'PNCE ARCHITECTS ARCHITECT'S CERTIFICATE Date:15i0112025 To, M/S Rndliika C{illstnictidn Cotttpany, RP26, Near Ganpati Visarjan Talao, MIDC, Milapnagar, Dombivli East. Subject: Certificate of Percentage of Completion of Construction Work of TRINITY {shashank Saptshrung) Building of the Project [MahaRERA Registration Number- P517fl!0553001 Situqted on the PIot beering C.T,S. nos.3084; Surye no,55, Higss No 5, Situated at Mouie Dombivli, Dombivli West, Taluka Kalyan, Dist - Thane,demarcated by it boundaries (latitude and longitude of the end points) 19.219701,73.083205, to the North, 19.219301, 73.083421 to the South, 19.2195440 73.083485 to the East, 19.219453, 73.083174 to West of Division Konkan at Dombivli ( West ) taluka Kalyan District Thane PIN 42f202 admeasuring 1999.60 sq. mts. Area being developed by lWs. Radhike Construcfion Corrrpany. Sir, I Mr. Ankur A. Shetye have undertaken assignment as Architect/Licensed Surveyor of certifoing Percentage of Completion of Construction Work of the tRtrutW (Shashank Saptshrung) building Situated on the plot bearing C.T.S. nos.3084, Surve no.65, Hissa No 5. of Division Konkan at Dombivli ( West ) at taluka Kalyan District Thane PIN 421202 admeasuring 1999.60 sq. mts. Area being developed by IV/s. Radhika Construction Company Based on Site Inspection, with respect to each of the Building/lVing of the aforesaid Real Estate Project, I certiff that as on the date of this certificate, the Percentage of Work done for each of the building/![ing of the Real Estate Project as registered vide number P 5't700055300 under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. (X12, Om Krishna Krupa CHS, Opp Shastri Hall, Dattanagar, Dombivli lEl121201 trlob. 86910188&1 Table A Sr. No Tasks/Activity Percentage Of work done I Excavation 100% 2 ONE number of Basement(s) and Plinth t00% 3 -number of Podiums NIL 4 ONE Stilt Floor a% 5 I number of Slabs of Super Structure 27% 6 Internal walls, lntemal Plaster, Floorings within Flats/ Premises, Doors and windows to 0% each of the flat/ Premises 7 Sanitary Fittings within the Flat/Premises, Eleckical Fittinss within the Flat/Premises 0% 8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, 0Vo Overhead and Underground Water Tanks 9 The external plumbing and external plaster, slevation completion of tsrracEs with ff/a waterproofins of the Buildine/Wing, l0 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment/CRZ NOC, a% Finishing to entrance lobby/s, plinth protection, pavrng of areas apartment to building/wing, Compoundwall and all other requirements as may be required to obtain occunation/completion certificate (Xl2, Om Krishna Krupa CHS, Opp Shastri Hall, Dattanagar, Dombivli ( E ) /f2t20f ilob. 869101E8E4 L Table B Sr. Common areas and Facilities Proposed Percentage of Details No Amenities (YesArlo) Work Done I Internal Roads & Footpaths NO 0Yo 2 Water Supply YES 0% 3 Sewerages (chamber, lines, Septic YES Tanlq STP) 0% 4 Storm Water Drains YES 0% 5 Landscaping & Tree Planting NO 0% 6 Street Liehtine NO 0% 7 Community Buildings NO 0% 8 Treatment and disposal of sewage NO 016 and sullage water 9 Solid Wasts management & Disposal NO 0o/" l0 Water Conservation, Rain water YES 0% harvestine ll Eflergy Management NO a% l2 Fire protection and fire safetY YES 0% reouirements l3 Others (Option to add more) Yours Faithfully FOR SPACE EIYVTRO ARCHITECTS, -t \ , \Y . ). ',. tll 6 AR. AT{KUR A. SHETYE (c&l20ool26109) Agreed And Accepted By: For RADHIKA CONSTRUCTION CO. l,,'*!Y A IT/ PARTI{ER Sigrature of PromoteY ..* Name : M/S Radhika Construction Co Date: 15/0112025 002, Om Krishna Krupa CHS, Opp Shastri Hall, Dattanagar, Dombivli ( E ) 421201 Mob.8691018884