,'Hlrr E11E=ET-I ENTECH ENGINEERS .lr. I Regd. Otfice: Ground Floor, RP-26, Near Ganesh Visarjan Talao.Milap Nagar. M.l.D.C Dornbivli {E} - 441'?OSContact No: OA5't-A43t}Ig1 FORM-2 [see Regulation 3] ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account- Project wise) Date:1V$/2024. To M/s. Radhika Construction Company RP26, Near Ganpati Visarjan Talao, MDe, Milapnagar, Dombivli East. Pin- 421203. .ii:.:, Subject: Certificate of Cost lncurred for Development of TRIN|TY (Shashank Saptshrung.) By "Radhika Construction Company." for Construction of building, situated on the on plot bearing C.T.S. nos.3o84, Surve no.65, Hlssa No 5. Sltuated at MouJe Dombivli, Dombfull West, Taluka Kalyan, Dist - Thane, Sir, We have undertaken asslgnment of certifoing Estlmated Cost for the Sublect Reat Estate proJect Maha RERA, Registration No -P517fiD55300, ln the Name "TR|N|TY (Shashank Saptshrung.) situated on the on plot bearing C.T.S. nos.3084, Surve no.55, Hissa No 5. Situated at Mouje Dombivli, Dombivli West, Taluka Kalyan, Dist -Thane, being developed by M/s. Radhika Construction Company. 1' Following technical professionals are appointed by owner / promoter: - (i) M/sAhri Ankur Shetye as L.S. / Architect; (ii) Mls lstrrl G[rtsh.S. Marathe as Structural Consuhant; (iii) M/s /Shri Mandar Padhye as MEp Consultant (iv) Mls lshri I ,as Quantity Surveyor * We have estimated the cost of the completion to obtain Occupation Certificate/ Completion Certificate, of the Civil, MEP and Allied work, of the buildings of the project. Our estimated cost calcuJations are based on the Drawingslplans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by Shri Girish.S. Marathe as Structural Consultant euantity Surveyor*appointed by Developer / Engineer. The assumption of the cost of material. labour and other inputs made by developer. and the site inspection carried out by us to ascertain / confirm the above analysis given to us. We estimate Total Estimated Cost of completion of the building(s) of the aforesaid project under reference as Rs 1Q24,92,9t7.W (Total of Table A and B). The estimated Totat Cost of project is with reference to the Civil, MEP and allied works required to be completed for the purpose of obtaining occupation. 4. on certificate / completion certificate for the buildings from the Katyan Dombivli Municipal Corporation being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 5. The Estimated Cost lncurred ttll tLlAU2024 is calculated at Rs.59,2G,561.00 Total of Table A and B)- The amount of Estimated Cost lncurred is calculated on the base of amount of Total Estimated Cost. TheBalancecostof Completionof theCivil, MEPandAlliedworksof thebuilding(s)of thesubject project to obtain Occupation Certificate / Completion Certificate from Kalyan Dombivli Municipal Corporation (planning Authority) is estimated Rs.9,55,39,814.fi) (Total of Table A and B). 7. ! certify that the Cost of the Civil, MEP and allied work for the aforesaid project as completed on the date of this certificate is as given in Table A and B below: TABLE A Building lWing bearing Number or called "TRlNffY (shashank Saptshrung.l cost For saleable Area available to Radhika construction company (To be prepared separately for each Building /wing of the Real Estate project) Sr. No Particulars Amounts Total Estimated cost of the building Rs 1O2492,937.00 as on_ date of Registration is Cost incurred as on 3.tlOglzOZ . Rs.59,25,561.00 (Based on the Estimated cost) Work done in Percentage 5.78% (As Percentage of the estimated cost) 4 Balance Cost to be lncurred Rs 9,55,39,814.00 (Based on Estimated Cost) 5 Cost lncurred on Additional/Extra ltems Rs. - Nil as on not included in the Estimated Cost (Annexure A) TABLE B (lnternal & External Development Works in respect of Registered phase) Sr. No Particulars Amounts Total Estimated cost of the lnternal and External Rs Nil Development Works including amenities and Facilities in the layout as on date of Registration is_. Cost incurred as on gLl0glZOZ4. Rs. Nil (Based on the Estimated cost) 3 Work done in Percentage (As Percentage of the estimated cost) 4 Balance Cost to be lncurred Rs Nil (Based on Estimated Cost) Cost lncurred on Additional /Extra ltems Rs. - Nil ason- not included in the Estimated Cost (Annexure A) vours ffiY G|RISH S. MARATHE Agf, eLL t Acc r-Pl eJ signatuYe wLf EngineerK'D.M.C. STRUCTURAL COr{SurTAr{T Licenco No. 495 For RADHIH COI{STRUT IKDMC [icense No.495) * Note PARTIIER .!+- The scope of work is to complete entire Real Estate Project as per drawings approved from time to time so as to obtain Occupation Certificate /Completion Certificate. (*) Quantity survey can be done by office of Engineer or can be done by an independent euantity surveyor, whose certificate of quantity calculated can be relied upon by the Engineer. ln case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (*) and in case quantity are being calculated by office of Engineer, the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (*). The estimated cost includes all labour, material, equipment and machinery required to carry out entire work. As this is an estimated cost, any deviation in quantity required for development of the Real estate project wil! result in amendment of the cost incurred/to be incurred. 5. A[ eomponents of lrcrk with speeifieetisns are ]ndicative and not exhaustive. Annexure A List of Extra / Additional ttems executed with Cost (Which were not part of the original Estimate of Total Cost)