:0 VIVANSH ASSOC_TATES STRUCTTJRAT, ENGINEER, ARCTIITECTS & INTERIOR DESIGNERS Address: 2684, Sape Village, Kalyan - Padgha road, Padgha, Bhiwandi, Thane, Pincode:421101. Email-id: vivanshassociates@gmail.com, patilganesh3 0 492@gmail.com Contact: +9 l -9 527 285848, +9 I -97 66087 611 Annexure B FORM 2 [see Regulation 3] ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoang Project and for withdrawal of Money from Designated Account-Project Wise) oate: g1)l2fzozS To, LEGACY BUILDERS & INNOVATORS Thane, MAHARASHTRA,42I 301 Subject: Certificate of Cost lncurred for Development of VISHNU BLISS having MahaRERA Registration Number P51700055630 (Only Applicable after project Registartion) being developed by LEGACY BUTLDERS & INNOVATORS Sir, lAA/e VIVANSH ASSOCIATES have of Certifying Estimated Cost for VTSHNU BLISS having MahaRERA Registration Number P51700055630 (Only Applicable after project Registration, being developed by LEGACY BUTLDERS & TNNOVATORS ) 2.We have Estimated the cost of Civil, MEP and allied works required for completion of the apartments and proportionate completion of internal & extemal works of the project as per specifications mentioned in agreements of sale. Our estimated cost calculations are bassd on the drawingsi/plans made available to us for the project under reference by the Developer / Consulatants. The Schedule of items and quantity required for the entire work as calculated by Quantity Surveyor* appointed by Developer/Engineer, the assumption ofthe cost of material,labour and other inputs made by developer,and the site inspection carried out by us to ascertain / confirm the above analysis given to us, 3. We estimate Total estimated the Cost of completion of thc aforesaid project under reference at Rs. 30370i00.00 (Total of Table A and B) at the time of Registration. The estimated Total Cost ofproject is with reference to thc Civil, MEP and Allied works required for completion of the apartments and proportionate completion of internal & external works,as per specifications mentioned in agreements of sale and for the purpose of the obtaining occupation certificate / completion certificate for the Building(s) /Wing(s)/ Layout lPlotted Development from the KALyAN DOMBIVLI MUNICIPAL CORPORATION being the Planning Authority under whose jurisidiction the aforesaid project is being implemented. 4.The Estimated Cost incured till date is calculated at Rs. 31687885.00 (Total of Table A and B).Thc amount of Estimated Cost incurred is calculated on the basis of input materials/services used and unit cost of these items. Page 1 of 4 5. The Balance Cost of Completion of the Civil, MEP and Allied works fur completion of the apartments and proportionate Complition of internal & external works, as per specification mentioned in agreement of sale, of the Project is estimated at Rs 3690215.00 (Total of Tabte A and B) 6. I certify that the Cost of the Civil, MEP and allied works the for the apartments and proportionate ate internal & external works,as per specification mentioned in agreement of sale, of the aforesaid Project as completed on the date of this certificate is as given in Table A and B below: Table-A /Layout Plotted Number:VISHNU BLISSNA Sr. No. Particulars Amount (ln Rs.) 'otal 1 Estimated Cost of the 36902000.0c 2 34318860.00 3ost incurred as on date of certificate J iVgrk done in Percentaqe (as Percentaoe of the estimaiecj cost) YJ.UU 4 lAlance Cost to be lncuned**(Based on Estimated Cost) 2583140.00 5 t lncurred on the AdditionallExtra ilems not included in th 0 Page 2 of 4 Table B lnternal and External Devetopment Wor&s in respect ofthe Phase Sr. No. Particulars Amount {ln Rs.) Ilt 1 Total Estimated Cost of the BuildinqMinc/Lavout 1476100.00 Fiottetj Deveiopnient as orr daic o'rheuis-iratioir is 2 Cosl incuned as on date of certificate 369025.00 3 Work dolq in Percentage (as percentaqe of the estimated cost) 25.00 4 Balance Cost to be lncuned**(Based on Estimated Cost) 1 107075.00 5 Cost lncurred on the Additional/Extra items not included in the Estimated Cost (Tablc -C) VIVANSH ASSOCIATES P:'or:rietor Signature & Name (lN BLOCK LETTERS) with Starhp of Engineer [Not Less than bachelods Degree Holder or equivalent as per scction 2(u) of thc Act] Local Authority license no. STATE/R/202/UAPU14533 (if appticabte) Date of Certificate: t' B.#E Agreed and Accepted by: Signature of Promoter Name: LEGACY BUILDERS & |]{I{OVATORS Date: f \ lo{Zozo 1.The scope of work is to comflete Registered Real Estate Prciect as per drawings approved from time to time and as per specifications mentioned in agreement of sale. 2.(') Quantity survey can be done by office of Engineer or can be done by an independent euantity Surveyor,whose certificate of ln case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (') and in case quantity are being calculated by office of Engineer,the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (*). 3'(") Balance Cost to be incuned (4) may vary fiom Difference between Total estimated Cost (1) ancl Actual Cost incuned (2) due to deviation in quantity required / escalation of cost etc. As this is an estimated cost, any deviation in quantity required for development of the Real Estate Project will result in amendment of the cost incurrsd / to be incurred. 4.All components of work with specifications are indicative and not exhaustive S.Please specify if there are any deviations / qualifications. Example: Any deviations in input material used from specifications in agreement of sale. Page 3 of 4 TABLE C List of Extra/Additional/Deleted ltems considered in Gost. (which were not part of the original Estimate of Total Cost) Page 4 of 4