Ref no. __________ Date : 30.09.2025 FORM -2 (See Regulation 3) ENGINEER’S CERTIFICATE Date: 30/09/2025 To, SEAGREEN LIFESPACES LLP (Through its Designated Partner Balram Harisinghani) Project Name : SEA GREEN PALACIA MahaRERA Registration Number : P51700055526 Flat no 101, Moti Mahal Apt., Bk no C-37/74, Kurla Camp Road, Ulhasnagar 421004. Subject: Certificate of cost Incurred for Development of SEA GREEN PALACIA (MahaRERA Registration Number P51700055526) being developed by SEAGREEN LIFESPACES LLP (Through its Designated Partner Balram Harisinghani) Sir, 1. I/We Bhushan G. Rupani (Prime consultants) have undertaken assignment of certifying Estimated Cost for SEA GREEN PALACIA having MahaRERA Registration Number P51700055526 being developed by SEAGREEN LIFESPACES LLP (Through its Designated Partner Balram Harisinghani) 2. We have estimated the cost of the Civil, MEP and Allied works required for completion of the Apartments and proportionate completion of internal & external works of the project as per specifications mentioned in agreement of sale. Our estimated cost calculations are based on the Drawings/plans made available to us for the project under reference by the Developer/Consultants. The schedule of items and quantity for the entire work as calculated by Shri Bhushan G. Rupani Quantity Surveyor* appointed by Developer/Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us to ascertain/confirm the above analysis given to us. 3. We estimate Total Estimated Cost of completion of the aforesaid project under reference as Rs. 28,84,00,000/- (Total of Table A and B) at the time of registration. The estimated Total Cost of project is with reference to the Civil, MEP and allied works required for completion of the apartments and Ref no. __________ Date : 30.09.2025 proportionate completion of internal & external works, as per specifications mentioned in agreement of sale and for the purpose of obtaining occupation certificate / completion certificate for the building(s)/wing(s), layout, plotted development from the Ulhasnagar Muncipal Corporation being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated Cost incurred till date is calculated at Rs. 16,83,50,000/- (Total of Table A and B). The amount of Estimated Cost Incurred is calculated on the base of amount of input materials/services used and unit cost of these items. 5. The Balance Cost of Completion of the Civil, MEP and Allied works of the apartments and proportionate completion of internal & external works, as per specifications mentioned in agreement of sale of the Project is estimated at Rs. 12,00,50,000/- (Total of Table A and B). 6. I certify that the Cost of the Civil, MEP and allied work for of the apartments and proportionate completion of internal & external works, as per specifications mentioned in agreement of sale of the aforesaid project as completed on the date of this certificate is as given in Table A and B below: Table A (to be prepared separately for each Building/Wing/Layout/Plotted Amount (in Sr. No. Particulars Rs.) Total Estimated cost of the building/wing/layout/ploted 1 26,00,00,000 Development as on 30/09/2025 (date of Registration is 02/04/2024) Cost incurred as on date of certificate 2 16,83,50,000 30/09/2025 Work done in percentage (as 3 64.75% Percentage of the estimated cost) Balance cost to be Incurred** (Based on 4 9,16,50,000 Estimated Cost) Cost Incurred on Additional/Extra 5 Items as on 30/09/2025 not included in - the Estimated cost (Table C) Ref no. __________ Date : 30.09.2025 Table B Internal & External Development works in Respect of Registered Phase Sr. No. Particulars Amount in Rs. Total Estimated Cost of the Internal and External Development works including 1 amenities and facilities in the layout as 2,84,00,000 on 30/09/2025 (Date of Registration is 02/04/2024) Cost incurred as on 30/09/2025 (based 2 - on the Estimated Cost) Work done in Percentage (as Percentage 3 0% of the estimated cost) Balance Cost to be Incurred (Based on 4 2,84,00,000 Estimated Cost) Cost Incurred on Additional/Extra Items 5 as on 30/09/2025 not included in the - Estimated cost (Table C) Agreed and Accepted by For SEA GREEN LIFESPACES LLP Balram G. Harisinghani Place : Ulhasnagar Designated Partner Date : 30.09.2025 (Not less than Bachelor’s Degree Holder or equivalent as per Section 2(u) of the Act) *Note 1. The scope of work is to complete entire Real Estate Project as per drawings approved from time to time and as per specifications mentioned in agreement of sale. 2. (*) Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor, whose certificate of quantity calculated can be Ref no. __________ Date : 30.09.2025 relied upon by the Engineer. In case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked(*) and in case quantity are being calculated by office of Engineer, the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked(*). 3. (**) Balance cost to be incurred (4) may vary from the difference between Total estimated cost (1) and actual cost incurred (2) due to deviation in quality required/escalation of cost, etc. As this is an estimated cost, any deviation in quantity required for development of the Real estate Project will result in amendment of the cost incurred/ to be incurred. 4. All components of work with specifications are indicative and not exhaustive. 5. Please specify if there is any deviations/qualifications Example: Any deviations in input materials used from specifications in agreement of sale. Table C List of Extra/Additional items executed with Cost (Whichwere not parts of the original Estimate of Total Cost) Sr. no. List of Extra/Additional/Deleted Items Amount Rs. 1 2