TPRCE ARCHITECTS ARCIIITE CT'S CERTIFICATE Date:l51O412026 To, M/s Radhika Construction Company, RP25, Near Ganpati Visarjan Talao, MIDC, Milapnagar, Dombivli East. Subject: Certificate of Percentage of Complefion of Construction Work of TRINITY (Shashank Saptshrung) Building of the Project lMahaRERA Registration Number- P517OOO553fitl Situated on the Plot bearing C.T.S. nos.3084, Surve no.55, Hissa No 5. Situated at Mouie Dombivli, Dombivli West, Taluka Kalyan, Dist - Thane,demarcated by it boundaries (latitude and longitude of the end points) 19219701,73.0E3:ZL1to the North,19.219301, ?408342f to the Sout\ f92f9544 73.0834E5 to the Eas( 19.219453, 73.083174 to lYest of DMsion Konkan at Dombivli ( West ) taluka Kalyan District Thane PIN 421202 admeasuring 1999.60 sq. mts. Area being developed by IWs. Radhika Construction Company. Sir, I Mr. Ankur A. Shetye have undertaken assignment as Architect/Licensed Surveyor of certifying Percentage of Completion of Construction Work of the TRINITY (Shashank Saptshrung) building Situated on the plot bearing C.T.S. nos.3084, Surve no.65, Hissa No 5. of Division Konkan at Dombivli ( West ) at taluka Kalyan District Thane PIN 421202 admeasuring 1999.60 sq. mts. Area being developed by M/s. Raftrik'a Constroction Company Based on Site Inspection, with respect to each of the BuildingAiling of the aforesaid Real Estate hoject, I certiff that as on the date of this certificate, the Percentage of Work donefor each of the building/Wing of the Real Estate Project as registered vide numberP517Hl055300 under MahaRERA is as pertable Aherein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. 0O2, Om Krishna Krupa CHS, Opp Shastri Hall, Dattanagar, Dombivli (E ) 42f ml Mob.8691018884 Table A Sr. No Tasks/Activity Percentage Of work done I Excavation r00% 2 ONE number of Basementfu) and Plinth l00o/o 3 -number of Podiums NTL 4 ONE Stilt Floor 100% 5 lz[_number of Slabs of Super Structure 7t% 6 Intemal walls, Intemal Plaster, Floorings within F1ats/ Premises, Doors and windows to each of the 40% flaV Premises 7 Sanitary Fittings within the Flat/Premises, Electrical Fittinss within the Flat/Premrses 0% 8 Staircases, Lifts Wells and Lobbies at each Floor levrl connecting Staircases and Lifts, Over.head and 7t% Undersround Water Tanks 9 The external plumbing and external plaster, elevation completion of terraces with waterproofing 0% of the Buildine/Wine, l0 Installation of lifts, water pumps, Fire Fighting Fittings antl Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment/CRz NOC, Finishing to entrance o% lobby/s, plinth protection, paving of areas aparfinent to building/wing, Compound wall and all other requirements as may be required to obtain occupation/c ompletion certifi cate 002, Om Krishna Krupa CHS, Opp Shastrl Hall, Dattanagar, Domblrill ( E ) il2l201 Mob.86910188M Table B Sr. Common areas and Facilities Proposed Percentage Details No Amenities (Yes/llo) of Work I)sne 1 Internal Roads & Footpaths NO 0% 2 Water Supply YES lYo 3 Sewerages (chamber, lines; YES Septic Tank. STP) 0Y" 4 Storm Water Drains YES 0v, 5 Landscapins & Tree Plantins NO 0% 6 Sheet Liehtine NO OY" 7 Communitv Buildinss NO 0% 8 Treatment and disposal of NO 0y; sewage and sullase water 9 So.lid Waste nranage.nreat & NO AY" Disposal l0 Water Conseruation, Rain water YES 0Y" harvestins ll Energy Management NO 0% t2 Fire protection and fire safety YES 0% requirements l3 Others (Option to add more) Yours Faithfully FOR SPACE EI\IWRO ARCIilTECTS, \. . t' ' tr.l AR. ANI(UR A. SIIETYE (cAt2oo0l267w) Agreed And Accepted By: Name : M/S Radhika Construction Co Date: l5lWl2l26 002, Om Krishna Krupa CHS, Opp Shastri Hall, Dattanagar, Dombivli ( E ) 421201 ilob.86910188&l