AMBIAANCEDESIGNPVTLTD Architects " Urban Designcrs & Planncrs" Intcrior Designers Project Management Consultants (PMC) FORM 1 ARCHITECT CERTIFICATE Date : 29/1 1/2023 To, M/s. Joshi & Yash Developers LLP., Punamiya Bhavan, Eduljee Road, Tembhi Naka, Thane - (W). Sub :- Certificate of Percentage of Completion of Construction Work of Bldg of your redevelopment Project "Shree Apartment", having MahaRERA Registration Number as being developed by M/s. Joshi &Yash Developers LLP. (P.0.A.H) Sir, We, Mr. Makarand Toraskar for M/s. Ambiaance Design Pvt. Ltd. have undertaken assignment as Architect of certifying Percentage of Completion of Construction work of "Shree Apartment", having MahaRERA Registration Number being developed by M/s. Joshi & Yash Developers LLP. (P.O.A.H.) Based on Site Inspection, with respect to Layout/ each the Building/Wing of the aforesaid Real Estate Project, Icertify that as on the date of this certificate, the Percentage of work done for each of the building/ wing of the Real Estate Project under MahaRERA is as per table A herein below. The Percentage of the work is executed with respect to each of the activity of the entire phase is detailed in Table B. ...2.. 702/A,B.C, WIFIPark IT Premises Co-op. Soc. Ltd.,Above Hotel Satkar Grande, Near Mulund Check Naka, Wagle Industrial Estate, Thane (W)- 400 604. O:2582 7840/ 2582 8300 ambiaancedesign@gmail.com makarand.urbansolutions@gmail.com www.ambiaancedesign.com ...2... TABLE -A Sr. Tasks / Activity No. (2) Percentage of Actual work Done (1) (As on date of the Certificate ) (3) 1. Excavation 0.00% 2 Basements N.A. 3. Podiums N.A. 4. Plinth 0.00% 5. Stilt Floor 0.00% 6. Slab of Super Structures 0.00% Internal Walls, Internal Plaster, Floorings, Doors 7. 0.00% and Windows within Flat/ Premises 8 Sanitary Fittings within the Flat/ Premises 0.00% 9. Staircases, Lifts Wells and Lobbies at each Floor 0.00% level Overhead and Underground Water Tanks External plumbing & external Plaster, elevation, 10 completion of terraces with waterproofing of the 0.00% Building /Wing Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical Fittings, mechanical equipment, compliance to conditions of environment / CRZ 11. NOC, Finishing to entrance lobby/s, plinth 0.00% protection, paving of areas appurtenant to Building /Wing,Compound Walland all other requirements as may be required to complete project as per specification in agreement of Sale. ...3.. ...3... TABLE -B Sr. Common areas and Facilities Percentage of No. Proposed Actual Work Details (Yes/No) Done (As on date of (1) (2) the Certificate) (3) (5) (4) 1 Internal Road & Footpaths No N.A. N.A. 0.00% U.G. & 0.H. Tank to be 2. Water supply Yes constructed 3. Sewerage (Chamber, Lines, Septic Yes 0.00% Drainage lines isyet tobe Tank, STP) started SWD work is yet to be 4 Storms Water Drains Yes 0.00% started Landscaping - No N.A Tree Planting work yet to Landscaping &Tree Planting Tree Planting-Yes 0.00% be started 6. Street Lighting Yes 0.00% Yet to be started 7. Community Buildings No N.A. N.A. 8. Treatment and disposal of sewerage No N.A. N.A. Sullage water Solid Waste management and 9 No N.A. N.A. Disposal Water Conservation / Rain water 10. Yes 0.00% Yet to be started harvesting 11. Energy Management Yes 0.00% Yet to be started 12. Fire protection and fire safety Yes 0.00% Yet to be started requirements Electrical Meter Room, Sub-Station, Yes 0.00% Electrical Meter Room 13. work yet to be started Receiving Station 14 Others No N.A. No Yours Faithfully, For M/s. Ambiaanee DesignPvtLtd. Ar. Makarand Toraskar (Director) (Lic. No. CA/99/24593) M/s Joshi And Yash Developers LLP. M/s. Joshi & Yash Developers LLP. (P.0.A.H)Partner Date -29/11/2023