~\,'•,\ VIVANSH /\SS ()C' JJ\T FS NERS -~ STl{l/C TUIUL ENGIN E El{, ARCII ITECT S & INTER IOR DESIG Pincode: 421 101. Address: 2681\, Sapc Village, Kalyan - Padgha road, Padgha, Bhiwandi, Thane, Email-id : vivanshassocialcs@gmai l.com, pati1gancsh30492@gmail.com Contact: +91 -9527285848 +9 1-97660876 17 ' FORM 2- [see Regul ation 3] ENGI NEER 'S CERTIFICATE and for (To be submi tted at the time of Registration of Ongoi ng Projec t withd rawal of Mone y from Design ated Account) Date: 31-01-2024 To M/s. Legac y Builde rs and Innovators. pada, Kalya n Office Addre ss: Office No.l, Neera i Heights, Gauripada Road, Gauri (W). for Construction Subject: Certificate of Cost Incurr ed for Development of Vishnu Bliss , Tai. Kalyan, situated on the land bearin g S. No. 40, H. No. l /Eat Village. Chikanghar ators. Dist. Thane . being develo ped by M/s. Legac y Builde rs and Innov Sir, ing Estimated Cost We M/s. Vivan sh Assoc iates have undert aken assignment of certify red under MahaR ERA, being for the Subject Real Estate Project propo sed to be registe Innov ators. Vishnu Bliss Being develo ped by M/s. Legac y Builde rs and ation Certificate / 1. We have estima ted the cost of completion to obtain Occup g($) of Comp letion Certificate, of the Civil, MEP and Allied works, of the Buildin ngs/ plans the projec t. Our estima ted cost calculations are based on the Drawi work as made availa ble to us for the projec t under refere nces by the entire the cost of calcul ated by appoin ted Civil Engineer, and the assumption of inspec tion material, labor and other inputs made by develo per, and the site carrie d out by us. aid projec t 2. We have estima ted Cost of completion of the buildin g of the afores ted Total under Refere nce as Rs. 2,31,41,800 (Total of Table A and B).The estima and allie d works requ ired to be Cost of proj ect with refe renc e to the Civil, MEP pation certificate for the building com plet ed for the purp ose of obtaining occu ority und er whose_ juris diction the from the KDMC bein g the planning Auth afor esai d proj ect is bein g implemented. calc ulate d as Rs. 69,7 1,00 0 (Total of 3. The Estimated Cost Incu rred till date is Incu rred is calc ulate d on the base Tabl e A and B). The amount of Estimated Cost of amount of Total Estimated Cost. Civil, MEP and Allied wor ks of the 4. The Balance cost of Completion of the pation Certificate from KDM C Building of the subj ect proj ect to obtain Occu , 70,800 (Total of Tabl e A and B). (planning Authority) is estimated at Rs. 1,61 allied work for the afor esai d Proj ect 5. I certify that the Cost of the Civil, MEP and as given in Table A and B below: as com plete d on the date of this certificate is TABLE-A Building bear ing Number Buil ding 1 /Wing of the Rea l Esta te Project) (to be prep ared sepa rate ly for each Building Particulars Amounts Sr. No. Rs. 2,22 ,51,8 00 l Total Estimated cost of the building/wing as on 31/0 1/20 24 Estimated Rs. 69,71,000 2 Cost incu rred as on 31/ Ol /2024 base d on the cost estim ated 30% 3 Work done in perc enta ge (as perc enta ge of the cost) cost) Rs. 1,52,80,800 4 Balance cost to be Incurred (Based on estimated s Cost Incurred on additional I Extra items As on 31/ 01 --. Cost (Ann exure A) /202 4 not included in The estimated I ( TABLE-B (To be prepare d separate ly for entire register ed phase of the Real Estate Project) Amounts Sr. No. Particulars Rs . 8,90,000 .00 1 Total Estimate d cost of the Internal and External Develop ment works including amenities and facilities in the Layout as on 31/ Ol /2024 2 Cost incurred as on 31/01/2 024 based on the Estimated - -- cost 3 Work done in percenta ge (as percenta ge of the estimate d --- cost) Rs. 8,90,000 .00 4 Balance cost to be Incurred (Based on estimated cost) s Cost Incurred on addition al/ Extra items As on 31/ 01 --- /2024 not included in The estimated Cost (Annexure A) Yours Faithfully, For Vivansh Associ JP GANESH PANDIT (Structural Engine • *Note e entir e Real Estate Project as per draw ings 1. The scop e of work is to complet Occupation Certifica te. appr oved from time to time so as to obtain e of Eng inee r or can be don e by an 2. (*) Quantity surv ey can be done by offic ficate of quantity calc ulat ed can be inde pend ent Quantity Surveyor, whose certi pend ent quantity surv eyor bein g relie d upo n by the Engineer. In case of inde mentioned at the plac e mar ked (*) appo inte d by Developer, the name has to be office of Eng inee r, the nam e of the and in case quantity are bein g calculated by onsi ble for the quantity calc ulat ed pers on in the office of Engineer, who is resp ). should be mentioned at the plac e marked(* material, equi pme nt and mac hine ry 3. The estimated cost includes all labour, requ ired to carr y out entire work. in quantity requ ired for deve lopm ent 4. As this is an estimated cost, any deviation ndment of the cost incu rred /to be of the Real esta te Project will result in ame incurred. are indicative and not exha ustiv e. 5. All components of work with specifications J