lOFOLDS +qI :-n :Tilir:: & i.: i: \J LJ LTAi.,jT= =t Annexure A Form 1 [see Regulation 3] ARCHITBCT' S CERTIFICATE Date :1010712024 To M/s. Jay Shree Krishna Enterprises, B-105, Shree Suryadarshan CHS, Parsik Nagar, Kharigaon, Kalwa (w.), Thane- 400605. Subject: Certification of percentage of completion of construction work of proposed Sub Plot B : Building No. 1 & Building No. 2 Project known as "Maruti Homes" for the project [Maha RERA Regi. No. P517000562641situated on the plot bearing Gut No.l7l, City Survey No. 278lA/2lA B. 27BlN2lIl, at village Parsik, Tal. & Dist. Thane (only Applicrl,le aflcr project Registration) being developed by M/s. iay Shree Krishna Enterprises. Sir, We, 10 Folds Architects & Consultants have undertaken assignment as Architect of certiflring Percentage of Cornpletion of Construr.ion Work of proposed Sub Plot B : Building No. I & Building No. 2 pro.,ect knorvn as "Maruti Homes" for the prcject [Maha RER^. Re;i Nt. psl'/{"005(2641 situated on the plot bearing Gut No.171, City Survey No. 27glN2lA &. 278lN2lB, at village Parsik, Tal. & Dist. Thane (Only Applicable after project Registration) being developed by IWs. Jay Shree Krishna Enterprises. Based on Site Inspection, with respect to Layoutleach of the Building/ Wing of the aforesaid Real Estare Project. I certifz that as on the date of this certificate, the Percentage of Work done for each of the building/ Wing of the Real Estate Project under MahaRERA is as.per Table A herein below. percentage of the work executed with respect to each of the activities of the phase is detailed in Table B. 506, sth Floor, A Wing, Dev Corporo, Eostern Exprcss Highwoy, Codbury Junction, Khopot, Thone (W) 400 601. W. Tel. : 022-41008682 / 83 / Emoil : IOfoldsorchitects@gmoil.com lOFOLD5 ARtrH ITEtrTS & trBNSULTANTS Table A Sub Plot B : Building No. 1 :- Ground / Stilt + l.t to 226 Floors (to be prepared separately for each LayouuBuildingAving of the project) Sr. Tasks /Activity Percentage of Actual No work done (As on date 30/06/2024) (1) a) (3) I Excavation 50% 2 Basement (if any) N.A. a J Podium (if any) II.A. 4 Plinth 0% 5 Stilt Floor 0% 6 23 Nos. Slab of Super Structure 0% 7 Internal walls, Internal Plaster, Floorings, 0% Doors and windows within Flats/?remises 8 Sanitary Fittings within the Flat/Premises 0% 9 Staircases, Lifts, Wells and Lobbies at each Floor 0% Level Overhead and Underground Water Tanks l0 External plumbing and extemal plaster, elevation, 0% completion of terraces with waterproofing of the Building/Wing. 11 Installation of Lifts, water pumps, Fire Fighting 0% Fittings and Equipment as per CFO NOC, Electrical fittings,mechanical equipment, compliance to conditions of environment ICRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. ,A \e" lo #k 506, 5th Floor, A Wing, Dev Corporo, Eostern Express Highwoy, Codbury Junction, Khopot, Thone M) 400 60I. lor Iel. : 022-41008682 / 83 / 84 . E moil : I 0foldsorchitects@gmoil.com lOFOLDS AAilHITEITS & CTT.jS IJL]ANT= Table A Sub Plot B : Building No. 2 :- Ground / Stilt + l't to 7th Floors (to be prepared separately for each Layout/Building/Wing of the project) Sr. Tasks /Activity Percentage of Actual No work done (As on date 30/06/2024) (1) (2) (3) I Excavation t00% 2 Basement (if any) N.A. 3 Podium (if any) N.A. 4 Plinth 100% 5 Stilt Floor 0% 6 08 Nos. Slab of Super Structure 0% 7 Intemal walls, Intemal Plaster, Floorings, 0% Doors and windows within Flats/Premises 8 Sanitary Fittings within the Flat/Premises 0o/o 9 Staircases, Lifts, Wells and Lobbies at each Floor 0% Level Overhead and Underground Water Tanks 10 Extemal plumbing and external plaster, elevation, 0% completion of terraces with waterproofing of the Building/Wing. 11 Installation of Lifts, water pumps, Fire Fighting 0% Fittings and Equipment as per CFO NOC, Electrical fittings,mechanical equipment, compliance to conditions of environment ICRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. tu g 506, 5th Floor, A Wing, Dev Corporo, Eostern Express Highwoy, Codbury Jundion, Khopot, Thone (W) 400 601. Tel. : 022-4'1 008682 / 83 / U . E moil : I Ofoldsorchitects@gmoil.com lOFOLDS A.AXH iT[[]T= a: in \t S U LTANTE TABLE.B Sub Plot B : Building No. I & Buitding No. 2 ( Intemal and External Development Works) in respect of the Registered Phase/ Project Maha RERA No. P5 I 700056264 Sr. Common areas and Proposed Percentage Details No. Facilities, Amenities (Yes/I.{o) of Work done (As on date 30/06/2024) (1) (2) (3) (4) (s) l. Intemal Roads & Footps,r-hs' Yes 0% Will be done prior to O.C 2. Water Supply for buildine Yes 0% Will be drne prior to O.C a J. Sewerage (Chamber, Lines, Yes 0% Will be tone prior to O:C Septic Tank, STP) 4. Storm Water Drains Yes 0% Will be done prior to O.C 5. Landscaping & Tree Plantine Yes 0% Will be done prior to O.C 6. Street Lighting Yes 0% Will be done prior to O.C 7. Community Buildings No 8. Treatment and disposal of Yes 0% Will be done prior to O.C sewage and salvage water 9. Solid Waste management & Yes 0% Will be done prior to O.C Disposal. 10. Water conservation, Rain Yes 0% Will be done prior to O.C Water Harvesting 11 Energy management Yes 0% Will be done prior to O.C t2. Fire protection and fire safety Yes 0% Will be done prior to O.C requirements 13. Electrical meter room, sub- Yes 0% Will be done prior to O.C station, receiving station. t4. Others (Option to Add more) No Yours faithfully, for, l0 FOIDS & Consultants. $;,wn Ar. Anil H. Jagwani. Reg. No. CN2001127699. Agreed and Accepted by /.n (W I SigMure of Promoter For M/s. Jay Shree Krishnd 506, 5th Floor, A Wing, Dev Corporo, Eostem Express Highwoy, Codbury Junction, Khopot, Thone (W) 400 60]. U. Tel. : 022-41008682 / 83 / Emoil : l0foldsorchitects@gmoil.com