Wing, Dev Corporo, Eostern Express Highwoy, Codbury Junction, Khopot, Thone (W) 400 601. /84. Tel.: 022-41008682 / 83 Emoit : tOfotdsorchitects@gmoil.com