. MARATHE RM.67.'SUSHILA' BLNGLOW, NEAR SANTOSH PALACE HOTEL. SUDAMA NAGAR, M.I.D.C.. DOMBIVLI (E). PHONE NO.;- 02.51-243 8l8l ---MOBILE NO:- 9619e -i9315 MCGM LICENCE NO. STR M/I49 KDMC LICENCE NO 495 FORM-2 [see Regulation 3] EN GINEER'S CERIIFI CATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account- Project wise) Date: 15.O7.2026 To M/s. Radhika Construction Company RP26, Near GanpatiVisarjan Talao, MIDC, M.ilapoagar, Dornbivli East. Pin- 42L2O3. Subject: Certificate of Cost lncurred for Development of TRINITY (shashank Saptshrung.) By "Radhika Construction Company-" for Construction of building, situated on the on plot bearing C.T.S. nos.3084, Surve no.65, Hissa No 5. Situated at Mouje Dombivli, Dombivli West, Taluka Kalyan, Dist - Thane, Sir, We have undertaken assignment of certifying Estimated Cost for the Subject Real Estate Project Maha RERA, Registration No -P51700055300, ln the Name 'TRINITY (Shashank Saptshrung.) situated on the on plot bearing C.T.S. nos.3084, Surve no.65, Hissa No 5. Situated at Mouje Dombivli, Dombivli West, Taluka Kalyan, Dist -Thane, being developed by M/s. Radhika Construction Company. t. Following technical professionals are appointed by Owner / Promoter: - (i) M/s/Shri Ankur Shetye as L.S. / Architecg (ii) M/s /Shri Girish.S. Marathe as Structural Consultant; (iiu Mls lShrf MandarPadhye as MEP Consuftant (iv) M/s /Shri I as Quantity Surveyor * 2. We have estimated the cost of the completion to obtain Occupation Ceitificate/ Completion Certificate, of the Civil, MEP and Allied works, of the buildings of the project. Our estimated cost calculations are based on the Drawings/plans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by Shri Girish.S. Marathe as Stmchrral Consultant Quantity Surveyor*appointed by Developer / Engineer. The assumption of the cost of rnaterial. labour and other inputs made hy developer. and the site inspection carried out by us to ascertain / confirm the above analysis given to us. We estimate Total Estimated Cost of completion of the building(s) of the aforesaid project under reference as Rs 10,24,92,937.OO (Totalof Table A and B). The estimated Total Cost of project is with reference to the Civil, MEP and allied works required to be completed for the purpose of obtaining occupation On certificate / completion certificate for the buildings from the Kalyan Dombivli Municipal Corporation being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. The Estimated Cost lncurred tifl 30/06/2U26 is calculated at Rs.5,28,ll0,694.0llTotal of Table A and B). The amount of Estimated Cost lncurred is calculated on the base of amount of Total Estimated Cost. The Balance cost of Completion of the Gvil, MEP and Allied works of the building{s) of the subject project to obtain Occupation Certificate / Completion Certificate from Kalyan Dombivli Municipal Corporation (planning Authority) is estimated Rs.4,96,92,243.0O (Total of Table A and B). 6. I certify that the Cost of the Civil, MEP and allied work for the aforesaid Project as completed on the date of this certificate is as given in Table A and B below: TABLE A Building /Wing bearing Number_ or called 'TRlNlW (shashank Saptshrung.) Cost For Saleable Area available to Radhika Construction Company (To be prepared separately for each Building /Wing of the Real Estate Project) Sr. No Particulars Amounts Total Estimated cost of the building Rs 10,2d92,937.00 as on date of Registration is 2 Cost incurred as on 3010612026. Rs. Rs.5,28,00,594.00 (Based on the Estimated cost) 5L.52% Work done in Percentage (As Percentage of the estimated cost) 4 Balance Cost to be lncurred Rs 4,96,92,243.00 (Based on Estimated Cost) 5 Cost lncurred on Additional /Extra ltems Rs. - Nil as on not included in the Estimated Cost (Annexure A) TABLE B (To be prepared for the entire registered phase of the Real Estate Project) Sr. No Particulars Amounts Total Estimated cost of the lnternal and External Rs NIL Development Works including amenities and Facilities in the layout as on date of Registration is 2 Cost incurred as on 3OlOGl2O26 Rs. NIL (Based on the Estimated cost) Work done in Percentage (As Percentage of the estimated cost) 4 Balance Cost to be lncurred Rs NIL (Based on Estimated Cost) 5 Cost lncurred on Additional/Extra ltems Rs. Nil ason- not included in the Estimated Cost (Annexure A) Yours Faithfully f+g'o< Acc.'P:-+'.L GIRISH S. MARATHE For RADHIKA CONSTRUCTION CO. SIRUCTURAL CONSI'ITANT K.D.M.C. Liccncc llo. 495 I neer (Structural Engineer- 495) + Note 1. The scope of work is to complete entire Real tstate Project as per drawings approvcd from time to time so as to obtain Occupation Certificate /Completion Certificate. 2. (+) Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor, whose certificate of quantity calculated can be relied upon bythe Engineer. ln case of independent guantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (*) and in case quant-i{ are bcing calculated by office of Enginecr, the name of the person in the ffice of tngineer, who is responsible for the quantity calculated should be mentioned at the place marked (*). The estimated cost includes all labour, material, equipment and machinery required to carry out entire work. fu this is an cstimated cost, any tleviation in quantfty requireil for development of the Real estate Project will result in amendment of the cost incurred/to be incurred. All components of work with specifications are indicative and not exhaustive. Annexure A List of Extra /Additional ttems executed with Cost (Which were not part of the origina! Estimate of Total Cost)