ARCHITECTS | PLANNERS | INTERIOR ARCHITECTURE | PROJECT MANAGEMENT FORM 1 ARCHITECT’S CERTIFICATE To Date : 21st March 2024 L&T Seawoods Ltd. 1, L & T House, N.M. Marg, Ballard Estate, Mumbai-400001 Subject: Certificate of Percentage of Completion of Construction Work of L and T Seawoods Residences - Cluster C, comprising Tower C1 & C2 at Seawoods, residences known as ‘L AND T SEAWOODS – West Manor Tower A and B’ situated on the Plot bearing C.N. No / CTS No. / Survey no. Final Plot no R-1, Sector-40, Nerul, Navi Mumbai, demarcated by its boundaries, 20.0m wide road and railway corridor (Nerul side station) to the North, Flyover Bridge to the South, 20.0m wide road followed with railway boundary near Darave 12.5% scheme to the East,30m wide road to the West, of Division Konkan, village Navi Mumbai (M Corp), Taluka Thane, District Thane, PIN 400 706 admeasuring 1348.85 sq.mts. Area being developed by L&T Seawoods Ltd. Sir, I Architect Hiten Sethi, have undertaken assignment as Architect of certifying Percentage of Completion of Construction Work of the L and T Seawoods Residences - Tower C1 & C2 at Seawoods, residences known as ‘L AND T SEAWOODS – West Manor Tower A and B’ Buildings, Tower C01 & Tower C02 of the Project, situated on the plot bearing C. N. No/ CTS No. Survey no. / Final Plot no R-1 of Division Konkan, village Navi Mumbai, Taluka Thane, District Thane, PIN 400706, admeasuring 1348.85 sq.mts. Area being developed by L&T Seawoods Ltd. 1. Following technical professionals are appointed by Owner / Promoter: - (i) M/s Hiten Sethi & Associates as Architect (ii) M/s H.M. Raje as Structural Consultant (iii) M/s Ecofirst Services Ltd as MEP Consultant Based on Site Inspection, with respect to each of the Building / Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building / Wing of the Real Estate Project as applied for RERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in the Table B. Page 1 of 4 ARCHITECTS | PLANNERS | INTERIOR ARCHITECTURE | PROJECT MANAGEMENT Table A L AND T SEAWOODS RESIDENCES-NORTH TOWERS - Tower C01 Sr.No Tasks / Activity Percentage 1 Excavation 100% 2 0 number of Basement(s) and 1 number Plinth 100% 3 2 number of Podiums 0% 4 Stilt Floor Not Applicable 5 8 number of Slabs of SuperStructure 0% 6 Internal walls, Internal Plaster, Floorings within Flats/Premises, 0% Doors and Windows to each of the Flat/Premises. 7 Sanitary Fittings within the Flat/Premises, Electrical fittings with 0% in the Flat/Premises. 8 Staircases, Lifts wells and Lobbies at each Floor level connecting 0% Staircases and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and external plaster, elevation, 0% completion of terraces with waterproofing of the Building/Wing. 10 Installation of lifts, water pumps, Fire Fighting Fittings and 0% Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment/ CRZ NOC, finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to obtain Occupation/ Completion Certificate. Page 2 of 4 ARCHITECTS | PLANNERS | INTERIOR ARCHITECTURE | PROJECT MANAGEMENT L AND T SEAWOODS RESIDENCES -NORTH TOWERS - Tower C02 Sr.No Tasks / Activity Percentage 1 Excavation 100% 2 0 number of Basement(s) and 1 number Plinth 100% 3 2 number of Podiums 0% 4 Stilt Floor Not Applicable 5 8 number of Slabs of SuperStructure 0% 6 Internal walls, Internal Plaster, Floorings within Flats/Premises, 0% Doors and Windows to each of the Flat/Premises. 7 Sanitary Fittings within the Flat/Premises, Electrical fittings with 0% in the Flat/Premises. 8 Staircases, Lifts wells and Lobbies at each Floor level connecting 0% Staircases and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and external plaster, elevation, completion 0% of terraces with waterproofing of the Building/Wing. 10 Installation of lifts, water pumps, Fire Fighting Fittings and 0% Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment/ CRZ NOC, finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to obtain Occupation/ Completion Certificate. Page 3 of 4 ARCHITECTS | PLANNERS | INTERIOR ARCHITECTURE | PROJECT MANAGEMENT TABLE – B Internal & External Development Works in Respect of the project S. No. Common Roads and Facilities, Amenities Proposed Percentage of Details (Yes/No) Work done 1 Internal Roads & Footpaths Yes 0% 2 Water Supply Yes 0% 3 Sewerage (chamber, lines, Septic tank, Yes 0% STP) 4 Storm Water Drain Yes 0% 5 Landscaping & Tree Planting Yes 0% 6 Street Lighting Yes 0% 7 Community Buildings Yes 0% 8 Treatment and disposal of sewage and Yes 0% sullage water 9 Solid Waste management & Disposal Yes 0% 10 Water conservation, Rainwater harvesting Yes 0% 11 Energy Management Yes 0% 12 Fire protection and fire safety Yes 0% requirements 13 Electrical meter room, sub-station, Yes 0% receiving station 14 Others NA NA Yours Faithfully HITEN Digitally signed by HITEN JAGDISHC JAGDISHCHAND HANDER ER SETHI Date: 2024.03.21 SETHI 12:26:39 +05'30' Ar. Hiten Sethi (Reg. No. CA/93/16484) Page 4 of 4