I ENTECH ENGINEERS , Near Ganesh Vi*arian Tatao"Milap Nagar, M.l-8.S., ,r::. o251-243A1S1 FORM-2 [see Regulation 3] ENGINEER.S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account- Project wise) Date: L5.1.0.2O24 To M/s. Radhika Construction Company RP26, Near Ganpati Visarjan Talao, MIDC, Milapnagar, Dombivli East. Pin-42!2O3. Subject: Certificate of Cost lncurred for Development of TRINITY (Shashank Saprhrung.! By "Radhika ConsUucdon Company." for Construction of building, situated on the on plot bearing C.T.S. nos.3084, Surve no.65, Hissa No 5. Situated at Mouje Dombivli, Dombivli West, Taluka Kalyan, Dist - Thane, Sir, We have undertaken assignment of certifying Estimated Cost for the Suhject Real Estate Proiect Maha RERA, Registration No -P5170fi155300, ln the Name'TRINITY (Shashank Saptshrung.) situated on the on plot bearing C.T.S. nos.3084, Surve no.65, Hissa No 5. Situated at Mouje Dombivli, Dombivli West, Taluka Kalyan, Dist -Thane, being developed by M/s. Radhika Construction Company. 1. Following technical professionals are appointed by Owner / Promoter: - (i) M/s/Shri Ankur Shetye as L.S. / Architect; (ii) M/s /Shri Girish.S. Marathe as Structural Consultant; (iii) M/s /Shri Mandar Padhye as MEP Consultant (iv) M/s /Shri / as Quantity Surveyor * 2- We have estimated the cost of the completion to obtain Occupation Certificate/ Completion Certificate, of the Civil, MEP and Allied works, of the buildings of the project. Our estimated cost calculations are based on the Drawings/plans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by Shri Girish.S. Marathe as Struchrral Consultant Quantity Surveyor*appointed by Developer / Engineer. The assumption of the cost of material. labour and other inputs made by developer. and the site inspection carried out by us to ascertain / confirm the above analysis given to us. 3. We estimate Total Estimated Cost of completion of the building(s) of the aforesaid project under reference as Rs.16,19,61,143.00 (Total of Table A and B). The estimated Total Cost of project is with reference to the Civil, MEP and allied works required to be completed for the purpose of obtaining occupation. 4. On certificate I completion certificate for the buildings from the Kalyan Dombivli Municipal Corporation being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. The Estimated Cost lncurred tall3OlO9l2024 is calculated at Rs. 2,72,(X1,505.00 Total of Table A and B). The amount of Estimated Cost lncurred is calculated on the base of amount of Total Estimated Cost. 6. The Balance cost of Completion of the Civil, MEP and Allied works of the building(s) of the subject project to obtain Occupation Certificate / Completion Certificate from Kalyan Dombivli Muniripal Corporation (planning Authority) is estimated Rs.13,47,51,638.00 (Total of Table A and B). 7. I certifo that the Cost of the Civil, MEP and allied work for the aforesaid Project as completed on the date of this certificate is as given in Table A and B below: TABLE A Building /Wing bearing Number. or called 'TruNffY (Shashank Saptshrung.). Cost for allotted flats to society members by Radhika Construction Company Promoter (To be prepared separately for each Building /Wing of the Real Estate Project) Sr. No Particulars Amounts Total Estimated cost of the building Rs 16,19,61,143.00 as on_ date of Registration is 2 Cost incurred as on 3O/O9/2A24. Rs. 2,72,W,505.0O (Based on the Estimated cost) Work done in Percentage 16.80 % (As Percentage of the estimated cost) 4 Balance Cost to be lncurred Rs 13,47,51,538.00 (Based on Estimated Cost) 5 Cost lncurred on Additional/Extra ltems Rs. Nil as on not included in the Estimated Cost (Annexure A) TABTE B -[ {To be prepared for the entire registered phase of the Real Estate Pmiect) Sr. No Particulars Amounts Total Estimated cost of the lnternal and External Rs Nl[ Development Works including amenities and Facilities in the layout as on date of Registration is_. Cost incurred as on 3OlO9l2O24. Rs. Nlt (Based on the Estimated cost) Work done in Percentage {As Percentage of the estimated cost} 4 Balance Cost to be Incurred R5 NIL (Based on Estimated Cost) 5 Cost lncurred on Additional/Extra ltems Rs. Nil ason- not included in the Estimated Cost (Annexure Ai Yours Faithffi GrRrsii :;. ffg.rcr-d Y Ecczq,{<-J MARATHE ( $7 STRUcTURAL coNSULTANT Signature oYtngineer K,D.M.C. Licence N0.495 For RADHIKA COiISTRUCi (Structural Engineer- 495) r,tl{t NEr(_ * Note 1. The scope of work is to complete entire Real Estate Project as per drawings approved from time to time so as to obtain Occupation Certificate /Completion Certificate. 2. (*l Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor, whose certificate of quantity calculated can be relied upon by the Engineer. ln case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (*) and in case quantity are being calculated by office of Engineer, the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (*). 3. The estimated cost includes all labour, material, equipment and machinery required to carry out entire work. 4. As this is an estimated cost, any deviation in quantity required for development of the Real estate Project will result in amendment of the cost incurred/to be incurred. 5. All components of work with specifications are indicative and not exhaustive. Annexure A List of Extra / Additional ltems executed with Cost (Which were not part of the original Estimate of Total Cost)