ENTECH ENGINEERS FORM-2 [see Regulation 3] ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account- Project wise) Date:15.01.2025 To M/s. Radhika Construction Company RP26, Near GanPati Visarjan Talao, MIDC, Milapnagar, Dombivli East. Pin- 4212O3. By Subject: Certificate of Cost lncurred for Development of TRINIW (shashank Saptshrung') ,,Radhika C.onstruction Company." for Construction of building, situated on the on plot bearing c.T.s. nos.3084, Surve no.65, Hissa No 5. Situated at Mouie Dombivli, Dombivli west, Taluka Kalyan, Dist - Thane, 5ir, Estate Project We have undertaken assignment of certifying Estimated Cost for the Subject Real Maha RERA, Registration No -P517fi)055300, ln the Name 'TRINITY (Shashank Saptshrung.| MOuie situated on the on plot bearing C.T.S. nos.3084, Surve no.55, Hissa No 5' Situated at Dombivli, Dombivli West, Taluka Kalyan, Dist -Thane, being developed by M/s' Radhika Construction ComPanY. 1. Following technical professionals are appointed by Owner / Promoter: (i) M/s/Shri Ankur Shetye as L.S' / Architect; tii) M/s /Shri Girish.S. Marathe as Structural Consultant; (iii) M/s /Shri Mandar Padhye as MEP Consultant * (iv) M/s /Shri I as QuantitY Surveyor 2. We have estimated the cost of the completion to obtain Occupation Certificate/ Completion Certificate, of the Civil, MEP and Allied works, of the buildings of the project. Our estimated cost calculations are based on the Drawings/plans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by Shri Girish.S. Marathe as Structural Consultant euantity Surveyor*appointed by Developer / Engineer. The assumption of the cost of material. labour and other inputs made by developer. and the site inspection carried out by us to ascertain / confirm the above analysis given to us. 3. We estimate Total Estimated Cost of completion of the building(s) of the aforesaid project under reference as Rs.16,19,61,143.00 (Total of Table A and B). The estimated Total Cost of project is with reference to the Civil, MEP and allied works required to be completed for the purpose of obtaining occupation. 4. On certificate / completion certificate for the buildings from the Kalyan Dombivli Municipat Corporation being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. The Estimated Cost lncurred lill3L|L2/2O24 is calculated at Rs. 3,47,45,166.00Total of Table A and B)' The amount of Estimated Cost lncurred is calculated sn the base of amount of Total Estimated Cost. 6. The Balance cost of Completion of the Civil, MEP and Allied works of the building(s) of the subject project to obtain Occupation Certificate / Completion Certificate from Kalyan Dombivli Municipal Corporation (planning Authority) is estimated Rs.!2,72,15,977,N (Total of Table A and B). 7. I certify that the Cost of the Civil, MEP and allied work for the aforesaid project as completed on the date of this certificate is as given in Table A and B below: TABLE A Building /wing bearing Number_ or called 'TRtNtw (shashank saptshrung.). Cost for allotted flats to society members by Radhika Construction Company Promoter (To be prepared separately for each Building /wing of the Real Estate project) Sr. No Particulars Amounts Total Estimated cost of the building Rs 15,19,61,143.0O as on_ date of Registration is Cost incurred as on 3UL2/2024. Rs. 3,47,45,156.00 (Based on the Estimated cost) Work done in Percentage 21.4s% (As Percentage of the estimated cost) 4 Balance Cost to be lncurred Rs 12,72,15,977.O0 (Based on Estimated Cost) Cost lncurred on Additional/Extra ltems Rs. Nil as on not included in the Estimated Cost (Annexure A) TABLE B (To be prepared for the entire registered phase of the Real Estate Project) Sr. No Particulars Amounts Total Estimated cost of the lnternal and External Rs NIL I Development Works including amenities and Facilities in the layout as on date of Registration is_. 2 Cost incurred as on 3L/LZ{2O24. Rs. NIL (Based on the Estimated cost) 3 Work done in Percentage (As Percentage of the estimated cost) 4 Balance Cost to be lncurred Rs Nl[ (Based on Estimated Cost) 5 Cost lncurred on Additional/Extra ltems Rs. Nil ason- not included in the Estimated Cost (Annexure A) s.lRlsH s. MARATHE STRUCTURAL CONSULIANT ftgr* ) Y hccQ,p l" J I(.D.M.C. Licence No. 495 For IIADHIKA coI{sTRUcTIo[ Signature of Engineer cb. (struff ural Englneer- 495) * Note @ *pARrr{ER I L. The scope of work is to complete entire Real Estate Project as per drawings approved from time to time so as to obtain Occupation Certificate /Completion Certificate. 2. (*) Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor, whose certificate of quantity calculated can be relied upon by the Engineer. ln case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place mark6d (*) and in case quantity are being calculated by office of Engineer, the name of the person in the office of Engineer, who is responsible for the guantity calculated should be mentioned at the place marked (*). 3. The estimated cost includes all labour, material, equipment and machinery required to carry out entire work. 4. As this is an estimated cost, any deviation in quantity required for development of the Real estate Project will result in amendment of the cost incurred/to be incurred. 5. All components of work with specifications are indicative and not exhaustive. Annexure A List of Extra / Additional ltems executed with Cost (Which were not part of the original Estimate of Total Cost)