Kalyan Dombivli Municipal Corporation APPENDIX D-1 SANCTION OF BUILDING PERMISSION AND COMMENCEMENT CERTIFICATE Revised Building Permit No - 216763 Permit No. : KDMCC/RB/2023/APL/00027 Proposal Code : KDMCC-23-ENTRY-65697 Date : 02/01/2024 Reference:- Building Permission No. : KDMC/NRV/BP/KV/2013-14/20/14 Approval date : 12/04/2019 STILT FLOOR,1ST FLOOR PODIUM,2ND FLOOR PODIUM,1ST Building Name : F(Mixed) Floors : FLOOR,TYPICAL 2ND 3RD 5TH TO 8TH AND 10TH 13TH AND 15TH FLOOR,TYPICAL 4T 9TH AND 14TH FLOOR To, i)Sab Ventures , Johar Hasan Zojwalla And Others, S.NO-2/3,4,5/1 AND 2 S.NO-3A/1/3(PT),S.NO.-4B/1,S.NO-39A,S.NO-40/1,2(P).MOJE-NETIWALI ii) Shobhana Deshpande (Architect) Sir/Madam, With reference to your application No RKDMCC202300209, dated 06-10-2023 for the grant of Revised Building Permission & Commencement Certificate under Section 18/44 of The Maharashtra Regional and Town Planning Act, 1966 read with Maharashtra Municipal Corporations Act, 1949 , to carry out development work / Building on Plot No -, City Survey No./Survey No./Revenue S.No./Khasra No./Gut No. S.NO-2/3,4,5/1 AND 2 S.NO-3A/1/3(PT),S.NO.-4B/1,S.NO-39A,S.NO-40/1,2(P).moje-Netiwali, Final Plot No. -, Sector No. 4, Mouje Netiwali situated at Road / Street -, Society - . The Commencement Certificate / Building Permit is granted under Section 18/45 of the said Act, subject to the following conditions : 1. The land vacated in consequence of the enforcement of the set back line shall form part of the public street. 2. No new building or part thereof shall be occupied or allowed to be occupied or permitted to be used by any person until Occupancy permission has been granted. 3. The Development permission/Commencement Certificate shall remain valid for a period of one year commencing from the date of its issue. 4. This permission does not entitle you to develop the land which does not vest in you. 5. This permission is being issued as per the provisions of sanctioned Development Plan and Development Control Regulations. Any other statutory permission, as required from State and Central Govt. Departments/ undertakings shall be taken by the applicant. If any irregularity is found at later date, the permission shall stand cancelled. 6. Information Board to be displayed at site till Occupation Certificate. 7. If in the development permission reserved land/amenity space/road winding land is to be handed over to the authority in the lieu of incentive FSI, if any, then necessary registered transfer deed shall be executed in the name of authority with in 6 month from the commencement certificate. 8. All the provision mentioned in UDCPR,as may be applicable, shall be binding on the owner/developer. 9. Provision for recycling of Gray water , where ever applicable shall be completed of the project before completion of the building and documents to that if at shall be submitted along with the application form of occupancy. 10. Lift Certificate from PWD should be submitted before Occupation Certificate, if applicable. 11. Permission for cutting of tree, if necessary, shall be obtained from the tree authority. Also the certificate/letter for plantation of trees on the land, if required under the provision of tree act, shall be submitted before occupation certificate. 12. All guidelines mentioned in the environment and forest climate change department, Govt. of Maharashtra, letter no CAP-2023/CR-170,TC-2, shall be followed, if applicable 1/2 Kalyan Dombivli Municipal Corporation APPENDIX D-1 SANCTION OF BUILDING PERMISSION AND COMMENCEMENT CERTIFICATE Revised Building Permit No - 216763 Permit No. : KDMCC/RB/2023/APL/00027 Proposal Code : KDMCC-23-ENTRY-65697 Date : 02/01/2024 13. Authority will not supply water for construction. 14. Areas/cities where storm water drainage system exists or designed, design and drawings from Service consultant for storm water drainage should be submitted to the concerned department of the authority before Commencement of the work and completion certificate of the consultant in this regard shall be submitted along with the application for occupancy certificate. 15. The owner/developer shall submit the completion certificate from the service consultant for completion of the septic tank or proper connection to the sewerage system of the authority or sewage treatment plant (where ever necessary) Signature Not Verified Digitally signed by DISHA PRABHAKAR SAWANT Date: 2024.01.02 19:47:54 IST Reason: Approved Certificate Location: Kalyan Dombivli Municipal Corporation Project Code : KDMCC-23-ENTRY-65697 Application Number : RKDMCC202300209 Proposal Number : 216763 Certificate Number : KDMCC/RB/2023/APL/00027 Assistant Director Town Planning, Kalyan Dombivli Municipal Corporation, Scan QR code for verification of authenticity. 2/2