EMERGE ARCHITECTS&ASSOCIATES PLANNER, PROJECT CONSULTANTS, INTERIOR DESIGNERS & ENGINEERS. Address -C-7, Hibiscus Apartment, Godrej HillRoad, Khadakpada, Kalyan (W)-421301 Email id -dhirajp616@gmail.com Contact No- +91-9096664838 Date: 30-09-2024 FORM 1 [see Regulation 3] ARCHITECTS CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) To M/s. Legacy Builders and Innovators. Office Address: Office No.1, Neerai Heights, Gauripada Road,Gauripada, Kalyan (W). Subject: Certificate of percentage of completion of construction work of Vishnu Bliss, situated on the land bearing S. No. 40, H. No. l /E at Village. Chikanghar, Tal. Kalyan, Dist. Thane. Being developed by M/s. Legacy Builders and Innovators. Sir, We, M/s. Emerge Architect &Associates have undertaken assignment as an Architect of certifying Percentage of Completion of construction Work of Vishnu Blissbeing developed by M/s. Legacy Builders and Innovators. Based on site inspection, and the detail reporting from site supervisor with respect to Layout/ each of the building / wing of the aforesaid Real Estate Project. I certify that as on the date of this certificate, the percentage of work done for each of the building / wing of the Real Estate Project under MahaRERA number is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A Building of the Project. % of work Tasks/Activity Sr. No done 100 Excavation N.A. Basement N.A. 3 Podiums (if any) 100 Plinth 70 Stilt Floor (Part.) 100 6 Fifth Number Slabsof Super Structure 60 and Windows within 7 Internal walls, Internal Plaster, Flooring,Doors Flats/Premises 25 Sanitary Fittings within the Flat/Premises, 75 level Overhead and Staircases, Lifts Wellsand Lobbies at each Floor Underground water tanks 40 10 External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing, 11 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC,Electrical fittings, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreementof Sale. Any other activities. TABLE-B Common Areas (Internal 8& External Development Works) in respect of the Registered Phase Sr. Common areas and Facilities Proposed % of Details No (Yes/No) Work done 1 Internal Roads &Footpaths No. N.A 2 Water Supply Yes. 3. Sewerage (chamber, lines) Yes. 4. Storm Water Drains Yes. 0 Yes. 5. Landscaping &Tree Planting N.A. 6. Street Lighting No. 7. Community Buildings No. N.A. 8. Treatment and disposal of sewage and sludge No. N.A. water No. N.A. 9. Solid Waste management &Disposal 10. Water Conservation, Rain water harvesting No. N.A. 11. Energy management(Solar Water Heating No. N.A. System) No. N.A. 12. FireProtection and fire safety requirements 13. Electrical meter rOom Yes. 14. Others (Option to Add more) Yours Faithfully, Agreed & Accepted by: Emerge Architects & Associates VA SHRI. DHIRAJBHARAT PAT0L: M/s. Legacy Builders and Innovators. . Date: 30-09-2024 (License No. CA/2016/79531)