A TYPICAL - 3, 8, 13, 18, 23, 28, 33, 38 FLOOR PLAN PLAN (O/H)TANK(2) LIFT MACHINE ROOM PROJECT TYPE - Building Development 5.00 2.55 5.00 5.25 5.00 1.61 1.59 6.74 W2-H:1.8 W3-H:1.8 W3-H:1.8 W2-H:1.8 5.00 2.55 5.00 5.25 5.00 1.61 1.59 6.74 01 STAIRCASE CABIN SEAL OF APPROVAL W1-H:1.8 W1-H:1.8 07 Polygon Area 1.20 A-Block 1359.40 BED ROOM BED ROOM TERRACE FLOOR 2.15x2.45 2.15x2.45 5.76 5.76 01 2.65 BED ROOM BED ROOM 02 4.11 3.10 5.76 2.75x3.60 2.75x3.60 5.76 Digitally signed by SATISH 03 172.17 AUTH_SIGN_1 PANDHARINATH UGILE Date: 04 Mar 2024 15:04:24 Organization :Thane Municipal Corporation 1.45 1.45 FORTIETH FLOOR D2 LIV./DIN. LIV./DIN. D2 Designation :Assistant Director Town D2 04 161.01 Planning 3.55x4.15 3.55x4.15 D2 03 05 6.28 2.95 D3 D3 D3 AUTH_SIGN_2 D3 06 132.79 303 803 1303 1803 2303 2803 3303 THIRTYNINTH FLOOR TOILET TOILET 304 804 1304 1804 2304 2804 3304 TOILET TOILET 07 7.14 2.15x1.23 2.15x1.23 2.15x1.23 2.15x1.23 04 08 228.08 2.95 W4-H:1.8W4-H:1.8 OP D D OP W4-H:1.8W4-H:1.8 2.45x0.80 2.45x0.80 L1 6.75 02 6.04 THIRTYEIGHTH FLOOR 3.V2 L2 6.75 W5-H:1.8 W5-H:1.8 1.45 KITCHEN KITCHEN 1.45 35 L3 6.75 2.95 BUILDING: 1 (TOWER - B) 3.35x1.35 3.35x1.35 V3 55 L4 6.75 11..55 5.76 THIRTYSEVENTH FLOOR L1 V10 L5 7.52 2. 70 2. 50 08 BALCONY CALCULATIONS: TOWER (B) 2.95 V1 1.07 A-B3 2.78 FLOOR SIZE AREA TOT. AREA W4-H:1.8 L5 2.11 V1 1.58 V9 2.82 V2 4.10 W2-H:1.8 TOILET 2. 5 2.95 THIRTYSIXTH FLOOR FORTIETH FLOOR 1.20 X 3.03 X 4 14.20 14.20 5 V3 0.39 1.38x2.41 A-Block L2 THIRTYNINTH FLOOR 1.20 X 3.03 X 4 14.20 14.20 0.82 1.26 BED ROOM V4 2.00 2.95 D3 7 2.78 2. 2. 4.28x3.60 3.05 0 50 2.07 A-B2 THIRTYEIGHTH FLOOR 1.20 X 3.03 X 3 10.65 10.65 69 V8 1.70 V5 5.66 THIRTYFIFTH FLOOR L3 1. THIRTYSEVENTH FLOOR 1.20 X 3.03 X 4 14.20 14.20 V11 V6 4.11 6.04 2. 7 2. 2 50 55 THIRTYSIXTH FLOOR 1.20 X 3.03 X 4 14.20 14.20 W4-H:1.8 ID .35 0 V7 1. 2.95 V7 0.39 W2-H:1.8 W3-H:1.8 VO x3 TOILET L4 THIRTYFIFTH FLOOR 1.20 X 3.03 X 4 14.20 14.20 23 W5-H:1.8 D2 70 50 V8 3.40 1. W3-H:1.8 1.38x2.28 2. 2. THIRTYFOURTH FLOOR THIRTYFOURTH FLOOR 1.20 X 3.03 X 4 14.20 14.20 35V6 D3 3. V9 2.01 W1-H:1.8 BED ROOM V4.82 35 9 6.04 THIRTYTHIRD FLOOR 1.20 X 3.03 X 3 10.65 10.65 5.76 E1 -3 1 1.82 3. 1.9 V10 0.06 2.95 BED ROOM FL 3.20x2.89 THIRTYSECOND FLOOR 1.20 X 3.03 X 4 14.20 14.20 .8 3 0 V5 BED ROOM 2.15x2.45 H:1 ID .55 CAS D2 1.95 V11 0.06 THIRTYTHIRD FLOOR THIRTYFIRST FLOOR 1.20 X 3.03 X 4 14.20 14.20 3- V x1 O KITCHEN 1.53x1.25 V12 0.06 5.76 25 W R 2. 1.69 2.75x3.60 TA 0. 50 1 0 2.95 THIRTIETH FLOOR 1.20 X 3.03 X 4 14.20 14.20 FT .7 I 2.29x3.65 VOID10 A-B1 3.55 1.59 R 4. L I x2 D2 LIV./DIN. ES 95 0.28x0.20 1.82 TWENTYNINTH FLOOR 1.20 X 3.03 X 4 14.20 14.20 D2 3.95 FI 305 805 1305 1805 2305 2805 3305 A-B2 3.55 THIRTYSECOND FLOOR 3.55x4.15 TWENTYEIGHTH FLOOR 1.20 X 3.03 X 3 10.65 10.65 1.20x3.03 OP FD-H:1.8 06 A-B3 3.55 Balcony D3 TWENTYSEVENTH FLOOR1.20 X 3.03 X 4 14.20 14.20 2.95 3.03 D3 LIV./DIN. Total 597.99 2. IRE 5.63x3.05 TWENTYSIXTH FLOOR 1.20 X 3.03 X 4 14.20 14.20 TOILET TOILET 302 802 1302 1802 2302 2802 3302 VOID1 55 L VOID9 0.98x1.58 x2 IFT THIRTYFIRST FLOOR 2.15x1.23 2.15x1.23 .9 1 1 2.87x0.78 5.93 TWENTYFIFTH FLOOR 1.20 X 3.03 X 4 14.20 14.20 F 5 1 R D 7.10 14.20 D O TWENTYFOURTH FLOOR 1.20 X 3.03 X 4 14.20 W4-H:1.8W4-H:1.8 OP ID E R ID 2.95 OR W LI TWENTYTHIRD FLOOR 1.20 X 3.03 X 3 10.65 10.65 C .53 2. FT THIRTIETH FLOOR W5-H:1.8W5-H:1.8 36.83 KITCHEN 50 2 TWENTYSECOND FLOOR 1.20 X 3.03 X 4 14.20 14.20 x2 D 306 806 1306 1806 2306 2806 3306 V12 3.35x2.15 A-B1 1.20x3.03 .7 FD-H:1.8 05 2.95 TWENTYFIRST FLOOR 1.20 X 3.03 X 4 14.20 14.20 Balcony 0 3.03 LIV./DIN. TWENTIETH FLOOR 1.20 X 3.03 X 4 14.20 14.20 3.05 5.00 2.55 6.04 2.78 1.53 4.46 1.59 6.74 5.63x3.05 TWENTYNINTH FLOOR 2. LI FT VOID8 OP NINETEENTH FLOOR 1.20 X 3.03 X 4 14.20 14.20 50 x2 3 2.52x1.70 TYPICAL - 2, 4- 7, 9- 12, 14- 17, 19- 22, 24- 27, 29- 32, 34- 37, 39, 40 FLOOR PLAN PLAN 2.95 EIGHTEENTH FLOOR 1.20 X 3.03 X 3 10.65 10.65 KITCHEN .7 VOID11 SCHEDULE OF OPENING: TOWER (B) 3.35x2.15 0 7 0.28x0.20 SEVENTEENTH FLOOR 1.20 X 3.03 X 4 14.20 14.20 ID .55 KITCHEN NAME LENGTH HEIGHT NOS. TWENTYEIGHTH FLOOR 5.00 2.55 5.00 5.25 5.00 1.61 1.59 6.74 VO5x1 .8 1.53x1.25 Polygon Area SIXTEENTH FLOOR 1.20 X 3.03 X 4 14.20 14.20 W4-H:1.8W4-H:1.8 H:1 2.29x3.65 D2 FD 0.46 2.10 02 01 OP 2 07 14.20 2. 4 70 0. 3- A-Block 1359.40 2.95 FIFTEENTH FLOOR 1.20 X 3.03 X 4 14.20 W3-H:1.8 50 10 W FD 0.48 2.10 01 FT . D FOURTEENTH FLOOR 1.20 X 3.03 X 4 14.20 14.20 LI x2 TOILET TOILET 5. BED ROOM 01 2.65 301 801 1301 1801 2301 2801 3301 3.95 FD 0.49 2.10 01 TWENTYSEVENTH FLOOR 2.15x1.23 2.15x1.23 D3 5.76 5.76 THIRTEENTH FLOOR 1.20 X 3.03 X 3 10.65 10.65 W4-H:1.8 D3 D3 3.20x2.89 FD 0.52 2.10 01 02 4.11 6 ID .35 W5-H:1.8 TOILET D2 03 172.17 2.95 TWELFTH FLOOR 1.20 X 3.03 X 4 14.20 14.20 4 O V x3 .8 FD 0.62 2.10 01 D2 LIV./DIN. ID .82 :1 14.20 23 H 1.38x2.28 04 161.01 ELEVENTH FLOOR 1.20 X 3.03 X 4 14.20 VO0x1 1. 6.04 TWENTYSIXTH FLOOR 3.55x4.15 W FD 0.74 2.10 01 1.45 1.45 1 3- TENTH FLOOR 1.20 X 3.03 X 4 14.20 14.20 5.76 D2 1. D3 0.76 2.10 85 05 6.28 03 2.95 14.20 BED ROOM 06 148.92 NINTH FLOOR 1.20 X 3.03 X 4 14.20 W2-H:1.8 5 D3 D3 0.77 2.10 160 ID .37 BED ROOM EIGHTH FLOOR 1.20 X 3.03 X 3 10.65 10.65 W4-H:1.8 2.75x3.60 BED ROOM 07 7.14 TWENTYFIFTH FLOOR V x3 O 4.28x3.60 D3 0.78 2.10 04 14.20 2.15x2.45 39 TOILET 04 08 145.60 SEVENTH FLOOR 1.20 X 3.03 X 4 14.20 W1-H:1.8 2. 1.38x2.41 OP 0.92 2.10 45 2.95 14.20 L1 6.75 SIXTH FLOOR 1.20 X 3.03 X 4 14.20 D2 0.92 2.10 80 FIFTH FLOOR 1.20 X 3.03 X 4 14.20 14.20 02 6.04 L2 6.75 TWENTYFOURTH FLOOR W2-H:1.8 W3-H:1.8 D2 0.93 2.10 300 V2 3.35 L3 6.75 FOURTH FLOOR 1.20 X 3.03 X 4 14.20 14.20 OP 0.93 2.10 81 W5-H:1.8 2.95 L4 6.75 THIRD FLOOR 1.20 X 3.03 X 3 10.65 10.65 FD 0.95 2.10 02 1.59 1.59 3.80 1.82 14.20 11..5 V3 SECOND FLOOR 1.20 X 3.03 X 4 14.20 0.95 555 L5 7.52 5.76 TWENTYTHIRD FLOOR KITCHEN D 1.05 2.10 170 L1 V10 FIRST - RESIDENTIAL 1.20 X 3.03 X 4 14.20 14.20 3.65x2.29 D 1.08 2.10 166 2. 7 50 08 V1 1.07 2.95 0 2. SIXTH PODIUM - RESI- 1.20 X 3.03 X 2 7.10 7.10 W4-H:1.8 W4-H:1.8 SCHEDULE OF OPENING: TOWER (B) 2.11 A-B4 2.78 V2 4.10 OP D V1 L5 V9 1.58 2. 2.82 V3 0.39 TWENTYSECOND FLOOR FIFTH PODIUM - RESI- 1.20 X 3.03 X 2 7.10 7.10 1.55 NAME LENGTH HEIGHT NOS. 55 2. 9 5 FOURTH PODIUM - RE- 1.20 X 3.03 X 2 7.10 7.10 36.83 TOILET TOILET 5.29 W4 0.65 2.10 170 A-Block L2 V4 2.00 1.25x1.53 2.95 7.10 2.41x1.38 2.28x1.38 2. 70 2. 0 A-B3 2.78 V5 5.66 THIRD PODIUM - RESI- 1.20 X 3.03 X 2 7.10 3.05 308 808 1308 1808 2308 2808 3308 5 2.07 W 0.70 1.20 02 7.75 D3 D3 V8 7.10 L3 1. 69 1.70 V6 4.11 TWENTYFIRST FLOOR SECOND PODIUM - RE- 1.20 X 3.03 X 2 7.10 D2 W4 0.70 2.10 332 V11 2. 70 50 55 V7 0.39 Total - - 574.69 Refuge Area 2. V7 1. 5.93 D2 LIV./DIN. W1 0.70 2.35 04 2.95 3.05x5.63 Area : 69.47 L4 V8 3.40 W4 0.75 2.10 162 2. 0 TWENTIETH FLOOR W3 1.20 2.10 156 70 2. 5 3. V6 35 V9 2.01 7.10 3. BED ROOM V4.82 1. 35 6.04 V10 0.06 W5 1.25 2.10 170 5.76 1 99 2.95 2 1. 3.60x4.28 BED ROOM 6.34 8 V5 V11 0.06 W1 1.26 2.35 02 NINETEENTH FLOOR 2.89x3.20 06 1.95 V12 0.06 W5 1.39 2.10 162 1.69 V13 0.06 W1 1.39 2.35 01 2.95 VOID12 1.75 0.20x0.28FD-H:1.8 Balcony W3 1.40 2.10 170 1.59 1.59 A-B1 3.55 1.20 1.20 3.32 EIGHTEENTH FLOOR W2-H:1.8 W3-H:1.8 3.03x1.20 W2 2.00 2.10 170 A-B2 3.55 W1 2.00 2.35 02 A-B3 3.55 2.95 W1 2.15 2.10 170 A-B4 3.55 5.99 A SEVENTEENTH FLOOR 5.00 2.55 6.04 3.02 TOWER-B 2.55 1.59 6.74 Total 667.83 W1 2.15 2.35 02 REFUGE FLOOR PLAN W3 2.49 2.10 162 7.10 7.10 2.95 36.91 FD 2.55 2.35 162 SIXTEENTH FLOOR TYPICAL - 3, 8, 13, 18, 23, 28, 33, 38 - RESIDENTIAL - REFUGE FLOOR PLAN W2 2.65 2.10 162 V13 A-B2 A-B1 V12 149.85 05 2.95 W1 2.65 2.35 01 A 5.00 2.55 6.04 2.78 2.78 6.04 1.59 6.74 LIFT 5.00 2.55 5.00 5.25 5.00 1.61 1.59 6.74 W1 5.99 2.35 01 FIFTEENTH FLOOR W2-H:1.8 W3-H:1.8 W3-H:1.8 W2-H:1.8 36.91 2.95 A W1-H:1.8 W1-H:1.8 FOURTEENTH FLOOR 5.00 2.55 5.00 5.25 5.00 1.61 1.59 6.74 BED ROOM BED ROOM 2.95 BED ROOM 2.15x2.45 2.15x2.45 BED ROOM 5.76 5.76 THIRTEENTH FLOOR 2.75x3.60 2.75x3.60 D2 LIV./DIN. LIV./DIN. D2 2.95 D2 D2 3.55x4.15 3.55x4.15 D3 D3 D3 5.76 2.39 5.76 TWELFTH FLOOR SOLAR WATER HEATING 2.39 D3 2.39 203 403 TO 703 903 TO 1203 1403 TO 1703 204 404 TO 704 904 TO 1204 1404 TO 1704 TOILET TOILET 1903 TO 2203 2403 TO 2703 2903 TO 3203 3403 TO 3703 3903 4003 1904 TO 2204 2404 TO 2704 2904 TO 3204 3404 TO 3704 3904 4004 TOILET TOILET SOLAR WATER HEATING SOLAR WATER HEATING 2.95 2.15x1.23 2.15x1.23 2.15x1.23 2.15x1.23 W4-H:1.8W4-H:1.8 OP D D OP W4-H:1.8W4-H:1.8 ELEVENTH FLOOR 2.45x0.80 2.45x0.80 2.57 2.45 2.95 2.57 W5-H:1.8 W5-H:1.8 2.57 1.45 KITCHEN KITCHEN 1.45 TENTH FLOOR 3.35x1.35 3.35x1.35 2.95 1.45 3.14 1.45 NINTH FLOOR 3.75 W4-H:1.8 W2-H:1.8 TOILET 2.95 1.38x2.41 0.82 1.26 BED ROOM D3 4.28x3.60 EIGHTH FLOOR 2.95 6.04 0.82 1.26 2 W4-H:1.8 ID .35 SEVENTH FLOOR O V x3 TOILET W2-H:1.8 W3-H:1.8 23 W5-H:1.8 D2 2.39 1. W3-H:1.8 1.38x2.28 SOLAR WATER HEATING 2.95 W1-H:1.8 D3 BED ROOM 2 6.04 L0 ID .35 VO3x3 3F 3.20x2.89 SIXTH FLOOR BED ROOM R 83 :1 3 2 1. C ID 55 .8 BED ROOM 2.15x2.45 3- AS . D2 8. 2.95 VO5x1 H E1 1.53x1.25 LI 2.57 - KITCHEN L0 5.76 2.75x3.60 W 2 2. FT ES TA 0. 50 x 1 2.29x3.65 VOID10 2) -3 .8 F 7 FIFTH FLOOR 3 E1 I 95 .8 K( 3. 2. 0.28x0.20 10 D2 LIV./DIN. IDAS.55 95 R 4. :1 )T 70 205 405 TO 705 905 TO 1205 1405 TO 1705 H AN D2 FI V R5Cx1 O 1905 TO 2205 2405 TO 2705 2905 TO 3205 2.39 2.95 3- 3.55x4.15 LI 1.20x3.03 3405 TO 3705 3905 4005 OP FD-H:1.8 /H 5.76 SOLAR WATER HEATING W I2 2. FT Balcony D3 T0A. (O 50 1 3.03 95 D3 LIV./DIN. S x2 FOURTH FLOOR 202 402 TO 702 902 TO 1202 1402 TO 1702 2. IRE 5.63x3.05 3. RE 4. 0 TOILET TOILET 1902 TO 2202 2402 TO 2702 2902 TO 3202 3402 TO 3702 3902 4002 VOID1 55 L VOID9 95FI .7 2.15x1.23 2.15x1.23 0.98x1.58 x2 IFT 2.87x0.78 2.95 F .9 1 1 D D 5 1 O R W4-H:1.8W4-H:1.8 OP ID E R ID 2.57 2. RE THIRD FLOOR 55 L 1.47 R W VOID1 VOID9 O C .53 2. 1.45 x2 IFT 2 70 0.98x1.58 2.87x0.78 2.39 36.83 W5-H:1.8W5-H:1.8 KITCHEN 5 FT . .9 1 206 406 TO 706 906 TO 1206 1406 TO 1706 Void D FI 2.95 LI 0x2 1906 TO 2206 2406 TO 2706 2906 TO 3206 5 M SOLAR WATER HEATING 3.35x2.15 3406 TO 3706 3906 4006 C FD-H:1.8 1.20x3.03 O O 6.25 Balcony M RO SECOND FLOOR 3.03 LIV./DIN. M 3.05 2. 2 70 3.14 5.63x3.05 O E 5 CANOPY FT . N IN 5 VOID8 OP M TE LI 0x2 2.95 2. 3 70 AC R 2.57 FT . 2.52x1.70 H R LI 0x2 KITCHEN FT AC FIRST - RESIDENTIAL FLOOR VOID11 3.35x2.15 7 0.28x0.20 3.05 2.39 4.45 SOLAR WATER HEATING LI E ID .55 .8 KITCHEN 2. VOID8 V x1 O 2.29x3.65 1.53x1.25 3 0 FT .7 W4-H:1.8W4-H:1.8 :1 5 OP .2 5 D2 2.52x1.70 4.50 LI 0x2 2. 3-H 4 70 0 10 W3-H:1.8 5 FT . D W 5. LI 0x2 7 TOILET TOILET 201 401 TO 701 901 TO 1201 1401 TO 1701 95 BED ROOM 2. ID .55 2.15x1.23 2.15x1.23 1901 TO 2201 2401 TO 2701 2901 TO 3201 3. D3 2.57 76 VO5x1 :1 .8 ECODECK-8TH PODIUM-RESI.COMM. FLOOR W4-H:1.8 D3 D3 3401 TO 3701 3901 4001 3.20x2.89 2 3- 6 .ID 35 W5-H:1.8 TOILET D2 2. 5 4 70 0. H FT . 10 W VO3x3 4 .8 D2 LIV./DIN. ID .82 H:1 1.38x2.28 1.16 LI 0x2 3. 5. 4.50 2 3.55x4.15 VO0x1 1. 3- 6.04 95 1 W 5.76 1. D2 6 ID .35 BED ROOM 4 VO3x3 .8 2.39 :1 W2-H:1.8 SEVENTH PODIUM-RESI-COMM-PARKING FLOOR 5 D3 ID .82 DESCRIPTION OF PROPOSAL ID .37 BED ROOM .2 -H W4-H:1.8 2.75x3.60 SOLAR WATER HEATING BED ROOM V x3 O 4.28x3.60 VO x1 0 1 W 3 6.04 PROPOSED DEVELOPMENT ON PLOT BEARING NEW S.NO. 19/1B, 19/2 1 2.15x2.45 2. 39 TOILET 5.76 1. to 19/5, 19/6(pt.), 19/7, 19/9 to 19/12, 19/13/A, 19/13/B, 19/14, 2.39 4.50 W1-H:1.8 1.38x2.41 SOLAR WATER HEATING 19/15, 19/16A, 19/16B, 19/17 to 19/19, 19/20/A, 19/20/B, 19/21, 5 ID .37 19/22, 19/24, 19/25/A, 19/25/B, 19/26, 19/27/A, 19/27/B, 19/28, W2-H:1.8 W3-H:1.8 2.57 VO9x3 SIXTH PODIUM - RESIDENTIAL - PARKING FLOOR 19/34/B, 19/34/C, 19/35, 19/36, 19/39/A, 19/39/B, 19/41/A, 19/41/B, 3 2. 19/44, 19/46, 20/1 to 20/3, 80/2/B, 80/2/C, 82, 83/2/B/2, 83/4/1/B, W5-H:1.8 W5-H:1.8 83/4/2/A, 83/4/2B, 83/6/B, 83/7/A, 83/7/B, 83/7/C, 83/11/B, 83/12, 2.95 1.59 1.59 2.57 85/3, 85/4, 86/1/B, 86/2/B, 86/3/B, 87/1/C & 81 OF VILLAGE BALKUM, KITCHEN KITCHEN FIFTH PODIUM - RESIDENTIAL - PARKING FLOOR THANE (W). 3.65x2.29 3.65x2.29 OWNERS NAME & SIGN : Digitally signed by YOGESH VITTHAL BANDEKAR Date: 01 Mar 2024 18:59:39 Yogesh Vitthal Bandekar 1.59 1.59 2.95 Organization :Thane Municipal W4-H:1.8 W4-H:1.8 OP D D OP W4-H:1.8 W4-H:1.8 Corporation Designation :Developer AGILE REAL ESTATE PRIVATE LIMITED FOURTH PODIUM - RESIDENTIAL - PARKING FLOOR TOILET TOILET 208 408 TO 708 908 TO 1208 207 407 TO 707 907 TO 1207 TOILET TOILET OWNER_SIGN 1.25x1.53 1408 TO 1708 1908 TO 2208 1407 TO 1707 1907 TO 2207 1.25x1.53 2.41x1.38 2.28x1.38 2408 TO 2708 2908 TO 3208 3408 TO 3708 3908 4008 2407 TO 2707 2907 TO 3207 3407 TO 3707 3907 4007 2.28x1.38 2.41x1.38 2.95 ARCH.NAME,SIGN & ADD Digitally signed by Atul Madanlal Gulati D3 D3 D3 D3 Atul Madanlal Gulati Date: 04 Mar 2024 09:59:32 D2 Organization :Thane Municipal D2 THIRD PODIUM - RESIDENTIAL - PARKING FLOOR Corporation Designation :Architect D2 LIV./DIN. LIV./DIN. D2 3.05x5.63 3.05x5.63 2.95 ARCH_ADD ARCH_SIGN PROJECT INFORMATION 7.10 7.10 SECOND PODIUM - RESIDENTIAL - PARKING FLOOR BED ROOM BED ROOM 2.39 SOLAR WATER HEATING PLOT NO :0 2.39 USE : Mix Use 2.39 3.60x4.28 BED ROOM BED ROOM 3.60x4.28 SOLAR WATER HEATING 2.95 SOLAR WATER HEATING SUBUSE : Residential cum Commercial Building 2.89x3.20 2.89x3.20 7.10 7.10 FIRST PODIUM - PARKING FLOOR NODE/SURVEY : VOID13 VOID12 2.57 SECTOR NO : 0.20x0.28FD-H:1.8 Balcony FD-H:1.80.20x0.28 Balcony 2.57 3.20 PLOT ADDRESS : 0,Balkum,30Mt. DP Road W2-H:1.8 W3-H:1.8 3.03x1.20 3.03x1.20 W3-H:1.8 W2-H:1.8 2.57 GROUND - SHOP - PARKING FLOOR 2.80 PERMIT NO PERMIT_NO 5.00 2.55 6.04 3.02 3.03 A 6.04 1.59 6.74 FIRST BASEMENT - PARKING FLOOR N INWARD NO S05/0207/21 36.91 5.00 2.55 6.04 6.25 6.04 1.59 6.74 KEY NO 124 SCALE 1:100 3.00 A RESIDENTIAL - TYPICAL - 2, 4- 7, 9- 12, 14- 17, 19- 22, 24- 27, 29- 32, 34- 37, 39, 40 FLOOR PLAN TERRACE FLOOR PLAN SECOND BASEMENT - PARKING FLOOR DATE 16-02-2024 SHEET NO 14 / 16 TOWER-B TOWER-B SECTION (Scale - 1:200) ISO_A0_(841.00_x_1189.00_MM)