VINAY PATIL & ASSOCIATES • ARCHITECTS • INTERIOR DESIGNERS • GOVT. APPROVED VALUERS 104, NAVNATH PRASAD, OPP. GHANTAU MANDIA, NAUPADA, THANE • 400 601. Emall Address : vpasso@redlffmall.com PHONE : (0) +91 22 7963 3525 (M) +91 98690 34169 / 79TT9 54626 FORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE Date: 13/01/2026 To, The M/s. Lotus Group, Sr.no.99/2/A,100/1/2, 100/2, Opp.Bhoomi Lawns, Nr.Maruti Showroom, Kalyan-Shil Road, Daighar,Thane, Dist-Thane-421204, Subject: Certificate of Percentage of completion of Construction Work of Urban Hills having MahaRERA Registration Number P51700056256 (Only Applicable after project Registration) being developed by M/s. Lotus Group. Sir, I/We Vinay Ramakant Patil have undertaken assignment as Architect /Licensed Surveyor of certifying percentage of Completion of Construction Work of Urban Hills having MahaRERA Registration NumberP51700056256(Only Applicable after project Registration, being developed by M/s. Lotus Group. Based on Site Inspection, with respect to Layout/ each of the Building/Wing of the aforesaid Real Estate Project. I certify that as on the date of this certificate, the Percentage of work done for each of the building/Wing of the Real Estate Project under Maha RE RA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Page lof 4 TABLE-A Building Number A (to be prepared separately for each Layout/Building/Wing of the Project) Sr. Tasks/ Activity Percentage of Actual Work No. (2) Done (1) (As on date of the Certificate) (3) 1. Excavation 100% 2. Basements (if any) 100% l 3. Podiums (if any) 4. Plinth 100% 5. Stilt Floor 100% 6. Slabs of Super Structure 33% 7. Internal walls, Internal Plaster, Floorings, Doors and 3% windows within Flats/Premises 8. Sanitary Fittings within the flat/premises 9. Staircases, Lifts Wells and Lobbies at each Floor, level Overhead and Underground Water Tanks 10. External plumbing and external plaster, elevation, I completion of terraces with waterproofing of the Building/Wing. 11. Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFT NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Page 2of 4 TABLE-A Building Number B (to be prepared separately for each Layout/Building/Wing of the Project) T Sr. Tasks/ Activity Percentage of Actual Work No. (2) Done (1) (As on date of the Certificate) (3) 1. Excavation 100% 2. Basements (if any) 100% 3. Podiums (if any) 4. Plinth 100% 5. Stilt Floor 100% 6. Slabs of Super Structure 63% 7. Internal walls, Internal Plaster, Floorings, Doors and windows within Flats/Premises 8. Sanitary Fittings within the flat/premises 9. Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks 10. External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing. • 1 11. Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFT NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Page 3of 4 TABLE-B Common Areas (Internal and External Developm ent Works) in respect of the Registere d Phase / Project Number Sr. Common areas and facilities Proposed Percentage of Details No. (2) (Yes /No) Actual Work Done (5) (1) (3) (As on date of the Certificate ) (4) ---- - --- 1. Internal Roads & Footpaths l NO Not Executed 2. Water Supply YES i YES Not Executed 3. Sewerage (Chamber, lines, Septic Tank, STP). - Not Executed 4. Storm Water Drains _(__ YES J I YES Not Executed 5. La~dscapJng & T~ee Pla_n_!in_g_ 6. Street Lig~ting --- -♦- I NO l 7. Communi ty Buildings NO YES Not Executed 8. Treatmen t and disposal of sewage and sullage water. Not ExecutPcf 9. Solid Waste managem ent & Disposal YES Not Executed 10.1 Water co~serva t:n / Rai~ wat~arve sting j 11. Energy managem ent YES Not Executed 12. Fire protection and fire safety requireme nts YES Not Executed 13. Electrical meter room, sub-station, receiving YES Not Executed station. L I 14. Others (Option to Add more). I Yours Faithfully, For Vinay Patil & Associ ates. ,Jl Archite ct: Anway Patil ( License No. CA/20I6/ 792I I) Agreed and Accepted by: ~ Signature of Promoter Name: For LOTUS GROU Date: Page 4of 4