VIVANSH ASSOCIATES STRUCTURAL ENGINEER, ARCHITECTS &INTERIOR DESIGNERS Address: 268A, Sape Village, Kalyan - Padgha road, Padgha, Bhiwandi, Thane, Pincode :421)01 Email-id: vivanshassociates@gmail.com, patilganesh30492@gmail.com Contact: +91-9527285848, +91-9766087617 FORM 2- [see Regulation 3] ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: 30-09-2024 To M/s. Legacy Builders and Innovators. Office Address: Office No.1, Neerai Heights, Gauripada Road, Gauripada, Kalyan (W). Subject:Certificate of Cost Incurred for Development of Vishnu Blissfor Construction situated on the land bearing S. No. 40, H. No. 1/E at Village. Chikanghar, Tal. Kalyan, Dist. Thane. being developed by M/s. Legacy Builders and Innovators. Sir, Estimated Cost We M/s. Vivansh Associates have undertaken assignment of certifying Real Estate Project proposed to be registered under MahaRERA, beng for the Subject Vishnu Bliss Being developed by M/s. Legacy Builders and Innovators. 1. We have estimated the cost of completion to obtain Cccupation Certificate / Completion Certificate, of the Civil, MEP and Allied works, of the Building (S) of the project. Our estimated cost calculations are based on the Drawings/ plans work as made available to us for the project under references by the entire of calculated by appointed Civil Engineer, and the assumption of the cost material, labor and other inputs made by developer, and the site inspection carried out by us. 2. We have estimated Cost of completion of the building of the aforesaid project Total under Reference as Rs. 2,31,41,800 (Total of Table A and B).The estimated Cost of project with reference to the Civil, MEP and allied works required to be completed for the purpose of obtaining occupation certificate for the building from the KDMC being the planring Authority under whose_ jurisdiction the aforesaid project is being implemented. 3. The Estimated Cost Incurred till date is calculated as Rs. 1,40,00, 000 (Total of Table Aand B). The amount of Estimated Cost Incurred is calculated on the base of amount of Total Estimated Cost. 4. The Balance cost of Completion of the Civil, MEP and Allied works of the Building of the subject project to obtain Occupation Certificate from KDMC (planning Authority) is estimated at Rs. 91,41,800 (Total of Table Aand B). 5. Icertify that the Cost of the Civil, MEP and allied work for the aforesaid Project as completed on the date of this certificate is as given in Table A and B below: TABLE-A Building bearing Number Building 1 (to be prepared separately for each Building/Wing of the Real Estate Project) Sr. No. Particulars Amounts Total Estimated cost of the building/wing as on Rs. 2,22,51, 800 18/ 05 /2023 2 Cost incurred as on 30/ 09 /2024 based on the Estimated Rs. 1,40,00, 000 Cost Work done in percentage (as percentage of the estimated 60% 3 cost) 4 Balance cost to be Incurred (Based on estimated cost) Rs. 82,51,800 Cost Incurred on additional /Extra items As on 30/ 09 /2024not included in The estimated Cost (Annexure A)