VI-VANH ASSOCTATES STRUCTURAL ENGINEER, ARCTIITECTS & INTERIOR DESIGNERS Address: 268A, Sape Village, Kalyan - Padgha road, Padgha, Bhiwandi, Thane, Pincode : 42 1 101 . Email-id: vivanshassociates@gmail.com, patilganesh30 492@gmall.com Contact: +91 -9527285848, +91 -97 66087 617 Annexure B FORM 2 [see Regulation 3] ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account-Project Wise) oate: $pf g llzozS lo, LEGACY BUILDERS & INNOVATORS Thane, MAHARASHTRA,421 301 Subject: Certificate of Cost lncuned for Development of VISHNU BLISS having MahaRERA Registration Number P51700055630 (Only Applicable after project Registartion) being developed by LEGACY BUTLDERS & INNOVATORS Sir, lAlVe VIVANSH ASSOCIATES have of Certifying Estimated Cost for VISHIIIU BLISS having MahaRERA Registration Number P51700055630 (Only Applicable after project Registration, being devetoped by LEGACY BUTLDERS & TNNOVATORS ) 2.We have Estimated the cost of Civil, MEP and allied works required for completion of the apartments and proportionate completion of intemal & extemal works of lhe project as per specifications mentioned in agreements of sale. Our estimated cost calculations are bassd on the drawings/plans made available to us for the project under reference by the Developer / Consulatants. The Schedule of items and quantity reguired for the entire work as calculated by Quantity Surveyor* appointed by Developer/Engineer, the assumption ofthe cost of material,labour and other inputs made by developer,and the site inspection carried out by us to ascertain / confirm the above analysis given to us. 3. We estimate Total estimated the Cost of completion of thc aforesaid project under reference at Rs. 34320100.00 (Total of Table A and B) at the time of Registration. The estimated Total Cost ofproject is with reference to thc Civil, MEP and Allied works required for completion of the apartments and proportionate completion of internal & external works,as per specifications mentioned in agreements of sale and for the purpose of the obtaining occupation certificate / completion certificate for the Building(s) M/ing(s)/ Layout /Plotted Development from the KALyAN DOMBIVLI MUNIGIPAL CORPORATION being the Planning Authority under whose jurisidiction the aforesaid project is being implemented. 4.The Estimated Cost incured till date is calculated at Rs. 33211800.00 (Total of Table A and B).The amount of Estimated Cost incurred is calculated on the basis of input materials/services used and unit cost of these items. Page '1 of 4 5. The Balance Cost of Completion of the Civil, MEP and Allied works for completion of the apartments and proportionate Complition of internal & external works, as per specification mentioned in agreement of sale, of the Project is estimated at Rs 5166300.00 fl-otal of Table A and B) 6' I certify that the Cost of the Civil, MEP and allied works the for the apartments and proportionate ate internal & external works,as per specification mentioned in agreement of sale, of the aforesaid Project as completed on the date of this certificate is as given in Table A and B below: Table-A Plotted Number:VISHNU BLISSNA Sr- No- Particulars Amount (ln Rs.) 1 Estimated Cost of the 36902000.00 2 3321 1800.00 incuned as on date of certificate 3 rflork done in Percentage (as Percentage of the estimated cost) 90.00 4 lqlence Cost to be lncuned**(Based on Estimated Cost) 36S0200 00 5 lncurred on the Additional/Extra items not included in the 0 Page 2 of 4 Table B lnternal and External Development Works in respect of the Phase Sr. No. rs Amount(ln Rs.) Ilt 1 Total Estimated Cost of the BuildingMing/Layout 1476100.00 Plqtted Development as on date ofheoiJtrati6n is 2 Cost incuned as on date of certificate 0 3 Work done in Percentage (as percentage of the estimated cost) 0 4 Balance Cost to be [ncurred*(Based on Estimated Cost) 1476100.00 5 Cost lncurred on the Additional/Extra items not included in the EstimAled Cost (Tablc -C) Yours Faithfully VIVANSH ASSOCIATES Signature & Name (lN BLOCK LETTERS) with Stamp of Engineer [Not Less than bachelo/s Degree Holder or equivalent as per scction 2(u) of thc Act] Local Auth ority cen se no. STATE/R/2 O2tt ApU 1 1533 (if applicabte) I i Date of Certificate: Agreed and Accepted by: Signature of Promoter Name: LEGACY BUILDERS & INNOVATORS Date: ff f tOlZoZS 1.The scope of work is to complete Registered Real Estrate Project as per dr:awings approved from time to time and as per specifications mentioned in agreement of sale. 2.(-) Quantity survey can be done by office of Engineer or can be done by an independent euantity Surveyor,whose certificate of ln case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (.) and in case quantity are being calculated by office of Engineer,the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (*). 3.('") Balance Cost to be incuned (4) may vary from Difference between Total estimated Cost (1) and Actual Cost incurred (2) due to deviation in quantity required / escalation of cost etc. As this is an estimated cost, any deviation in quantity required for development of the Real Estate Project will result in amendment of the cost incurred / to be incurred. 4.All components of work with specifications are indicative and not exhaustive S-Please specify if there are any deviations / qualifications. Example: Any deviations in input material used from specifications in agreement of sale. Page 3 cf4 TABLE C List of Extra/Additional/Deleted ltems considered lr Gost. (which were not part of the original Estimate of Total Cost) Page 4 of 4