GInIsn S. MARATHE RM-67,'SUSHTLA' BUNGLOW, NEAR SANTOSH PALACE HOTEL. SUDAMA NAGAR, M.I.D.C,. DOMBIVLI (E). PHONE NO :- 0251-243 ElEl ---MOBILE NO:- e6199 5e3ls MCGM LICENCE NO STR M/I49 KDMC LICENCE NO. 495 FORM-2 [see Regulation 3] ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account- Project wise) Date:15.04.2026 To M/s. Radhika Construction Company RP25, Near Ganpati Visarjan Talao, M.IDC, Milapnagar, Dornbivli East. Pin- 4212O3. Subject: Certificate of Cost lncurred for Development of TRINITY (Shashank Saptshrung.) By "Radhika Corstruction Conpany-" for Construction of building situated on the on plot bearing C.T.S. nos.3084, Surve no.65, Hissa No 5. Situated at Mouje Dombivli, Dombivli West, Taluka Kalyan, Dist - Thane, Sir, We have undertaken assignment of certifying Estimated Cost for the Subject Real Estate Project Maha RERA, Registration No -P51700055300, ln the Name'TRlNlW (Shashank Saptshrung.) situated on the on plot bearing C.T.S. nos.3084, Surve no.65, Hissa No 5. Situated at Mouje Dombivli, Dombivli West, Taluka Kalyan, Dist -Thane, being developed by M/s. Radhika Construction Company. 1. Following technical professionals are appointed by Owner f Promoter: - (i) M/s/Shri Ankur Shetye as L.S. / Architect; (ii) M/s /Shri Girish.S. Marathe as Structural Consultant; (iii) Mls Ahri Mandar Padhye as MEP Consultant (iv) Mls lshri I .as Quantity Surveyor * 2. We have estimated the cost of the completion to obtain Occupation Certificate/ Completion Certificate, of the Civil, MEP and Allied works, of the buildings of the project. Our estimated cost calculations are based on the Drawings/plans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by Shri Girish.S. Marathe as Structural Consultant Quantity Surveyor*appointed by D€vdopes / Engfureer. The assurnFtion of ttre cost of snet€rial. bbo$r arld other iflputs {Eade by developer. and the site inspection carried out by us to ascertain / confirm the above analysis given to us. We estimate Total Estimated Cost of completion of the building(s) of the aforesaid project under reference as Rs 10,2492,937.00 (Total of Table A and B). The estimated Total Cost of project is with reference to the Civil, MEP and allied works required to be completed for the purpose of / obtaining occupation On certificate completion certificate for the buildings from the Kalyan Dombivli Municipa! Corporation being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. TheEstimated Costlncurred till3l/U312U26 is calculated atRs.f,98,93,96ll.00Total of Table A and B). The amount of Estimated Cost lncurred is calculated on the base of amount of Total Estimated Cost. 5. The Balance cost of Completion of the Gvit, MEP and Allied works of the building(s) of the subject project to obtain Occupation Certificate / Completion Certificate from Kalyan Dombivli Municipal Corporation (planning Authority) is estimated Rs.5,25,98,975.00 (Total of Table A and B). I certifo that the Cost of the Civil, MEP and allied work for the aforesaid Project as completed on the ilate oI this ceftificate is as given in Table A and B below: TABLE A Building /Wing bearing Number_ or called 'TRINIW (Shashank Saptshrung.) Cost For Saleable Area available to Radhika Construction Company (To be prepared separately for each Building /Wing of the Real Estate Project) Sr. No Particulars Amounts Total Estimated cost of the building Rs 10,24,92,937.00 as on date of Registration is Cost incurred as on 3UO312O26. Rs. Rs.4,98,93,962.00 (Based on the Estimated cost) 48.68% Work done in Percentage (As Percentage of the estimated cost) 4 Balance Cost to be lncurred Rs 5,25,98,975.00 (Based on Estimated Cost) Cost lncurred on Additional /Extra ltems Rs. - Nil as on not included in the Estimated Cost (Annexure A) TABLE B (To be prepared for the entire registered phase of the Real Estate Project) Sr. No Particulars Amounts Total Estimated cost of the lnternal and External Rs NIL Development Works including amenities and Facilities in the Iayout as on date of Registration is 2 Cost incurred as on 3tl03l2026. Rs. NIL (Based on the Estimated cost) 3 Work done in Percentage (As Percentage of the estimated cost) 4 Balance Cost to be lncurred Rs NIL (Based on Estimated Cost) Cost lncurred on Additional/Extra ltems Rs. - Nil ason- not included in the Estimated Cost (Annexure A) Aq{.r& La f,c ccq\