Annexure A FORM 1 ARCHITECT'S CERTIFICATE (As on 31/03/2025) Date:-31/03/2025 REF NO:-DAID/RR/728/24-25/L1 To, M/s. Today Royal Buildcon. 1201, Siddhi grendeur, Plot No - 84, Sector - 19, Kharghar, Navi Mumbai – 410 210 SUBJECT: Certificate of Percentage of Completion of Construction Work of 1Building of the project “MOUNT BLISS” [P51700055627] situated on Plot No. 01, Sector- 31 at Belapur, Navi Mumbai., 30Mtr Wide Road to the South, Plot no. 02 (Build.) to the North & Pro 5.50M.W. Channel to the East, 15Mtr Wide Road to the West; of Division- KONKAN, Taluka-Panvel, District-Raigad, Pin No.- 410206; admeasuring 2827.56 sq.mts .area being developed M/s. Today Royal Buildcon. I, AR. RAHULKUMAR V. CHHABHAIYA, partner of M/s. Destination Architecture Interior Designs, have undertaken assignment as Architect of certifying Percentage of Completion of Construction Work of the 1 Building of the of the Project ‘MOUNT BLISS’, situated on the on Plot No. 01, Sector- 31 at Belapur, Tal. -Panvel, Dist.-Raigad, Pin No. – 400 614; admeasuring 2827.56 Sq.mts. area being developed by M/s. Today Royal Buildcon. 1. Following technical professionals are appointed by Owners / Promoters: - (i) M/s. DESTINATION ARCHITECTURE INTERIOR DESIGNS as Architect; (ii)M/s. ADHARSHILA as Structural Consultant (iii) M/s BUILDCON MEP SERVICES CONSULTANT as MEP Consultant (iv)Mr. as Site Supervisor Based on Site Inspection, with respect to each of the Building/Wing of the aforesaid Real Estate Project , I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project as registered vide number P51700055627 under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Date: - 31/03/2025 Table A Project – MOUNT BLISS 1) Building 1(Wing – A) Sr. Tasks /Activity Percentage of No work done 1 Excavation 100% 2 3 Basement and 1 Plinth 15% 3 Podium 0% 4 Stilt Floor 0% 5 4 Slabs of Super Structure (0 Slab constructed out of 12) 0% 6 Internal walls 0% Internal Plaster 0% Floorings within Flats/Premises 0% Doors and Windows to each of the Flat/Premises 0% 7 Sanitary Fittings within the Flat/Premises 0% Electrical Fittings within the Flat/Premises 0% 8 Staircases (R.C.C. Work) 0% Lifts Wells (R.C.C. Work) 0% Lobbies (R.C.C. Work) 0% Overhead Water Tanks 0% Underground Water Tanks 0% 9 External plumbing 0% External plaster 0% Elevation 0% Completion of terraces with waterproofing 0% 10 Installation of lifts 0% Installation of water pumps 0% Fire Fighting Fittings and Equipment as per CFO NOC 0% Electrical fittings to Common Areas 0% Electro mechanical equipment 0% Compliance to conditions of environment /CRZ NOC N.A. Finishing to entrance lobby/s 0% Plinth protection 0% Paving of areas appurtenant to Building/Wing 0% Compound Wall 0% All other requirements as may be required to Obtain Occupation 0% /Completion Certificate Date: - 31/03/2025 Table A Project – MOUNT BLISS 1) Building 1(Wing – B) Sr. Tasks /Activity Percentage of No work done 1 Excavation 80% 2 3 Basement and 1 Plinth 15% 3 Podium 0% 4 Stilt Floor 0% 5 4 Slabs of Super Structure (0 Slab constructed out of 12) 0% 6 Internal walls 0% Internal Plaster 0% Floorings within Flats/Premises 0% Doors and Windows to each of the Flat/Premises 0% 7 Sanitary Fittings within the Flat/Premises 0% Electrical Fittings within the Flat/Premises 0% 8 Staircases (R.C.C. Work) 0% Lifts Wells (R.C.C. Work) 0% Lobbies (R.C.C. Work) 0% Overhead Water Tanks 0% Underground Water Tanks 0% 9 External plumbing 0% External plaster 0% Elevation 0% Completion of terraces with waterproofing 0% 10 Installation of lifts 0% Installation of water pumps 0% Fire Fighting Fittings and Equipment as per CFO NOC 0% Electrical fittings to Common Areas 0% Electro mechanical equipment 0% Compliance to conditions of environment /CRZ NOC N.A. Finishing to entrance lobby/s 0% Plinth protection 0% Paving of areas appurtenant to Building/Wing 0% Compound Wall 0% All other requirements as may be required to Obtain Occupation 0% /Completion Certificate Date: - 31/03/2025 TABLE-B Project – MOUNT BLISS Internal & External Development Works in Respect of the entire project Sr. Common areas and Facilities, Proposed % of Details No. Amenities (Yes/No) Work done 1 Internal Roads &Footpaths No - N.A. 2 Water Supply Yes 0% Not commenced. Will be provided as per UDCPR 3 Sewerage (chamber, lines, Yes 0% Not commenced. Will be Septic Tank , STP) provided as per UDCPR 4 Storm Water Drains Yes 0% Not commenced. Will be provided as per UDCPR 5 Landscaping & Tree Planting Yes 0% Not commenced. Will be provided as per UDCPR 6 Street Lighting No - N.A. 7 Community Buildings No - N.A. 8 Treatment and disposal of No - N.A. sewage and sullage water 9 Solid Waste management & No - N.A. Disposal 10 Water conservation, Rain Yes 0% Not commenced. Will be water harvesting provided as per UDCPR 11 Energy management No - N.A. 12 Fire protection and fire safety Yes 0% Not commenced. Will be requirements provided as per UDCPR 13 Electrical meter room, sub- Yes 0% Not commenced. Will be station, receiving station provided as per UDCPR Yours Faithfully, FOR, DESTINATION Architecture Interior Designs Digitally signed by Ar. Rahulkumar V. Chhabhaiya DN: cn=Ar. Rahulkumar V. Chhabhaiya, o=DESTINATION Architecture Interior Designs, ou, email=destination.ind1@gmail.c om, c=IN Ar. Rahulkumar V. Chhabhaiya (License no. CA/2012/55320) Agreed and Accepted by M/s. Today Royal Buildcon. Name: Date: