KARAN M. SHARMA MOB: 7276236242 KARANJALI ARCH ARCHITECTURAL PLANNERS & ENGINEERS BK.NO.944/17, SECTION -21, ULHASNAGAR-421003 . Date: 02.07.2025 FORM 1 ARCHITECT’S / L.S. CERTIFICATE To, CHETANA DEVELOPERS., MAHESHVARA AVENUE, SHAHAPUR, Tal: SHAHAPUR. Subject: Certificate of Percentage of Completion of Construction Work of BUILDING NO. 1, 2 & BUNGALOW NO.1 & 2 OF “MAHESHVARA AVENUE” having MahaRERA Registration Number P51700055646 being developed by CHETANA DEVELOPERS. Sir, I/ We KARAN MAHENDRA SHARMA have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of BUILDING NO. 1, 2 & BUNGALOW NO.1 & 2 OF “MAHESHVARA AVENUE” MahaRERA Registration Number P51700055646 being developed by CHETANA DEVELOPERS. Based on Site Inspection, with respect to each of the Building/Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A (BUILDING NO. 1) Sr No. Task/Activity Percentage of Work Done 1. Excavation 0% 2. Basement (if Any) N.A. 3. Podiums (if Any) N.A. 4. Plinth 0% 5. Stilt Floors 0% 6. 17 number of Slabs of Super Structure 0% 7. Internal Walls, Internal Plaster, Flooring, Doors 0% and Windows within the flat/premises 8. Sanitary Fitting within the Flat/Premises, 0% 9. Staircases, Lifts wells and Lobbies at each 0% floor level, overhead and underground water tanks 10. External plumbing external plaster, elevation 0% completion of terraces with water proofing of Building/wing 11. Installation of lifts, water pumps, fire fighting 0% fitting and equipment as per CFO NOC, Electrician Fittings to Common areas, Electro, mechanical equipment, compliance to conditions of environment/CRZ/NOC, finishing to entrance lobby, plinth protection, paving of areas appurtenant to building/wing, Compound Wall and all other requirement as may be required to complete project as per specifications as per agreement of sale. Table A (BUILDING NO. 2) Sr No. Task/Activity Percentage of Work Done 1. Excavation 100% 2. Basement (if Any) N.A. 3. Podiums (if Any) N.A. 4. Plinth 100% 5. Stilt Floors 100% 6. 8 number of Slabs of Super Structure 12% 7. Internal Walls, Internal Plaster, Flooring, Doors 0% and Windows within the flat/premises 8. Sanitary Fitting within the Flat/Premises, 0% 9. Staircases, Lifts wells and Lobbies at each 0% floor level, overhead and underground water tanks 10. External plumbing external plaster, elevation 0% completion of terraces with water proofing of Building/wing 11. Installation of lifts, water pumps, fire fighting 0% fitting and equipment as per CFO NOC, Electrician Fittings to Common areas, Electro, mechanical equipment, compliance to conditions of environment/CRZ/NOC, finishing to entrance lobby, plinth protection, paving of areas appurtenant to building/wing, Compound Wall and all other requirement as may be required to complete project as per specifications as per agreement of sale. Table A (BUNGALOW NO. 1) Sr No. Task/Activity Percentage of Work Done 1. Excavation 0% 2. Basement (if Any) N.A. 3. Podiums (if Any) N.A. 4. Plinth 0% 5. Stilt / Ground Floor 0% 6. 2 number of Slabs of Super Structure 0% 7. Internal Walls, Internal Plaster, Flooring, Doors 0% and Windows within the flat/premises 8. Sanitary Fitting within the Flat/Premises, 0% 9. Staircases, Lifts wells and Lobbies at each 0% floor level, overhead and underground water tanks 10. External plumbing external plaster, elevation 0% completion of terraces with water proofing of Building/wing 11. Installation of lifts, water pumps, fire fighting 0% fitting and equipment as per CFO NOC, Electrician Fittings to Common areas, Electro, mechanical equipment, compliance to conditions of environment/CRZ/NOC, finishing to entrance lobby, plinth protection, paving of areas appurtenant to building/wing, Compound Wall and all other requirement as may be required to complete project as per specifications as per agreement of sale. Table A (BUNGALOW NO. 2) Sr No. Task/Activity Percentage of Work Done 1. Excavation 0% 2. Basement (if Any) N.A. 3. Podiums (if Any) N.A. 4. Plinth 0% 5. Stilt / Ground Floor 0% 6. 2 number of Slabs of Super Structure 0% 7. Internal Walls, Internal Plaster, Flooring, Doors 0% and Windows within the flat/premises 8. Sanitary Fitting within the Flat/Premises, 0% 9. Staircases, Lifts wells and Lobbies at each 0% floor level, overhead and underground water tanks 10. External plumbing external plaster, elevation 0% completion of terraces with water proofing of Building/wing 11. Installation of lifts, water pumps, fire fighting 0% fitting and equipment as per CFO NOC, Electrician Fittings to Common areas, Electro, mechanical equipment, compliance to conditions of environment/CRZ/NOC, finishing to entrance lobby, plinth protection, paving of areas appurtenant to building/wing, Compound Wall and all other requirement as may be required to complete project as per specifications as per agreement of sale.