Annexure A FORM 1 [See Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) To, Blissful Buildcon LLP Darul Falah Masjid, Grd Flr, House no. 137/0, Millar Nagar, Avachit Pada road, Gulzar Nagar Bhiwandi, Thane-421302 Subject: Certificate of Percentage of Completion of Construction Work of “JOGANI PRIDE” having MahaRERA Registration Number P51700055327 being developed by M/S. BLISSFUL BUILDCON LLP. (For 01/10/2024 to 31/12/2024 i.e Quarter 3 of F.Y. 2024-2025) Sir, I, Mr. Waheed Ahmad Hameed Ahmad Ansari of M/s. H.K. Design & Consultant, have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of “JOGANI PRIDE” having MahaRERA Registration Number P51700055327 being developed by BLISSFUL BUILDCON LLP. Based on Site inspection. With respect to Layout / each of the Building/Wing of the aforesaid Real Estate Project. I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activities of the entire phase is detailed in Table B. TABLE A Sr. No Tasks / Activity Percentage of Actual work done (As on (1) (2) date of the certificate) (3) 1. Excavation 100% 2. Basement (if any) 50% 3. Podium (if any) N.A. 4. Plinth N.A. 5. Stilt Floor N.A. 6. Slabs of Super Structure 0% 7. Internal walls, Internal Plaster, 0% Floorings, Doors and windows within Flats/Premises 8. Sanitary Fittings within the 0% Flat/Premises 9. Staircases. Lifts Wells and Lobbies at 0% each Floor level Overhead and Underground Water Tanks 10. External plumbing and external 0% plaster, elevation, completion of terraces with waterproofing of the building/wing, 11. Installation of Lifts. Water pumps, 0% Fire Fighting Fittings and Equipment as peer CFO NOC, Electrical fittings, Mechanical equipment, and compliance to conditions of environment/CRZ NOC. Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. TABLE B Common Areas (Internal and External Development Works) in respect of the Registered Phase. Sr. No Common areas and facilities Proposed Percentage of Details (Yes/No) (1) (2) Actual Work Done (5) (3) (As on date of the Certificate) (4) 1. Internal Roads & Footpaths No. – – 2. Water Supply Yes 0% – 3. Sewerage (Chamber, lines, Yes 0% – Septic Tank, STP) 4. Storm Water Drains Yes 0% – 5. Landscaping & Tree Planting No – – 6. Street Lighting No – – 7. Community Buildings No – – 8. Treatment and disposal of No – – sewage and sullage water. 9. Solid Waste management & No – – Disposal 10. Water conservation / Rain Yes 0% – water harvesting 11. Energy management No – – 12. Fire protection and fire safety Yes 0% – requirements 13. Electrical meter room, sub- No – – station, receiving station 14. Others (Option to Add more) No – – Yours Faithfully, Agreed and Accepted by the Promoter: For M/S H.K. Design & Consultant For BLISSFUL BUILDCON LLP Mr. Waheed Ahmad Ansari Authorized Signatory Licensed Surveyor Mr. Adil Nasir Husain Momin (License No. TP/ENGR/346) Date: 31-12-2024 Date: 31-12-2024