lOFOLDS ARtrHITECTS &, trONSULTANTS Annexure A Form 1 [see Regulation 3] ARCHITECT'S CERTIFICATE Date t 0410112025 To M/s. Jay Shree Krishna Enterprises, B-105, Shree Suryadarshan CHS, Parsik Nagar, Kharigaon, Kahva (lv.), Thane- 400505. Subject: Certification of percentage of cornpletion of construction work of proposed Sub Plot B : Building No. 1 & Building No. 2 Project known as "Maruti Homes" for the project [Maha RERA Regi. No. P517000562641situated on the plot bearing Gut No. 17l, City Survey No. 278lA l2lA & 27BlN2lB, at Village Parsik, Tal. & Dist. Thane (Only Applicable after project Registration) being developed by IvVs. Jay Shree Krishna Enterprises. Sir, We, 10 Folds Architects & Consultants have undertaken assignment as Architect of certiflring Percentage of Completion of Construction Work of proposed Sub PIot B : Building No. 1 & Building No. 2 Project known as "Maruti Homes"for the project [Maha RBRA Regi No. P5170005G264j situated on the plot bearing Gut No.t71. City Surve,v No. 27BlAJ2lA & 278lN2lB, at village Parsik, Tal. & Dist. Thane (only Applicable after project Registration) being developed by IWs. Jay Shree Krishna Enterprises. Based on Site Inspection, with respect to Layout/each of the Building/ Wing of the aforesaid Real Estate Project. I certiff that as on the date of this certificate, the Percentage of Work done for each of the building/ Wing of the Real Estate Project under lvIahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activitics of the entire phase is detailed in Table B. 506, 5th Floor, A Wing, Dev Corporo, Eostem Exprcss Highwoy, Codbury Junction, Khopoi Thone (W) 400 Tel. : 022-41008682 / 83 I U . E moil : I Ofoldso rchitects@gmoit.com lOFOLDS AR:i-ri-T Ic-r3 & cl*-i l\i 31._r --lA\].i-S Table A Sub Plot B : Building No. 1 :- Ground / Stilt + l't to 22th Floors (to be prepared separately for each Layout/Building/Wing of the project) Sr. Tasks /Activity Percentage of Actual No work done (As on date i1/12/2024) (1) 0l (3) I Excavation 80% 2 Basement (if any) N.A. J Podium (if any) N.A. 4 Plinth a% 5 Stilt Floor 0% 6 23 Nos. Slab of Super Structure 0% 7 Internal walls, Internal Plaster, Floorings, 0% Doors and windows within Flats/Premises 8 Sanitary Fittings within the Flat/Premises 0% 9 Staircases, Lifts, Wells and Lobbies at each Floor 0% Level Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, 0% completion of terraces with waterproofing of the Building/Wing. 11 Installation of Lifts, water pumps, Fire Fighting 0% Fittings and Equipment as per CFO NOC, Electricai fittings,mechanical equipment, compliance to conditions of environment ICRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. 506, 5th Floor, A Wing, Dev Corporo, Eostem Express Highwoy, Codbury Junction, Khopoi Thone (W) 400 Ihffi Tel. : 022-41008582 / 83 / U . Emoil : I Ofoldsorchitects@gmoil.com lOFOLDS Ai!:l!-lllI1.,-l .:i ; :1.:iri::l i"il-..lAi'.1 l-:::l Table A Sub Plot B : Building No. 2 :- Ground i Stilt + l't to 7th Floors (to be prepared separately for each Layout/Building/Wing of the project) Sr. Tasks /Activity Percentage of Actual No work done (As on date 31/12/2024) (1) o\ (3) 1 Excavation 100% 2 Basement (if any) N.A. J Podium (if any) N.A. 4 Plinth t0a% 5 Stilt Floor 25% 6 08 Nos. Slab of Super Structure 40% 7 Internal walls, Internal Plaster, Floorings, 0% Doors and windows within Flats/Premises 8 Sanitary Fittings within the Flat/Premises 0% 9 Staircases, Lifts, Wells and Lobbies at each Floor 0% Level Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, 0% completion of terraces with waterproofing of the Building/Wing. ll Installation of Lifts, water pumps, Fire Fighting 0% Fittings and Equipment as per CFO NOC. Electrical fittings, mechanical equipment, compliance to conditions of environment ICRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. 506, 5th Floor, A Wing, Dev Corporo, Eostem Exprcss Highwoy, Codbury Junction, Khopoi Thone W) 400 60 Tel. : 022-41008682 / 83 I U . Emoil : I Otoldsorchitects@gmoil.com 10 FOLDS ARi -i-.i t r l-l rl i.' f. i-r'-.1 r-l-7-'..1'li! ' '--:1,i TABLE-B Sub Plot B : Building No. I & Building No. 2 ( Internal and External Development Works) in respect of the Registered Phase/ Project Maha RERA No. P51700056264 Sr. Common areas and Proposed Percentage Details No. Facilities, Amenities (Yes/1.{o) of Work done (As on date 3 1/t 2/2024) (1) (2) (3) @\ (s) 1 Internal Roads & Footpaths' Yes 0% Will be done prior to O.C 2. Water Supply for buildins Yes 0% Will be done prior to O.C a J. Seu,erage (Chamber, Lines, Yes 0% \\rill bc ilen: piior to O.C Septic Tank, STP) 4. Storm Water Drains Yes 0% Will be done prior to O.C 5. Landscaping & Tree Planting Yes 0% Will be done prior to O.C 6. Street Lighting Yes 0% Will be done prior to O.C 7. Community Buildings No 8. Treatment and disposal of Yes 0% Will be donb prior to O.C sewage and salvage water 9. Solid Waste management & Yes 0% Will be done prior to O.C Disposal. 10. Water conservation, Rain Yes 0% Will be done prior to O.C Water Harvesting l1 Energy management Yes 0% Will be done prior to O.C 12. Fire protection and fire Yes 0% Will be done prior to O.C safety requirements 13. Electrical meter room, sub- Yes 0% Will be done prior to O.C station, receiving station, 14. Others (Option to Add more) No Yours faithfully, Fi:r, 10 FOLIIS ":.#fuH: Reg. No.CN2001127699. Agreed and Accepted by : Signature of Promoter I\[/s. Jay Shree Krishna Enterprises. 506,5th Floor, A Wing, Dev Corporo, Eostem Express Highwoy, Codbury Jundion, Khopot, Thone (W) 400 601. Tel.: 022-41008682 / 83 / 84 . Emoil : l0foldsorchitects@gmoil.com