10 FOLDS ARCHITEtrTS & CDNsULTANTS Annexure A Form 1 Isee Regulation 3] ARCHITECT'S CERTIFICATE Date z 2610212024 To M/s. Jay Shree Krishna Enterprises, B-105, Shree Suryadarshan CHS, Parsik Nagar, Kharigaon, Kahva (rv.), Thane- 400605. Subject: Certification ofpercentage of cornpletion of construction work ' of proposed Sub PIot B : Building No. 1 & Building No. 2 Project known as I'Maruti Homes" for the proj ect [Maha Regi. No. Apnlied I situated on the plot bearing Gut No.171, City Survey No. 278/N2lA & 2781N2/8, at Village Parsik, Tal. & Dist. Thane (Only Applicable after proj ect Registration) being developed by M/s. Jay Shree Krishna Enterprises. Sir, We, 10 Folds Architects & Consultants have undertaken assignment as Architect of certifuing Percentage of Completion of Construction Work of proposed Sub Plot B : Building No. 1 & Building No. 2 Project known as "Mamti Homes" for the project [Maha Rera Regi No. Applied I situated on the plot bearing Gut No.171, City Survey No.278/N2lA & 278lN2lB, at village Parsik, Tal. & Dist. Thane (Only Applicable after project Registration) being developed by IWs. Jay Shree Krishna Enterprises. Based on Site Inspection, with respect to Layout/each of the Building/ Wing of the aforesaid Real Estate Project. I certify that as on the date of this certificate, the Percentage of Work done for each of the building/ Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage ofthe work executed with respect to each of the activities of the entire phase is detailed in Table B. 506,51h Floor, A Wing, Dev Corporo, Eostern Express Highwoy, Codbury Junciion, Khopot, Thone (W) 400 60l. 022-41008682 / 83 / 84 . Emoil : rel: ',tofotdsorchiiects@gmoil.com 10 FOLDS ARtrHITEtrTS & CDNSULTANTS Table A _ Sub PIot B : Building No. I :- Ground / Stilt + l't to 22fi Floors (to be prepared separately for each Layout/Building/Wing ofthe project) Sr. Tasks /Activity Percentage of Actual No work done (As on date 26/02/2024) (t) a) (3) I Excavation 0% 2 Basement (if any) N.A. 3 Podium (if any) N.A. 4 Plinth 0% 5 Stilt Floor 0% 6 23 Nos. Slab of Super Structure 0% 7 Internal walls, Intemal Plaster, Floorings, 0% Doors and windows within Flats/premises 8 Sanitary Fittings within the Flat/premises 0% 9 Staircases, Lifts, Wells and Lobbies at each Floor 0% Level Overhead and Underground Water Tanks 10 Extemal plumbing and external plaster, elevatioq 0% completion ofterraces with waterproofing of the Building/Wing. 11 Ins.rallrtion ol Lifts, t*ot., purpr. TG-F[hting a% Fittings and Equipment as per CFO n-OC, Electrical fittings,mechanical equipment, compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. 506, 5th Floor, A Wing, Dev Corporo, Eostern Express Highwoy, Codbury Junction, Khopot, Thone (W) 400 60]. U, Tel. : 022-41 008682 / 83 / Emoil : lofoldsorchitects@gmoil.com 10 FOLDS ARCHITEtrTS & trON5ULTANTS Table A Sub Plot B : Building No. 2 :- Ground / Stilt + l't to 7s Floors (to be prepared separately for each Layout/Building/Wing ofthe project) Sr. Tasks /Activity Percentage of Actual No work done (As on date 26/02/2024) (1) (2) (3) 1 Excavation 0% 2 Basement (if any) N.A. J Podium (if any) N.A. 4 Plinth 0% 5 Stilt Floor 0% 6 08 Nos. Slab of Super Structure 0% 7 Intemal walls, Intemal Plaster, Floorings, 0%o Doors and windows within Flats/Prenises 8 Sanitary Fittings within the Flai{Premises 0% 9 Staircases, Lifts, Wells and Lobbies at each Floor 0% Level Overhead and Underground Water Tanks 10 External plumbing and extemal plaster, elevation, 0% cornpletion ofterraces with waterproofing of the Building/Wing. 11 Installation of Lifts, water pumps, Fire Fighting 0% Fittings and Equipment as per CFO NOC, Electrical fittings,mechanical equipment, compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. 506, 5th Floor, A Wing, Dev Corporo, Eostern ExpESS Highwoy, Codbury Junction, Khopot, Thone (W) 400 601. Tel. : 022-41008682 / 83 / 84 . Emoil : lofoldsorchitects@gmoil.com 10 FOLDS ARCHITECTS & CDNSULTANTS TABLE.B Sub Plot B : Building No. 1 & Building No. 2 ( Internal and Extemal Development Works) in respect of the Registered phase/ Project Number Annlied Sr. Common areas and Proposed Percentage Details No. Facilities, Amenities (Yes/No) of Work done (As on date 26/02/2021) (1) (2) (3) (4) (s) 1. Internal Roads & Footpaths' Yes 0% Will be done prior to O.C 2. Water Supply for building Yes 0% Will be done prior to O.C J. Sewerage (Chamber, Lines, Yes 0% Will be done prior to O.C Septic Tank, STP) 4. Storm Water Drains Yes 0% Will be done prior to O.C 5. Landscaping & Tree Planting Yes 0% Will be done prior to O.C 6. Street Lighting Yes 0% Will be done prior to O.C 7. Community Buildings No 8. Treatment and disposal' of Yes 0% Will be done prior to O.C sewage and salvage water 9. Solid Waste management & Yes 0% Will be done prior to O.C Disposal. 10. Water conservation, Rain Yes 0% Will be done prior to O.C Water Harvesting 11. Energy management Yes 0% Will be done prior to O.C 12. Fire protection and fire safety Yes 0% Will be done prior to O.C requirements 13. Electrical meter room, sub- Yes 0% Will be done prior to O.C station, receiving station, 14. Others (Option to Add more) No Yours faithf.rlly, for, 10 FOLDS Architects & Consultants. AtwY Ar. Anil H. Jagwani. Reg. No. CN2001127699. Asreel\ Accepted by : M Signa\ure of Promoter For M/s. Jay Shree Krishna Enlerprises Date:26102/2024 506, 5th Floor, A Wing. Dev Concoro, Eostem Express Highwoy, Codbury Junclion, Khopot, Thone (W) 400 601. /U Tel. : 022-4'1008682 / 83 . Emoil : lofoldsorchitecls@gmoll.com