-t I ^.i \l 'l ENTECH ENGINEERS ll Talao,Milap Nagar. M. l.O"C FORM-2 [see Regulation 3] ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account- project wise) Date:15.07.2024 To M/s. Radhika Construcdon Company RP26, Near Ganpati Visarjan Talao, MIDC, Milapnagar, Dombivli East. Pin- 421203. SubieA: Certificate of Cost lncurred for Development of TRINITV (Shashank Saptshrun6) By "Radhika Construcdon Company." for Construction of building, situated on the on plot bearing C.T.S. nos.3o84, Surve no.65, Hissa No 5. Situated at Mouje Dombivli, Dombivli West, Taluka Kalyan, Dist - Thane, Sir, We have undertaken assignment of certifoing Estimated Cost for the Subject Reat Estate Project Maha RERA, Registration No -P5170fl)55300, ln the Name'TRINITY (Slrashank Saptshrung) situated on the on plot bearing C.T.S. nos.3084, Surve no.55, Hissa No 5. Situated at Mouje Dombivli, Dombivli West, Taluka Kalyan, Dist -Thane, being developed by M/s. Radhika Construction Company. Following technical professionals are appointed by Owner / promoter: - (i) M/s/Shri Arkur Shetye as L.S. /Architect (ii) M/s /Shrl Glrlsh.S. Marathe as Structura! Consultant; (iii) M/s /Shrl Mandar Padhye as MEP Consuttant (iv) M/s /Shri I as quantity Surveyor * Completion 2. We have estimated the cost of the completion to obtain Occupation Certificate/ the project- Our estimated cost Certificatg of the Civil, MEp and Allied works, of the buildings of project under reference calculations are based on the Drawings/plans made available to us for the by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by Shri Girish.S. Marathe as Structural Consultant Quantity Surveyor*appointed made by by Developer / Engineer. The assumption of the cost of material. labour and other inputs given developer. and the site inspection carried out by us to ascertain / confirm the above analysis to us. proiect under We estimate Total Estimated Cost of completion of the building(s) of the aforesaid reference as Rs 1O2492,937.00 (Total of Table A and B). The estimated Total Cost of project is for the purpose of with reference to the civil, MEp and allied works required to be completed obtaining occuPation. On certificate / completion certificate for the buildings from the Katyan Dombivli Municipal project is being Corporatlon being the Planning Authority under whose jurisdiction the aforesaid implemented. Table A and 5. The Estimated Cost tncurred tfi $10f,l12024 is calculated at Rs- 68,87,534.fl1 Total of B). The amount of Estimated Cost lncurred is calculated on the base of amount of Total Estimated Cost. G. The Balance cost of Completion of the Civil, MEP and Allied works of the building(s) of the subject project to obtain Occupation Certifrcate / Completion Certificate from Kalyan Dombivli Municipal Corporation (planning Authority) is estimated Rs.9,56,05,403.00 (Total of Table A and B). 7. I certify that the Cost of the Civil, MEP and allied work for the aforesaid Project as completed on the date of this certificate is as given in Table A and B below: TABLE A Building /Wing bearing Number. or called'TRINITY (shashank Saptshrung.) Cost For Saleable Area available to Radhika Construction Company (To be prepared separately for each Building /Wing of the Real Estate Project) Sr. No Particulars Amounts 1 Total Estimated cost of the building Rs 10,24,92,937.00 as on- date of Registration is Cost incurred as on 30|06/2A24. Rs.68,87,534.fi1 (Based on the Estimated cost) Work done in Percentage 6.72% (As Percentage of the estimated cost) 4 Balance Cost to be lncurred Rs 9,56,05,403.fi) (Based on Estimated Cost) Cost tncurred on Additional/Extra ltems Rs. - Nil as on not included in the Estimated Cost (Annexure A) TABLE B (lnternal & External Developmentworks in respect of Registered Phase) Sr. No Particulars Amounts Total Estimated cost of the lnternal and External Rs Nil Development Works including amenities and Facilities in the laYout as on date of Registration is- Cost incurred as on 30/06/2024. Rs. Nil (Based on the Estimated cost) 3 Work done in Percentage (As Percentage of the estimated cost) 4 Balance Cost to be lncurred Rs Nil (Based on Estimated Cost) Cost lncurred on Additional/Extra ltems Rs. Nil ason- not included in the Estimated Cost (Annexure A) Yog:faithsrrv GIRISH S. MARATHE A3 {eoJ L ftcc<.gtcJ /mr sTRUcTURAL coNSULTANT Signature of Engineer For RADHIIA COIISTR {structural Engineer- 495) ?ARTIIER * Note ':'r 1. The scope of work is to complete entire Real Estate Project as per drawings approved from time to time so as to obtain Occupation C"ertificate /Completion Certificate' Z. (*) euantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor, quantity whose certificate of quantity calculated can be relied upon by the Engineer' ln case of independent place marked (*) and in case surveyor being appointed by Developer, the name has to be mentioned at the quantity are being calculated by office of Engineer, the name of the person in the office of Engineer, who is mentioned at the place marked (*). responsible for the quantity calculated should be 3. The estimated cost includes all labour, material, equipment and machinery required to carry out entire work' 4. As this is an estimated cost, any deviation in quantity required for development of the Real estate Project will result in amendment of the cost incurred/to be incurred' S. At[ eomponents of rvork rvit*r speeificeti,ans are ]ndieative and not exhaustite. Annexure A List of Extra / Additional ltems executed with Cost (Which were not part of the original Estimate of Total Cost)