FORM 1(See Regulation No. 3) Date:- 30/06/2026. To, Sab Ventures, Regency Park, Opp Radhakrishna Mandir, Hajimalang Road,Chakki Naka, Netivali, Kalyan East – 421306. Sub:- Certificate of percentage of completion of construction work of Bldg. F of the project Regency Park (Phase II) (Maha RERA Registration Number P51700056270) situated on the plot bearing S.No.2, H. No.3,4, 5/1, 5/2, S.No.3A, H.No.1/3 (p), S. No. 4B H. No.1, S.No.39A, S.No.40, H. No. 1, 2(p), Village:- Netivali, Taluka:- Kalyan, District:-Thane, Pin- 421301, being developed by M/s SAB VENTURES. Sir, I, Shobhana Deshpande, Proprietor, CREATIONS, have undertaken assignment as an Architect of certifying percentage of completion of construction work of Bldg. F of the project Regency Park (Phase II) (Maha RERA Registration Number P51700056270) situated on the plot bearing S.No.2, H. No.3,4, 5/1, 5/2, S.No.3A, H.No.1/3(p), S. No.4B H.No.1,S. No. 39A, S. No.40, H. No. 1, 2(p) ,Village:- Netivali, Taluka:- Kalyan, District:- Thane, Pin- 421301, being developed by M/s SAB VENTURES. Based on Site Inspection, with respect to each of the Bldg. F of the aforesaid Real Estate Project, I certify that as on the 30/06/2026, the Percentage of work done for each of the Wing of the Real Estate Project as registered vide number P51700056270 under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table - A Bldg. F: Sr. No. Tasks/ Activity Percentage of work done as on 30/06/2026. 1. Excavation 100% 2. 0 Number of Basement(s) and Plinth 100% 3. 2 Number of podiums 100% 4. Ground / Stilt Floor 50% 5. 26 number of slabs of super structure 57% 15th slab is completed. 6. Internal walls, Internal Plaster, Flooring within Flats/ Premises 13% Doors and Windows to each of the Flat/Premises 7. Sanitary Fittings within the Flat/Premises 0% Electrical Fittings within the Flat/Premises 8. Staircase, Lifts Wells and Lobbies at each Floor level connecting Staircase and Lifts, 39% Overhead and Underground Water Tanks 9. The external plumbing and external plaster, elevation, 0% completion of terraces with waterproofing of the Building/Wing 10. Installation of lifts, water pumps, Fire Fittings and Equipment as per CFO NOC, Electrical fittings to 0% Common Areas, electro, mechanical equipment, Compliance to conditions of environment/ CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation/Completion Certificate. Note: - The work percentage mentioned above is as per the number of floors sanctioned vide letter no. KDMCC / RB/2026/APL/00299, Dated- 07/04/2026. Table – B – For Phase II Internal & External Development Works in Respect of the entire Registered Phase Sr. Common areas and Facilities, Proposed Percentage of Details No. Amenities (Yes/ No) work done 1. Internal Roads & Footpaths Yes 100 % Shared across multiple phases of real estate project 2. Water Supply Yes 0% Water supply To be provided by KDMC 3. Sewerage (Chamber, lines, Yes 0% -- Septic Tank, STP) 4. Storm Water Drains Yes 0% -- 5. Landscaping & Tree Planting Yes 0% -- 6. Street Lighting Yes 100% Shared across multiple phases of real estate project Community Buildings Yes 100% Shared across multiple phases of real 7. Club House estate project. Amenity Club House on Yes 0% -- Podium – Bldg F 8. Treatment and disposal of Yes 0% -- sewage and sullage water OWC – wet garbage used as manure Dry garbage- hand over to local body 9. Solid Waste management & Yes 100% for recycling Disposal Shared across multiple phases of real estate project. 10. Water conservation Rain Yes 0% -- water harvesting 11. Energy management Yes 0% Roof Top Photovoltaic (RTPV) System proposed 12. Fire protection and fire safety Yes 0% -- requirements 13. Electrical meter room, sub- Yes 0% -- station, receiving station Ar.Shobhana Deshpande (Reg. No. CA/ 87/10647) Murtuza Digitally signed by Murtuza Najmuddin Najmuddin Bhetasiwala Date: 2026.07.13 Bhetasiwala 12:30:33 +05'30' For CREATIONS